System |
Library Name |
County |
Sen. Dist. |
Asy. Dist. |
Project Description |
Amount |
System Total |
Brooklyn Public Library |
$450,138,816.28 |
|
Arlington |
Kings |
17 |
54 |
New boiler; roof replacement; branch restoration |
$9,908,662.78 |
Bay Ridge |
22 |
60 |
Public Service (PS) Enhancements |
$861,622.85 |
Bedford |
18 |
57 |
New HVAC & boiler; interior rehab; windows |
$3,446,491.40 |
Borough Park |
21 |
48 |
New boiler & HVAC; interior rehab; windows; roof replacement |
$9,477,851.35 |
Brighton Beach |
27 |
46 |
New boiler & HVAC; branch renovation |
$3,877,302.83 |
Brooklyn Heights |
25 |
52 |
Branch renovation; windows; ADA compliance |
$13,872,127.89 |
Brower Park |
20 |
43 |
Roof replacement; purchase leased facility;branch renovation |
$11,201,097.05 |
Brownsville |
19 |
55 |
New boiler & HVAC; interior rehab; exterior rehab |
$6,720,658.23 |
Bushwick |
17 |
53 |
Total branch rehabilitation |
$8,443,903.93 |
Canarsie |
19 |
59 |
New building on site |
$17,232,457.00 |
Carroll Gardens |
25 |
52 |
Roof replacement; branch renovation |
$9,994,825.06 |
Central Library |
20 |
52 |
Total branch rehabilitation |
$86,851,583.28 |
Clarendon |
21 |
58 |
New boiler & HVAC; ADA compliance; roof; interior rehab |
$3,704,978.26 |
Clinton Hill |
18 |
57 |
Total branch rehabilitation |
$6,031,359.95 |
Coney Island |
23 |
46 |
New boiler; façade renovations; new windows; PS enhancements |
$5,169,737.10 |
Cortelyou |
21 |
44 |
PS enhancements; FF&E |
$1,464,758.85 |
Crown Heights |
20 |
43 |
Purchase leased facility; PS enhancements |
$5,342,061.67 |
Cypress Hills |
17 |
40 |
PS enhancements |
$2,326,381.70 |
DeKalb |
17 |
53 |
New boiler; basement renovations;exterior rehab;windows |
$7,754,605.65 |
Dyker |
22 |
46 |
ADA accessibility; windows |
$4,480,438.82 |
East Flatbush |
19 |
58 |
Roof replacement; new HVAC system; branch renovations |
$7,151,469.66 |
Eastern Parkway |
20 |
56 |
Total branch rehabilitation |
$8,960,877.64 |
Flatbush |
20 |
43 |
Fire alarm; Abatement; PS enhancements |
$1,637,083.42 |
Flatlands |
27 |
59 |
Total branch rehabilitation |
$8,443,903.93 |
Fort Hamilton |
22 |
46 |
Furniture and equipment upgrade |
$802,500.00 |
Gerritsen Beach |
22 |
59 |
Façade; new roof; PS enhancements |
$4,911,250.25 |
Gravesend |
22 |
47 |
Purchase leased facility |
$4,308,114.25 |
Greenpoint |
25 |
50 |
New building on site |
$20,678,948.40 |
Highlawn |
22 |
47 |
New HVAC; boiler |
$1,723,245.70 |
Homecrest |
27 |
45 |
Purchase leased facility; branch renovations |
$6,892,982.80 |
Jamaica Bay |
19 |
59 |
PS enhancements |
$861,622.85 |
Kings Bay |
27 |
44 |
Exterior renovations; new HVAC; roof replacement; PS enhancements |
$5,600,548.53 |
Leonard |
17 |
53 |
Total branch rehabilitation; new boiler |
$9,994,825.06 |
Macon |
18 |
56 |
Rear retaining wall |
$861,622.85 |
Mapleton |
22 |
49 |
Exterior restoration; roof replacement |
$3,446,491.40 |
Marcy |
18 |
56 |
HVAC; boiler; roof replacement; Exterior rehab, PS enhancements |
$6,031,359.95 |
McKinley Park |
23 |
48 |
Purchase leased facility; branch renovations |
$8,960,877.64 |
Midwood |
27 |
45 |
Boiler; PS enhancements |
$2,929,517.69 |
Mill Basin |
27 |
59 |
New windows and doors; abatement |
$3,446,491.40 |
New Lots |
19 |
40 |
New boiler & HVAC; interior renovation; windows |
$8,616,228.50 |
New Utrecht |
22 |
49 |
New boiler & HVAC; interior renovation |
$10,167,149.63 |
Pacific |
18 |
57 |
New boiler; interior rehabilitation / ADA compliance |
$12,924,342.75 |
Paerdegat |
19 |
41 |
Roof replacement; purchase leased facility; PS enhancements; new boiler & HVAC; ADA compliance |
$7,668,443.37 |
Park Slope |
18 |
44 |
Interior renovation |
$8,185,417.08 |
Rugby |
21 |
58 |
New boiler; parking lot renovations; FF&E |
$2,154,057.13 |
Ryder |
27 |
47 |
New boiler & HVAC; interior rehabilitation |
$6,634,495.95 |
Saratoga |
18 |
55 |
New boiler & HVAC; interior rehabilitation |
$5,772,873.10 |
Sheepshead Bay |
27 |
45 |
Purchase leased facility; interior renovation |
$9,477,851.35 |
Spring Creek |
19 |
40 |
New HVAC system; interior rehab |
$2,498,706.27 |
Stone Avenue |
19 |
55 |
New boiler; PS enhancements;Windows, Exterior rehab |
$2,843,355.41 |
System-wide |
Various |
Various |
Hazardous materials abatement & ADA compliance survey |
$3,446,491.40 |
System-wide |
Various |
Various |
Install Building Automation Systems & other needs |
$8,616,228.50 |
Ulmer Park |
22 |
47 |
Total branch rehabilitation |
$8,616,228.50 |
Walt Whitman |
18 |
50 |
Roof replacement; interior renovation |
$8,443,903.93 |
Washington Irving |
17 |
53 |
Total branch rehabilitation |
$6,892,982.80 |
Williamsburgh |
25 |
50 |
Exterior renovation; windows; roof restoration; window replacement |
$5,600,548.53 |
Windsor Terrace |
20 |
44 |
New roof; interior rehabilitation / ADA compliance |
$5,772,873.10 |
System |
Library Name |
County |
Sen. Dist. |
Asy. Dist. |
Project Description |
Amount |
System Total |
Buffalo & Erie County Public Library |
$57,081,519.00 |
|
Alden (Ewell) Free Library |
Erie |
59 |
142 |
