| Stillwater Public Library |
$134,775.00 |
Saratoga |
712 Hudson Avenue Stillwater, NY 12170 |
Southern Adirondack Library System |
Upgrade upper windows with energy efficient, commercial, operable window units, parking lot development, and renovation the exterior walls. |
2023 |
113 |
44 |
| Waterford Public Library |
$220,025.00 |
Saratoga |
117 3rd St Waterford, NY 12188 |
Southern Adirondack Library System |
Replacement of a slate roof that is over 125 years old and in such disrepair that it will affect ability to obtain insurance coverage. |
2023 |
108 |
44 |
| Caldwell-Lake George Library |
$37,068.00 |
Warren |
336 Canada Street, Lake George NY 12845 |
Southern Adirondack Library System |
Main and Lower Level interior renovations for rest room accessibility improvements at the Caldwell-Lake George Library. |
2025 |
114 |
45 |
| Easton Library |
$506,221.00 |
Washington |
1074 State Route 40, Greenwich NY 12834 |
Southern Adirondack Library System |
Expansion of the existing Library adding a handicap accessible entry vestibule, staff office, Children's Library Space and Local History/Study Room. |
2025 |
107 |
43 |
| Stillwater Public Library |
$337,500.00 |
Saratoga |
662 Hudson Avenue, Stillwater, NY 12170 |
Southern Adirondack Library System |
The Stillwater Public Library will purchase a former factory to use as a new building. |
2021 |
|
|
| Bancroft Public Library |
$14,231.00 |
Washington |
181 Main Street, Salem, NY 12865 |
Southern Adirondack Library System |
Six (6) single-pane windows will be replaced to improve energy efficiency. Minor masonry work will be performed at one window opening. |
2021 |
|
|
| Pember Library & Museum |
$11,129.00 |
Washington |
33 W Main St, Granville, NY 12832 |
Southern Adirondack Library System |
The project will install new roof deck, new slate, new flashing to prevent any moisture intrusion and provide a safe and habitable public space. |
2021 |
|
|
| Town Of Lake Pleasant Public Library |
$4,315.00 |
Hamilton |
2864 State Route 8 Speculator, NY 12164-0074 |
Southern Adirondack Library System |
This project will connect our east and west parking lots with a wheelchair accessible path so patrons of all abilities can enter and exit safely. |
2024 |
118 |
49 |
| Saratoga Springs Public Library |
$464,175.00 |
Saratoga |
49 Henry Street, Saratoga Springs NY 12866 |
Southern Adirondack Library System |
The project will upgrade an elevator that has reached the end of its useful life in order to ensure accessibility and safety, and conserve energy. |
2025 |
113 |
44 |
| Greenwich Free Library |
$70,249.00 |
Washington |
148 Main Street, Greenwich NY 12834 |
Southern Adirondack Library System |
Create collection space in the basement, replace ceilings and lighting fixtures with LED lighting to increase services and sustainability. |
2025 |
113 |
43 |
| Stillwater Public Library |
$14,726.00 |
Saratoga |
712 Hudson Avenue Stillwater, NY 12170 |
Southern Adirondack Library System |
Installation of DDC Control System for the boiler in the newly renovated library to increase efficiency of the furnace. |
2024 |
113 |
44 |
| Schuylerville Public Library |
$163,800.00 |
Saratoga |
37 Church St Schuylerville, NY 12871 |
Southern Adirondack Library System |
Demolition of existing residence and site preparation work for future expansion of Schuylerville Public Library. |
2024 |
113 |
44 |
| Clifton Park Halfmoon Public Library |
$200,306.00 |
Saratoga |
475 Moe Road Clifton Park, NY 12065 |
Southern Adirondack Library System |
Create new functional spaces in the Children's Library including a new lactation room, an educational activities area and a technology hub. |
2024 |
112 |
44 |
| Cambridge Public Library |
$231,474.00 |
Washington |
21 W. Main St. Cambridge, NY 12816 |
Southern Adirondack Library System |
Reading/program room addition is being built off from the 1987 addition at ground level to alleviate the need for accessible meeting/gathering space. |
2024 |
107 |
43 |
| Ballston Spa Public Library |
$502,474.00 |
Saratoga |
21 Milton Avenue Ballston Spa, NY 12020 |
Southern Adirondack Library System |
Reading Room/Local History Addition |
2024 |
112 |
44 |
| Bancroft Public Library |
$10,450.00 |
Washington |
181 S Main Street Salem, NY 12865 |
Southern Adirondack Library System |
Five (5) single-pane windows (3 double-hung, 2 transom) will be made energy efficient, and two (2) exterior electric outlets will be added. |
2024 |
114 |
43 |
| Brooklyn Public Library |
$3,476,772.00 |
Kings |
10 Grand Army Plaza Brooklyn, NY 11238 |
Brooklyn Public Library |
The project will reorganize the Central library/headquarter of BPL. It will redistribute office spaces and provide new upgraded spaces to the public. |
2023 |
44 |
20 |
| Brooklyn Public Library |
$1,424,459.00 |
Kings |
135 Plymouth Street, Brooklyn, NY 11201 |
Brooklyn Public Library |
BPL is looking to open a branch library facility within the DUMBO/Vinegar Hill/Farragut neighborhoods - an emerging community with new schools etc. |
2021 |
|
|
| Brooklyn Public Library |
$4,448,139.00 |
Kings |
665 New Lots Avenue, Brooklyn NY 11207 |
Brooklyn Public Library |
The new library will replace the existing structure which no longer meets the community's needs, operational demands, or current energy codes. |
2025 |
60 |
19 |
| Brooklyn Public Library |
$3,518,426.00 |
Kings |
1580 Rockaway Avenue Brooklyn, NY 11236 |
Brooklyn Public Library |
A new Library replacing the old structure that no longer meets the community requirements, operational and service needs, or today's energy codes. |
2024 |
59 |
19 |
| Brooklyn Public Library |
$3,335,402.00 |
Kings |
5902 23rd Ave, Brooklyn, NY 11204 |
Brooklyn Public Library |
Renovate the existing Ryder Branch to bring it to current standards for energy efficiency and durability, and provide a modern level of service. |
2022 |
|
|
| Brooklyn Public Library - Sunset Park Library |
$3,379,096.00 |
Kings |
5108 Fourth Avenue Brooklyn NY 11220 |
Brooklyn Public Library |
Development of the site of the old library into a mixed-use building increasing the space of the old branch library from 12,000 sq ft to 20,755 sq ft. |
2020 |
|
|
| Buffalo & Erie Co Public Library |
$660,623.00 |
Erie |
280 Porter Ave, Buffalo, NY 14201 |
Buffalo & Erie Co Public Library |
Replace: leaking roof; single pane windows; original, 1st floor tiles, re-configuring/updating circulation area; and adding access controls/CCTV. |
2021 |
|
|
| Grand Island Memorial Library |
$17,865.00 |
Erie |
1715 Bedell Rd, Grand Island, NY 14072 |
Buffalo & Erie Co Public Library |
Light pole and sidewalk replacement to improve accessibility, safety, and public services. Partial foundation rehab of Grand Island Memorial Library. |
2021 |
|
|
| Town Of North Collins Public Library |
$5,455.00 |
Erie |
2095 School Street, North Collins, NY 14111 |
Buffalo & Erie Co Public Library |
North Collins Library is requesting funding to replace the all the interior, less efficient fluorescent fixtures and bulbs with high efficiency LEDs. |
2021 |
|
|