| John C Hart Memorial Library |
$68,842.00 |
Westchester |
1130 E. Main Street Shrub Oak, NY 10588 |
Westchester Library System |
Upgrade fire safety and optimize existing building footprint to expand library program space, gaining larger community meeting room and storytime room |
2023 |
95 |
40 |
| North Castle Public Library |
$3,210.00 |
Westchester |
10 Clove Road North White Plains, NY 10603 |
Westchester Library System |
Project will install security cameras and a monitoring system throughout the North White Plains Library Branch. |
2023 |
93 |
37 |
| Tuckahoe Public Library |
$59,790.00 |
Westchester |
71 Columbus Ave Tuckahoe, NY 10707 |
Westchester Library System |
The Tuckahoe Library is going to install new Humidity Control system (Dehumidifier) and also a new furnace for the exterior radiant heating control. |
2023 |
88 |
37 |
| Warner Library |
$106,125.00 |
Westchester |
121 North Broadway Tarrytown, NY 10591 |
Westchester Library System |
LED lighting and a new drop ceiling will be installed in the children's room to provide better energy efficiency |
2023 |
92 |
35 |
| Yonkers Public Library |
$587,794.00 |
Westchester |
1500 Central Park Avenue Yonkers, NY 10710 |
Westchester Library System |
This project will replace and improve Will Library's failed 30-year-old HVAC system with a more efficient and sustainable air-cooled chiller. |
2023 |
90 |
37 |
| Bedford Hills Free Library |
$21,593.00 |
Westchester |
26 Main Street Bedford Hills, NY 10507 |
Westchester Library System |
The Library will install new data lines to support the WLS-ILS network upgrade to ensure fast, secure, and optimal performance for library patrons. |
2023 |
93 |
40 |
| Greenburgh Public Library |
$218,159.00 |
Westchester |
300 Tarrytown Rd. Elmsford, NY 10523 |
Westchester Library System |
Rehabilitation of front entrance library vestibule & outside overhead canopy to mitigate leaks in both areas. |
2023 |
92 |
35 |
| Hastings-On-Hudson Public Library |
$173,125.00 |
Westchester |
7 Maple Avenue Hastings-on-Hudson, NY 10706 |
Westchester Library System |
The Hastings-on-Hudson Public Library Air Conditioning Replacement project will replace the 30-year-old, failing chiller and air handling equipment. |
2023 |
92 |
35 |
| Hendrick Hudson Free Library |
$103,572.00 |
Westchester |
185 Kings Ferry Road Montrose, NY 10548 |
Westchester Library System |
The project will replace the remaining 4 original HVAC condensers, coils, valves, piping and control software with more efficient equipment. |
2023 |
95 |
40 |
| Lewisboro Library |
$3,122.00 |
Westchester |
15 Main Street South Salem, NY 10590 |
Westchester Library System |
The Lewisboro Library will replace failing components of our HVAC rooftop units. |
2023 |
93 |
40 |
| New Rochelle Public Library |
$172,271.00 |
Westchester |
1 Library Plaza, c/o Administrative Office New Rochelle, NY 10801 |
Westchester Library System |
Installation of sound absorbing panels around appropriate areas of the library will significantly reduce noise reverberation in the building |
2023 |
91 |
34 |
| New Rochelle Public Library |
$24,380.00 |
Westchester |
794 North Avenue New Rochelle, NY 10801 |
Westchester Library System |
Exterior: Create Art Wall, Basement: Rework flooring, craft/prep kitchen, First: Establish receiving area, upgrade work area, Second: Improve storage |
2023 |
88 |
37 |
| North Castle Public Library |
$13,915.00 |
Westchester |
19 Whippoorwill Road East North Castle, NY 10504-1416 |
Westchester Library System |
Project will install security cameras and a monitoring system throughout the Armonk Library Branch. |
2023 |
93 |
37 |
| Bronxville Public Library |
$12,420.00 |
Westchester |
201 Pondfield Road, Bronxville, NY 10708 |
Westchester Library System |
New controllers will be installed on new fan coil units that service the upper floor of the library building and interfaced with new Library BMS. |
2022 |
|
|
| Dobbs Ferry Public Library |
$30,650.00 |
Westchester |
55 Main St., Dobbs Ferry, NY 10522 |
Westchester Library System |
The Dobbs Ferry Public Library Building Upgrades project will replace failed HVAC compressors and add automatic door openers to two entrances. |
2022 |
|
|
| Eastchester Public Library |
$279,843.00 |
Westchester |
11 Oakridge PL, Eastchester, NY 10709 |
Westchester Library System |
The rebuilding of the upper deck, machine room, adjoining handicapped bathroom and replacement of elevator damaged by long-term water infiltration. |
2022 |
|
|
| Greenburgh Public Library |
$19,632.00 |
Westchester |
300 Tarrytown Rd, Elmsford, NY 10523 |
Westchester Library System |
Install ADA compliant sliding entrance doors with keyless access. |
2022 |
|
|
| Harrison Public Library |
$150,136.00 |
Westchester |
2 Madison Street, West Harrison, NY 10604 |
Westchester Library System |
The West Harrison Library Branch will construct an innovative Library Without Walls reading and community programming garden adjacent to the library. |
2022 |
|
|
| Hastings-On-Hudson Public Library |
$8,500.00 |
Westchester |
7 Maple Avenue, Hastings-on-Hudson, NY 10706 |
Westchester Library System |
Replace 2 public water fountains with bottle refill stations and 4 bathroom faucets with motion sensor turn-off with respective sinks and countertop. |
2022 |
|
|
| Hendrick Hudson Free Library |
$38,425.00 |
Westchester |
185 Kings Ferry Road, Montrose, NY 10548 |
Westchester Library System |
This project will upgrade the original 25 year old boiler to more energy efficient duel staged boilers. |
2022 |
|
|
| Irvington Public Library |
$73,414.00 |
Westchester |
12 S Astor St., Irvington , NY 10533 |
Westchester Library System |
Convert two single-gender restrooms to two all gender restrooms and one family restroom and add UVC lights to air handler to improve air quality. |
2022 |
|
|
| John C. Hart Memorial Library |
$60,821.00 |
Westchester |
1130 E. Main Street, Shrub Oak, NY 10588 |
Westchester Library System |
Upgrade broadband infrastructure for entire building and expand wifi. Upgrade of electronics for elevator to insure ADA compliance into the future. |
2022 |
|
|
| Larchmont Public Library |
$31,900.00 |
Westchester |
121 Larchmont Ave, Larchmont, NY 10538 |
Westchester Library System |
Replace fluorescent lights with LED lights on Lower Level of the 1995 addition of the Library. Replacement of drop ceiling tiles. |
2022 |
|
|
| New Rochelle Public Library |
$342,674.00 |
Westchester |
1 Library Plaza, c/o Administrative Office, New Rochelle, NY 10801 |
Westchester Library System |
Renovation of third floor space to include reconfiguration of overall space, energy-efficient lighting, new furniture, fixtures, wall and floors. |
2022 |
|
|
| New Rochelle Public Library |
$17,812.00 |
Westchester |
794 North Avenue, New Rochelle, NY 10804 |
Westchester Library System |
Replacement of the 3 ductless mini split air conditioning units at branch Children's Library is necessary. |
2022 |
|
|