Construction of a parking lot; interior renovations to meet ADA requirements and provide new children's room; replace HVAC on upper floor with energy efficient units; and install full energy efficient HVAC in basement. |
$330,250.00 |
Amherst Public Library/ Audubon Library |
61 |
148 |
Expand library; replace sidewalks |
$830,000.00 |
Amherst Public Library/ Eggertsville-Snyder Library |
61 |
148 |
Replace windows and front door with energy efficient units; replace front entrance sidewalk pad; and restore chimney |
$50,000.00 |
Angola Public Library |
59 |
146 |
Expansion of 1,138 sq. ft. for additional meeting/program space, additional space to house the collection |
$275,769.00 |
Aurora Town Public Library |
59 |
142 |
Expansion or new facility: including additional space for meeting/program room, staff offices, collections, patron seating and public access computers; and/or replace lighting with new, state of the art, energy-efficient lighting system; replacement of front entry doors with energy-efficient, ADA compliant units |
$5,018,000.00 |
BECPL - Central Library |
58 |
141 |
Space Renovation/Reconfiguration/Asbestos Abatement for Phased for Exhibit Space/Cultural Tourism and balance of facility; Replace Central Library Escalators with ADA Elevators; Ellicott Entrance to ADA; and Mezzanine Space Construction. |
$16,850,000.00 |
BECPL - Crane Branch |
60 |
144 |
New or expanded facility; replace windows with energy-efficiency upgrades |
$3,550,000.00 |
BECPL - Dudley Branch |
58 |
145 |
New or expanded facility; replace windows with energy-efficiency upgrades; replace existing floor to incorporate new wiring and electrical for connectivity and computer terminals |
$3,600,000.00 |
BECPL - East Clinton Branch |
58 |
145 |
Expand existing facility, including land acquisition; Replace lighting with new, energy-efficient lighting system; replace of existing floor to incorporate new wiring and electrical for connectivity and computer terminals |
$1,610,000.00 |
BECPL - East Delavan Branch |
60 |
141 |
Elevator, renovations to make all areas of the library accessible to patrons in wheelchairs, handicapped accessible restrooms |
$350,000.00 |
BECPL - Frank E. Merriweather, Jr. Branch |
60 |
141 |
Additional ADA door openers |
$5,000.00 |
BECPL - Niagara Branch |
58 |
144 |
Replace boilers with geothermal wells |
$130,000.00 |
BECPL - North Park Branch |
60 |
144 |
New and/or expanded and renovated facility |
$3,500,000.00 |
BECPL - Riverside Branch |
60 |
144 |
Expand facility; replace existing lighting with energy-efficient lighting system; and ceiling tiles to improve energy conservation |
$520,000.00 |
Cheektowaga Public Library/Anna Reinstein Memorial Library |
58 |
143 |
Rehabilitate parking lot |
$15,500.00 |
Cheektowaga Public Library/Julia B. Reinstein Library |
58 |
143 |
Rehabilitate parking lot |
$5,000.00 |
City of Tonawanda Public Library |
61 |
140 |
Replace HVAC system; rehabilitate the library's exterior walls; and replace deteriorated sidewalks |
$175,000.00 |
Clarence Public Library |
61 |
142 |
Convert existing alcoves to enclosed study areas; construct wind barrier for front entry to building. |
$45,000.00 |
Collins Public Library |
59 |
146 |
Installation of electric door openers to make front entry doors more easily ADA accessible |
$5,000.00 |
Elma Public Library |
59 |
142 |
New facility |
$5,000,000.00 |
Grand Island Memorial Library |
60 |
144 |
Roof replacement |
$110,000.00 |
Hamburg Public Library: Hamburg Main Library |
58 |
146 |
Additional meeting/program room space, reconstruct entrance for improved accessibility, additional space to accommodate 10 years’ growth of the collection. |
$750,000.00 |
Hamburg Public Library: Lake Shore Branch |
58 |
146 |
Replace with new expanded facility ($3,500,000) |
$3,500,000.00 |
Lackawanna Public Library |
58 |
146 |
Restoration of ceiling, upgrades to heating system, reconstruct chimney |
$75,000.00 |
Lancaster Public Library |
59 |
143 |
Parking lot expansion; new wiring for electrical equipment and telecommunications; resurface/recondition existing concrete floor; replace original single pane windows with energy efficient units; replace inefficient globe lighting; and replace deteriorated ceiling sections. |
$400,000.00 |
Marilla Free Library |
59 |
142 |
Reconstruct ADA entry, enclosure and Lift to Lower Level; and reconfigure existing 3,400 square foot library to create more economical use of space including the expansion of the library's Employment/Education Resource Center |
$262,000.00 |
Newstead Public Library |
61 |
142 |
Outdoor equipment storage shed |
$15,000.00 |
Orchard Park Public Library |
59 |
145 |
Expansion, generator |
$1,255,000.00 |
Town of Tonawanda Public Library |
61 |
140 |
New building, equipment and furnishings |
$7,000,000.00 |
West Seneca Public Library |
58 |
145 |
Expansion, new floors, lighting, theft detection. Convert existing meeting room to computer lab and replace aging HVAC with energy efficient units. |
$1,850,000.00 |
System |
Library Name |
County |
Sen. Dist. |
Asy. Dist. |
Project Description |
