| Buffalo & Erie Co Public Library |
$660,623.00 |
Erie |
280 Porter Ave, Buffalo, NY 14201 |
Buffalo & Erie Co Public Library |
Replace: leaking roof; single pane windows; original, 1st floor tiles, re-configuring/updating circulation area; and adding access controls/CCTV. |
2021 |
|
|
| The Hulbert Library Of The Town Of C |
$206,772.00 |
Erie |
18 Chapel Street Springville, NY 14141 |
Buffalo & Erie Co Public Library |
The Concord Public Library seeks to repave the parking lot, install LED lighting and create an outdoor program and reading area. |
2023 |
147 |
60 |
| Clarence Public Library |
$49,161.00 |
Erie |
3 Town Place, Clarence NY 14031 |
Buffalo & Erie Co Public Library |
The library will replace one of the library's AC compressors as well as the replacement of the boiler with an energy efficient unit. |
2025 |
144 |
60 |
| Cheektowaga Public Library |
$298,099.00 |
Erie |
2580 Harlem Road, Cheektowaga NY 14225 |
Buffalo & Erie Co Public Library |
The proposed project will replace a leaking flat roof, replace damaged vertical support columns, and replace associated cement bases and footers. |
2025 |
143 |
63 |
| Buffalo & Erie County Public Library |
$1,695,636.00 |
Erie |
1 Lafayette Square, Buffalo NY 14203 |
Buffalo & Erie Co Public Library |
This project will consist of a full replacement of the Central Library roof. |
2025 |
141 |
63 |
| Elma Public Library |
$23,956.00 |
Erie |
1860 Bowen Road, Elma NY 14059 |
Buffalo & Erie Co Public Library |
The library will replace the building's aged and ineffective HVAC system. |
2025 |
147 |
60 |
| Lackawanna Public Library |
$30,227.00 |
Erie |
560 Ridge Road, Lackawanna NY 14218 |
Buffalo & Erie Co Public Library |
The project involves the replacement of the two boilers and the hot water heater housed in the boiler room of the library. |
2025 |
142 |
63 |
| Newstead Public Library |
$22,568.00 |
Erie |
33 Main Street, Akron NY 14001 |
Buffalo & Erie Co Public Library |
This construction project will involve the removal and replacement of the existing fire system with a new addressable system and equipment. |
2025 |
144 |
60 |
| Angola Public Library |
$9,207.00 |
Erie |
34 N. Main St. Angola, NY 14006 |
Buffalo & Erie Co Public Library |
Add fabric reinforced roofing restoration system to center section roof and replace inoperable Library Office exit door. |
2023 |
147 |
60 |
| Town Of Tonawanda Public Library |
$123,093.00 |
Erie |
318 Montrose Ave Buffalo, NY 14223 |
Buffalo & Erie Co Public Library |
Reconfiguration of existing single occupancy restrooms at Kenilworth Public Library to construct an accessible restroom for the public. |
2024 |
140 |
61 |
| Buffalo & Erie Co Public Library |
$577,207.00 |
Erie |
1 Lafayette Square Buffalo, NY 14203 |
Buffalo & Erie Co Public Library |
Replace mixing box temperature controls, rehab 22 interior marble columns, and reconfigure the 1st floor to accommodate new teen and children areas. |
2024 |
141 |
63 |
| Hamburg Public Library |
$43,750.00 |
Erie |
4857 Lake Shore Rd. Hamburg, NY 14075 |
Buffalo & Erie Co Public Library |
The Hamburg Public Library requests $43,750 in funding to rehabilitate the parking lot at the Lake Shore Library. |
2024 |
149 |
60 |
| Grand Island Memorial Library |
$4,571.00 |
Erie |
1715 Bedell Rd. Grand Island, NY 14072 |
Buffalo & Erie Co Public Library |
Public restroom partitions and north entrance walkway renovation for safety and handicap accessibility improvements. |
2023 |
145 |
61 |
| Buffalo & Erie Co Public Library |
$444,507.00 |
Erie |
1187 E. Delavan Ave Buffalo, NY 14215 |
Buffalo & Erie Co Public Library |
Replace main roof, HVAC and add Energy Mgmt. System interface. Rehabilitate parking lot, & front facade. |
2023 |
141 |
63 |
| Buffalo & Erie Co Public Library |
$318,168.00 |
Erie |
1324 Jefferson Ave. Buffalo, NY 14208 |
Buffalo & Erie Co Public Library |
Restore the library's leaking roof & domes. Improve safety by adding access controls, a lock-down system & Knox Box |
2023 |
141 |
63 |
| Buffalo & Erie Co Public Library |
$645,493.00 |
Erie |
1 Lafayette Square Buffalo, NY 14203 |
Buffalo & Erie Co Public Library |
Replace exterior doors, install entry door lockdown system, install knox boxes, install bullet resistant film, rehab loading dock concrete & drain. |
2023 |
141 |
63 |
| Boston Free Library |
$29,497.00 |
Erie |
9475 Boston State Road Boston, NY 14025 |
Buffalo & Erie Co Public Library |
Construct 20x40 foot pavilion to serve as expanded program space, increasing accessibility & effectiveness of library service for large programs. |
2023 |
147 |
60 |
| Western Town Library |
$10,834.00 |
Oneida |
9172 Main St, Westernville, NY 13486 |
Mid York Library System |
Replace 2 Split Unit Air Conditioners and a 1000 Gallon LP Tank |
2021 |
|
|
| Little Falls Public Library |
$270,194.00 |
Herkimer |
10 Waverly Place Little Falls , NY 13365 |
Mid York Library System |
The construction project is the installation of a new elevator and upgrade to existing elevator to provide full building access. |
2023 |
118 |
49 |
| Old Forge Library |
$42,582.00 |
Herkimer |
220 Crosby Blvd Old Forge, NY 13420 |
Mid York Library System |
Rebuild concrete stairs, replace broken sidewalks, replace loose gravel path with paved path, install security cameras |
2023 |
118 |
49 |
| Waterville Public Library |
$8,175.00 |
Oneida |
206 White Street Waterville, NY 13480 |
Mid York Library System |
Replace the five failed upper windows in the library main room with low E-Argon vinyl windows, insulate and seal all windows. |
2023 |
122 |
53 |
| Sherrill-Kenwood Free Library |
$53,304.00 |
Oneida |
543 Sherrill Road Sherrill, NY 13461 |
Mid York Library System |
Install new roof, Install new down spouts, Install new security cameras, Replace toilets, Renovate Children's Room, Replace Windows, Replace lights |
2023 |
122 |
53 |
| Sullivan Free Library |
$150,194.00 |
Madison |
101 Falls Blvd Chittenango, NY 13037 |
Mid York Library System |
To install an elevator, to provide access to the basement for future program space expansion. |
2023 |
122 |
53 |
| Poland Public Library |
$48,825.00 |
Herkimer |
8849 North Main Street Poland, NY 13431 |
Mid York Library System |
Install insulation in walls and floors in upper level and basement of original library, upgrade electrical and windows to improve energy efficiency |
2023 |
118 |
49 |
| Dunham Public Library |
$369,633.00 |
Oneida |
76 Main Street Whitesboro, NY 13492 |
Mid York Library System |
Rehabilitation of three library toilet rooms to current ADA standards, new toilet room, create a new public room, new sidewalks, and roadside sign. |
2023 |
119 |
53 |