Amount |
System Total |
Chautauqua Cattaraugus Library System |
$24,183,000.00
|
|
Allegany Public Library |
Cattaraugus |
57 |
149 |
Elevator, new HVAC system, rewiring for computers, new lighting, public meeting room, addition |
$398,000.00 |
Cattaraugus Free Library |
57 |
149 |
New windows and doors |
$15,000.00 |
Ellicottville Memorial Library |
57 |
149 |
Storage area (attached to building with outside entrance) |
$10,000.00 |
Olean Public Library |
57 |
149 |
Renovate existing building, including a 11,000 sq. ft. Addition, replacement of HVAC system, and new roof |
$4,000,000.00 |
Portville Free Library |
57 |
149 |
New balustrades, extend parking lot, addition |
$1,250,000.00 |
Salamanca Public Library |
57 |
149 |
Replacement of windows and vinyl siding |
$25,000.00 |
Seneca-Nation-Allegany Branch |
57 |
149 |
New library building |
$1,500,000.00 |
Ahira Hall Memorial Library |
Chautauqua |
57 |
150 |
New facility |
$3,000,000.00 |
Alexander Findley |
57 |
150 |
Renovate existing space and build 10' x 30' addition with separate wheelchair accessible entrance |
$75,000.00 |
Ashville Free Library |
57 |
150 |
Addition for a children's room and storage space, new windows and doors, wheelchair ramp, new roof, renovate second floor |
$270,000.00 |
Bemus Point Public Library |
57 |
150 |
Office for librarian and staff |
$10,000.00 |
Cassadaga Branch |
57 |
150 |
New roof |
$65,000.00 |
Clymer-French Creek Free Library |
57 |
150 |
Addition, renovate 2nd floor |
$300,000.00 |
Darwin R. Barker Library |
57 |
150 |
Addition of 2nd floor mezzanine, main floor remodeling |
$1,500,000.00 |
Dunkirk Free Library |
57 |
149 |
Addition including computer lab, café and teen center |
$1,000,000.00 |
Falconer Public Library |
57 |
150 |
Renovations to make all areas of the library accessible to patrons in wheelchairs, upgrades to heating, additional space to house new technology, HVAC and lighting replacement |
$100,000.00 |
Farman Free Library |
57 |
149 |
Additional meeting space, additional space to house the collection, new children's area, elevator, renovate 2nd floor |
$275,000.00 |
Fluvanna Free Library |
57 |
150 |
Addition |
$300,000.00 |
Gowanda Free Library |
57 |
149 |
Addition with handicapped accessibility, extend the parking lot |
$1,000,000.00 |
Hazeltine Public Library |
57 |
150 |
Window replacements, addition |
$500,000.00 |
James Prendergast |
57 |
150 |
Addition, new windows and doors, automated front door, wheelchair accessible restroom, new roof |
$3,625,000.00 |
Kennedy Free Library |
57 |
149 |
New facility |
$2,500,000.00 |
Mary E. Seymour |
57 |
150 |
Elevator |
$75,000.00 |
Mayville Library |
57 |
150 |
New roof, interior remodeling, new parking lot |
$100,000.00 |
Minerva Free Library |
57 |
150 |
Addition with elevator |
$1,000,000.00 |
Myers Memorial Library |
57 |
149 |
New windows, interior renovations |
$70,000.00 |
Patterson Library |
57 |
150 |
Air conditioning system for archival rooms, install moisture barrier to address ground water problem in lower level |
$850,000.00 |
Ripley Free Library |
57 |
150 |
Interior remodeling, meeting room addition |
$300,000.00 |
Sinclairville Free Library |
57 |
149 |
Storage area |
$10,000.00 |
Smith Memorial Library |
57 |
150 |
New boiler heating system, renovate listening room |
$60,000.00 |
System |
Library Name |
County |
Sen. Dist. |
Asy. Dist. |
Project Description |
Amount |
System Total |
Clinton-Essex-Franklin Library System |
$3,536,500.00
|
|
CEF Headquarters |
Clinton |
45 |
114 |
Repair cement steps; install safety railing in garage; reconstruct collapsing driveway |
$25,000.00 |
Chazy Public Library |
45 |
114 |
Handicapped Accessible ramp and associated groundwork |
$12,500.00 |
Dodge Memorial Library |
45 |
114 |
Replacement of slate roof on historic building; insulate and weatherize attic for increased energy efficiency. Outside staircase to access the second floor of the building, new basement staircase, new fuel tank (work that can be accomplished to be determined by match requirements, otherwise cannot afford/will not do work) |
$100,000.00 |
Ellenburg Sarah A. Munsil Library |
45 |
114 |
Separate meeting room for library program, young adult area, renovations to make second floor and basement wheelchair accessible (work that can be accomplished to be determined by match requirements, otherwise cannot afford/will not do work) |
$10,000.00 |
Mooers Free Library |
45 |
114 |
Replace windows with energy efficient version; handicapped access ramp to meet ADA requirements; furnace replacement |
$25,000.00 |
Plattsburgh Public Library |
45 |
114 |
Current project underway; would like to add solar panels to roof if no match is required. Otherwise, cannot afford/will not do work |
$376,000.00 |
Elizabethtown Library Association |
Essex |
45 |
113 |
Replacement and reframing of door and replacemnt of building's historically significant windows (historic building); work that can be accomplished to be determined by match requirements; otherwise cannot afford/will not do work) |
$12,000.00 |
Hammond Library of Crown Point |
45 |
113 |
basement renovations - sealing cement block, replace existing lighting, install 3,00 sq. ft. floor; exterior ramp to comply with ADA; install ADA compliant bathroom; replace hot water heater; roof replacement, replace windows with energy efficient version (work that can be accomplished to be determined by match requirements otherwise cannot afford/will not do work) |
$75,000.00 |
Keeseville Free Library |
45 |
114 |
Install new energy efficient windows throughout the building; furnace replacement (cost is estimated) |
$30,000.00 |
Paine Memorial Library |
45 |
113 |
New windows, commercial air conditioning system, New lighting, wheelchair accessible restroom |
$35,000.00 |
Schroon Lake Public Library |
45 |
113 |
New Library Building |
$1,500,000 |
Sherman Free Library |
45 |
113 |
Wheelchair ramp; handicapped accessible restroom/related ADA improvements |
$20,000.00 |
Wadhams Free Library |
45 |
113 |
Parking improvements |
$10,000.00 |
Westport Library Association |
45 |
113 |
foundation work, porch repairs, ADA access (historic building) |
$35,000.00 |
Goff-Nelson Memorial Library |
Franklin |
45 |
114 |
Boiler Replacement; Replace Fuel Oil Storage Tank; Chimney and Masonery Restoration; Water Seepage (2 walls); Replace Lights; Roof replacement; Windows replaced with energy efficient version; replace entryway slab; ADA compliant ramp; Repair eaves causing water damage, and gutters; ADA compliant doors |
$271,000.00 |
Wead Library of Malone |
45 |
114 |
Intallation of elevator would require expansion per architect estimated cost of $1 million |
$1,000,000 |
System |
Library Name |
County |
Sen. Dist. |
Asy. Dist. |
Project Description |
Amount |
System Total |
Finger Lakes Library System |
$11,054,500.00
|
|
Aurora Free Library |
Cayuga |
54 |
123 |
ADA compliant restroom; window replacements; exterior lighting; basement renovations for additional office space and storage; elevator. |
$418,000.00 |
Hazard Library Association |
54 |
123 |
For an addition to increase library space. |
$175,000.00 |
Springport Free Library |
54 |
123 |
Install energy efficient lighting, sound proof ceiling, replacement of broken wooden stairs and install fire doors. |
$8,000.00 |
Stewart B. Lang Memorial Library |
49 |
128 |
Library addition with either solar or geothermal leating. |
$300,000.00 |
Weedsport Free Library |
49 |
128 |
Install insulation in the attic area; redo front entranceway with replacement of wooden exterior door with metal one to eliminate severe weather issues; renovate parking lot. |
$29,000.00 |
Cortland Free Library |
Cortland |
51 |
125 |
Restore exterior library building. Install elevator and restore main steps and remove existing ramp. Replace existing entry doors with energy efficient ones. Construct concrete combination sidewalk and sheelstop curb, repave parking area to slope away from building. Modify guardrails, handrails to comply with current codes. Upgrade fire separations with "c" label fire doors; replace cracked glass floor panels in stacks area, make bathrooms ADA compliant, air condition building, install fire detection and alarm system, install battery backup emergency lighting in building and replace security system. |
$2,000,000.00 |
Peck Memorial Library |
51 |
123 |
Replace and/or restore mortar, foundation,windows, add insulation, heating and air unit, community room, electrical and plumbing… |
$1,500,000.00 |
Lodi Whittier Library |
Seneca |
54 |
129 |
New construction of a 4,000 square foot building. Current library space is 700 sq. ft. |
$800,000.00 |
Waterloo Library and Historical Society |
54 |
129 |
ADA bathrooms; heating, plumbing and electrical replacements for energy savings. |
$600,000.00 |
Apalachin Library |
Tioga |
52 |
123 |
Renovate second floor for library office and storage. |
$100,000.00 |
Tappan-Spaulding Memorial Library |
52 |
123 |
Renovate the children's space. |
$9,500.00 |
Finger Lakes Library System |
Tompkins |
53 |
125 |
Renovate an existing building for System Headquarters. Current lease expires 2010. |
$2,000,000.00 |
Groton Public Library |
51 |
125 |
Update air conditioning |
$15,000.00 |
Newfield Public Library |
53 |
125 |
Build an addition to library. |
$200,000.00 |
The Southworth Library Association |
51 |
125 |
Sorthworth Library is in the beginning stages of requesting RFQs for their large addition. At this time, the amount is just a guestimate. |
$1,500,000.00 |
Tompkins County Public Library |
53 |
125 |
Renovate existing leased space (FLLS) to accommodate growing needs of library. |
$1,400,000.00 |
System |
Library Name |
County |
Sen. Dist. |
Asy. Dist. |
Project Description |
Amount |
System Total |
Four County Library System |
$25,442,500.00
|
|
Broome County Public Library |
Broome |
52 |
126 |
replace 18 public access computers; install new flooring in browsing area; replace 12 microfilm machines |
$90,000.00 |
Deposit Free Library |
52 |
107 |
replace roof; construct storage shed |
$35,000.00 |
George F. Johnson Memorial Library |
52 |
126 |
install automatic front door; upstairs meeting room air conditioning and carpeting; remodel 4 bathrooms (one w/disabled access); remodel basement meeting room; add outdoor events sign; replace rooftop HVAC units |
$239,000.00 |
Lisle Free Library |
52 |
123 |
parking lot and driveway; add solar panels; insulate cellar; expansion project; reconfigure space |
$183,000.00 |
Mary-Wilcox Memorial Library |
52 |
123 |
asbestos abatement; construction to fix load-capacity deficiencies; 2nd floor renovation to create meeting room and display area for local history collection; remodel meeting room, renovate bathroom for ADA compliance; add shelf space for juvenile/YA rooms |
$119,000.00 |
Nineveh Public Library |
52 |
107 |
addition; siding; roof; disabled access ramp |
$100,000.00 |
Your Home Public Library |
52 |
126 |
replace / repair concrete walkway and curbs; clean, repoint and seal exterior brickwork; strip, prime and repaint wood trim; repair, restore and glaze windows; install elevator; install central air conditioning; repair and restore front porch |
$692,000.00 |
Guernsey Memorial Library |
Chenango |
52 |
107 |
new elevator; new carpeting; renovate bathrooms; new children's wing; computer room and new offices |
$4,300,000.00 |
Moore Memorial Library |
52 |
107 |
expand meeting room; expand office space; expand area for adult books and media; expand circulation desk area; expand museum space (with Historical Society); also a 17,460 sq.ft. addition |
$5,500,000.00 |
New Berlin Library |
52 |
107 |
window replacement |
$8,500.00 |
Oxford Memorial Library |
52 |
107 |
addition for community room (w/disabled access); new rear entryway; various energy efficiency upgrades; reinforced framing, improved access; upgrade heating system; upgrade plumbing system, upgrade electrical system; add alarms and security systems; wireless Internet access; improved roof-water control system; replace parking lot and related work; landscaping; new sidewaks and paving; sprinkler system for entire building; hazardous materials identification / abatement |
$813,000.00 |
Sherburne Public Library |
49 |
123 |
major work on terra cotta tile roof |
$200,000.00 |
South New Berlin Free Library |
52 |
107 |
windows, HVAC, entryway/façade, lighting, bathroom |
$18,000.00 |
Bovina Public Library |
Delaware |
42 |
107 |
repair front steps; build ramp |
$10,000.00 |
Fairview Public Library |
42 |
107 |
replace vinyl siding, painting |
$20,000.00 |
Franklin Free Library |
42 |
127 |
roof, disabled access, painting |
$15,000.00 |
Louis Adelia Read Memorial Library |
42 |
107 |
expansion project |
$1,000,000.00 |
Cherry Valley Memorial Library |
Otsego |
51 |
117 |
replace disabled access ramp and walkway; replace interior lighting fixtures; replace storm windows, add disabled access bathroom |
$75,000.00 |
Gilbertsville Free Library |
51 |
127 |
addition; painting; electrical work |
$75,000.00 |
Harris Memorial Library |
51 |
127 |
new roof; renovation to siding and shutters; addition for public computers / technology room |
$70,000.00 |
Huntington Memorial Library |
51 |
111 |
new library building |
$10,000,000.00 |
Kinney Memorial Library |
51 |
111 |
addition |
$1,000,000.00 |
Milford Free Library |
51 |
111 |
expansion project |
$100,000.00 |
Village Library of Cooperstown |
51 |
111 |
new lighting / fixtures |
$30,000.00 |
Village Library of Morris |
51 |
127 |
major addition |
$750,000.00 |
System |
Library Name |
County |
Sen. Dist. |
Asy. Dist. |
Project Description |
Amount |
System Total |
Mid-Hudson Library System |
$76,175,041.00
|
|
Claverack Free Library |
Columbia |
41 |
103 |
Significant expansion; handicapped accessible |
$1,000,000.00 |
Hudson Area Association Library |
41 |
103 |
Extensive renovation of their historic building |
$8,000,000.00 |
Kinderhook Memorial Library |
41 |
108 |
Significant Expansion Project |
$3,050,000.00 |
New Lebanon Library |
41 |
108 |
Expansion Project |
$80,000.00 |
Philmont Public Library |
41 |
99 |
Expansion Project |
$150,000.00 |
Roeliff Jansen Community Library (Hillsdale) |
41 |
103 |
New "green" building |
$2,000,000.00 |
Valatie Free Library |
41 |
108 |
Significant Renovation of new building |
$190,000.00 |
Amenia Free Library |
Dutchess |
40 |
103 |
Significant Expansion |
$1,000,000.00 |
Beekman Library |
40 |
103 |
Significant Expansion |
$275,000.00 |
Greater Poughkeepsie Library District |
41 |
100 |
Relocation/Expansion |
$10,200,000.00 |
Howland Public Library (Beacon) |
41 |
100 |
Significant Expansion |
$10,000,000.00 |
Hyde Park Free Library |
41 |
102 |
Energy Efficiency & Handicapped Accessibility Projects |
$80,000.00 |
Mid-Hudson Library System |
41 |
100 |
Energy Efficiency Project (incl. solar panels) |
$500,000.00 |
Millbrook Free Library |
41 |
103 |
Energy Efficiency Project |
$6,000.00 |
Morton Memorial Library (Rhinecliff) |
41 |
101 |
Renovation |
$15,000.00 |
NorthEast-Millerton Library |
40 |
103 |
Purchase of Additional Building |
$250,000.00 |
Pine Plains Library |
40 |
103 |
Expansion Project |
$280,000.00 |
Pleasant Valley Free Library |
41 |
103 |
Significant Expansion Project |
$370,000.00 |
Red Hook Public Library |
41 |
103 |
Renovation/Energy Efficiency |
$380,000.00 |
Staatsburg Library |
41 |
102 |
Significant Expansion Project |
$300,000.00 |
Stanford Free Library |
41 |
103 |
New Building |
$2,000,000.00 |
Cairo Public Library |
Greene |
51 |
127 |
New building |
$2,000,000.00 |
Catskill Public Library |
51 |
127 |
Renovation; handicapped accessible |
$29,000.00 |
D.R. Evarts Library (Athens) |
51 |
127 |
Renovation |
$44,500.00 |
Haines Falls Free Library |
51 |
127 |
Extensive renovation of building |
$2,500,000.00 |
Heermance Memorial Library |
51 |
108 |
Energy Efficiency Project |
$15,000.00 |
Alice Curtis Desmond & Hamilton Fish Library |
Putnam |
40 |
90 |
Energy Efficiency Project (incl. geothermal and solar panels) |
$165,000.00 |
Kent Public Library |
40 |
90 |
Energy |
$80,000.00 |
Patterson Library |
40 |
99 |
Expansion Project |
$3,596,875.00 |
Putnam Valley Library |
40 |
90 |
Renovation/Energy Efficiency |
$100,000.00 |
Highland Public Library |
Ulster (see also Ramapo Catskill) |
30 |
100 |
New building |
$6,420,000.00 |
Kingston Library |
39 |
101 |
Renovation |
$92,000.00 |
Marlboro Free Library |
39 |
100 |
Significant Expansion Project |
$4,400,000.00 |
Morton Memorial Library (Pine Hill) |
42 |
101 |
Renovation |
$28,000.00 |
Phoenicia Library |
42 |
101 |
Significant Expansion Project |
$900,000.00 |
Plattekill Library |
39 |
103 |
New building |
$4,010,000.00 |
Rosendale Library |
42 |
101 |
Significant Expansion Project |
$2,010,000.00 |
Saugerties Public Library |
42 |
127 |
Significant Expansion Project (includes historic building) |
$958,666.00 |
Stone Ridge Library |
42 |
101 |
Significant Expansion Project (includes historic building) |
$3,500,000.00 |
Town of Esopus Library |
39 |
101 |
Energy Efficiency Project: solar panels |
$200,000.00 |
Woodstock Public Library District |
42 |
101 |
Significant Expansion Project |
$5,000,000.00 |
System |
Library Name |
County |
Sen. Dist. |
Asy. Dist. |
Project Description |
Amount |
System Total |
Mid-York Library System |
$19,445,199.00
|
|
Frankfort Free Library |
Herkimer |
51 |
117 |
Wheelchair lift, custom shelving under the windows in children's area, new carpeting throughout upstairs, replace wallpaper where leaks have occurred, paint a portion of the downstairs, repair wallboard and replace carpeting in the downstairs area (water damage), chimney inspected, and water fountain replaced |
$100,000 |
Ilion Free Public Library |
51 |
117 |
New roof, basement remodeling, convert staff space to public space, purchase property next door for expansion, foundation work, new electrical, and new meeting room, re-point bricks, chimney repair, install energy efficient windows in addition, waterproof basement |
$664,200 |
Jordanville Public Library |
51 |
117 |
New roof, restoration of four columns that support the overhanging roof at the front of the library |
$50,000 |
Middleville Free Library |
51 |
117 |
Wheelchair accessible electronic door, new shelving to better utilize space used for library collections |
|
Weller Library |
51 |
117 |
Re-plaster Children's Room,restoration of bas relief floral ceiling plaster in Reading Room, masonary repair on vault, energy efficient replace windows, energy efficient HVAC |
$120,000 |
Canastota Public Library |
Madison |
49 |
111 |
Paint fire escape, remodel staff work room, brick repointing, parking lot resurfacing, remodel public and staff restrooms, lighting upgrades, remodel local history room, replace front doors |
$80,000 |
Cazenovia Public Library |
49 |
111 |
Painting current building, addition |
$1,100,000 |
DeRuyter Free Library |
49 |
111 |
Install 'green' HVAC, install energy efficient windows, new flooring, new wiring, new public and staff restrooms, reconfiguring newly created library space |
$2,000,000 |
Hamilton Public library |
49 |
111 |
Removal of lead based paint |
$130,000 |
Morrisville Public Library |
49 |
111 |
Upgrades to electrical wiring, new computer equipment, Elevator, new roof, renovations to make all areas accessible to patrons in wheelchairs, upgrades to HVAC system, 30,000 square feet of additional space |
$1,400,000 |
New Woodstock Free Library |
49 |
111 |
20 year project to replace roofs, boilers, repaint interior and exterior, replace carpets, tile and wood floors, repair and replace front entrance and foundation, replace and construct adequate parking space, replace basement windows, install additional insulation, reline the chimney, and refinish wood floors |
$400,000 |
Oneida Public Library |
49 |
111 |
New Building, Security system |
$3,020,000 |
Sullivan Free Library-Bridgeport |
|
49 |
111 |
Addition |
$250,000 |
Sullivan Free Library-Chittenango |
|
49 |
111 |
Replace 4 HVAC units which are beyond serviceable life |
$75,000 |
C.W. Clark Memorial Library |
Oneida |
49 |
111 |
Addition, parking improvements, convert basement into usable space, construction of a 1,100 square foot 2 story addition to existing library; purchase of new shelving |
$403,008 |
Dunham Public Library |
47 |
116 |
Automatic doors, upgrade HVAC system |
$9,000 |
Jervis Public Library |
47 |
116 |
Chimney repair, drive through window, addition, install energy efficient windows in historic part of building, install secure and energy efficient staff entrance, cupola restoration, install photovoltaic electric generator, install energy efficient lighting, install 2 variable pumps on boiler, roofline and roof vent insulation |
$747,840 |
Mid-York Library System Headquarters |
47 |
116 |
Ongoing initiative to make facility "green" over the next 10 years |
$3,000,000 |
Oriskany Public Library |
47 |
116 |
New roof, canopy for front entrance |
$48,000 |
Utica Public Library |
47 |
111 |
New Children's room; new elevator, building repairs including: clean & repoint the exterior of the building, resurfacing the parking lot, gutter and roofing work. |
$5,503,151 |
Waterville Public Library |
49 |
111 |
Photovoltaic electricity generation equipment retrofit, 35 kw, combination rooftop and post mounted with system controls |
$315,000 |
Western Town Library |
47 |
115 |
Replace HVAC, insulate building, and weatherize windows |
$30,000 |
System |
Library Name |
County |
Sen. Dist. |
Asy. Dist. |
Project Description |
Amount |
System Total |
Monroe County Library System |
$63,313,000.00
|
|
Brighton Memorial Library |
Monroe |
56 |
132 |
Additional space for a separate story hour room, additional meeting/program space, expanded teen area, additional space for Internet use, additional staff space |
$2,000,000 |
Chili Public Library |
62 |
133 |
8,000 sq. ft. addition |
$3,400,000 |
Fairport Public Library |
55 |
135 |
New facility |
$12,000,000 |
Gates Public Library |
62 |
133 |
Addition, new lighting, additional parking, upgrades to HVAC system |
$6,600,000 |
Greece Public Library |
56 |
134 |
Addition to the Children's Room |
$500,000 |
Irondequoit Public Library-Evan Branch |
55 |
132 |
New consolidated facility |
$12,000,000 |
Ogden Farmers' Library |
62 |
134 |
Interior updates; addition |
$2,200,000 |
Parma Public Library |
56 |
139 |
New 22,000 sq ft facility. |
$6,000,000 |
Rochester Public Library |
56 |
133 |
Foundation repair ($8 million), Urban Park ($3 million) Exterior Lighting ($250,000) |
$11,250,000 |
Rochester Public Library - Charlotte Branch |
56 |
132 |
Roof and exterior repair |
$110,000 |
Rochester Public Library - Highland Branch |
56 |
131 |
Addition |
$400,000 |
Rochester Public Library - Lincoln Branch |
56 |
133 |
Interior updates |
$25,000 |
Rochester Public Library - Lyell Branch |
62 |
131 |
Signage and exterior repair |
$25,000 |
Rochester Public Library - Maplewood Branch |
55 |
132 |
Replacement Windows and exterior repair |
$178,000 |
Rochester Public Library - Monroe Branch |
56 |
131 |
Interior updates |
$25,000 |
Rochester Public Library - Phyllis Wheatley Branch |
56 |
133 |
Teen Center ($100,000) parapet repair ($35,000) IN PROGRESS |
$135,000 |
Rochester Public Library - Winton Branch |
55 |
132 |
Expanded parking area |
$300,000 |
Scottsville Free Library |
55 |
131 |
Restoration/renovation of children's area, repairs to foundation and wood support |
$40,000 |
Seymour Library |
62 |
134 |
Roof replacement |
$125,000 |
|
Town of Mendon Public Library |
55 |
130 |
New facility (current facility's restroom, meeting room, and part of collection is not wheelchair accessible) IN PROGRESS |
$6,000,000 |
|
System |
Library Name |
County |
Sen. Dist. |
Asy. Dist. |
Project Description |
Amount |
System Total |
Nassau Library System |
$104,773,100.00
|
|
Baldwin Public Library |
Nassau |
9 |
14 |
Sidewalk and railings rehabilitation ($20,000); Expanded and enhanced YA room ($300,000) |
$320,000 |
Bayville Free Library |
5 |
113 |
1,750 sq ft addition and extensive renovations to the 2nd floor of the existing library |
$698,000 |
Bellmore Memorial Library |
8 |
19 |
Replace roof ($250,000); Replace carpeting ($75,000); New energy-effiecient HVAC ($250,000); Repair windows and walls ($75,000); Replace wallpaper ($25,000); Paint interior ($15,000); New shelving ($25,000) |
$715,000 |
Bethpage Public Library |
5 |
15 |
New roof ($300,000); Solar panels ($300,000); New carpeting in auditorium($150,000); Replace brick in exterior garden ($50,000) |
$800,000 |
Bryant Public Library |
5 |
15 |
Upgrade or install a new HVAC system; Replace telephone system; Convert small room into office space; Implement RFID |
$1,000,000 |
East Meadow Public Library |
6 |
15 |
Replace front and delivery doors ($82,000); Add energy management system to lower energy costs ($100,000); Upgrade security system ($130,000); Resurface parking and improve drainage ($40,000); Replace 1 air conditioner ($50,000); Renovate circulation desk ($30,000); New signage throughout ($25,000); Replace tile floor & carpeting ($34,000); Replace windows ($48,000); Replace wallpaper ($50,000); Add programming space ($2,000,000) |
$2,589,000 |
East Rockaway Public Library |
9 |
20 |
Replace all library carpeting ($88,000); Replace the Main Street facade including windows ($180,000); Upgrade circulation desk ($45,000) |
$313,000 |
East Williston Public Library |
7 |
17 |
500 square foot addition; new elevator; ADA compliant restrooms; updating of electrical and heating systems; install central air conditioning; improve lighting; replace windows; renovate the circulation desk; replace carpeting. |
$745,000 |
Farmingdale Public Library |
6 |
12 |
Renovation of five bathrooms to make fully ADA-compliant. Creation of a family bathroom for parents with children and/or seniors with aides. Renovation of interior building spaces to create a teen area, reading room, computer area, AV listening/collection area, and expansion of children's library to accommodate growing collections and additional computers. Update lower level meeting rooms with energy-efficient lighting and dimming controls. |
$1,500,000 |
Floral Park Public Library |
7 |
21 |
Renovations to make all areas of the library accessible to those in wheelchairs (including entrance and restrooms), new windows, new doors, additional shelving and additional space for public access computers, plus parking improvements. |
$2,000,000 |
Franklin Square Public Library |
7 |
21 |
Electronic entrance doors and new roof overhang over the entrance |
$35,000 |
Freeport Memorial Library |
8 |
19 |
EAST BLDG: new roof ($250,000); new ceiling and lighting ($287,000); replace sink and cabinet in Room #4 ($2,400); replace meeting room doors & accordian divider ($41,000); replace floor outside of Technical Svs ($17,100); renovate storage room & add compact shelving ($226,500); renovate Room #6 ($100,000). WEST BLDG: new boiler ($300,000); reconfigure main floor and create a Teen Center ($496,000); replace steel exit door ($2,200); new carpet ($137,000); add a bathroom on lower level ($47,200). BOTH BLDGS: Exterior restoration & painting ($175,000); Interior painting ($118,000); Renovate 9 bathrooms and make fully ADA-compliant ($376,400) |
$2,575,800 |
Garden City Public Library |
7 |
17 |
Generator and new HVAC chillers |
$819,800 |
Gold Coast Public Library |
5 |
15 |
Although the Library Board has just begun a long-range planning process, there is general agreement about the need to provide additional space for the growth of the collection, as well the provision of meeting room space for community groups and library programs. This could mean expanding the present facility, building a new facility, or leasing and outfitting a second facility. Cost estimates vary depending on the option selected.
|
$5,000,000 |
Great Neck Library |
7 |
16 |
Expansion and renovation including a new roof and new HVAC |
$15,000,000 |
Hempstead Public Library |
6 |
18 |
Expansion and major renovation of existing library |
$15,000,000 |
Hewlett-Woodmere Public Library |
9 |
14 |
Replace approx. 27,000 sq ft of roof ($275,000); energy-efficient lighting ($50,000); HVAC upgrade ($75,000); New carpeting ($115,000) |
$515,000 |
Hicksville Public Library |
9 |
20 |
Considering a major renovation |
$4,500,000 |
Hillside Public Library |
5 |
15 |
Renovate parking lot |
$145,500 |
Island Park Public Library |
7 |
17 |
Solar panels |
$75,000 |
Island Trees Public Library |
9 |
20 |
Upgrade electrical panel ($3,000); Replace drain pipe ($5,000) |
$8,000 |
Jericho Public Library |
6 |
19 |
Renovate the existing first and second floors and construct additions to both floors. The renovated and expanded first floor will allow for an additional meeting room, a children's program room, a café, a redesigned circulation desk, more storage space and require the re-location of Technical Services. The renovated and expanded second floor will allow a new AV area, a new book area with seating, a redesigned Reference Area, a new YA area and additional staff work area. |
$6,000,000 |
Lakeview Public Library |
5 |
13 |
Security (Video Surveilance) System and Materials Protection System. Demolition and re-configuration of the 5,000 sq ft on the second floor and the 13,000 sq ft third floor which are not currently usable. |
$1,050,000 |
Levittown Public Library |
6 |
18 |
Renovate Adult Services area; add a rest room, replace lighting and ceiling ($1.4 million); asbestos abatement ($55,000); new air handler ($75,000); replace 32,000 sq. ft. roof ($325,000) |
$1,855,000 |
Locust Valley Library |
6 |
19 |
2,400 sq ft addition; create additional 34 parking spaces. |
$2,100,000 |
Long Beach Public Library |
5 |
15 |
Re-carpet entire library ($625,000). Acquire property and construct additional space for a teen area with programming space, an expanded children's area, additional meeting room space, separate group work space and individual quiet use space, more computers and additional shelving ($9.5 million). |
$10,125,000 |
Lynbrook Public Library |
9 |
20 |
Roof replacement; HVAC replacement and upgrade; Energy-efficient lighting; Rehabilitation of the parking lot |
$600,000 |
Malverne Public Library |
9 |
14 |
Upgrade HVAC and wireless sound system |
$50,000 |
Massapequa Public Library |
9 |
14 |
Add new entrance to building from parking lot. |
$150,000 |
Merrick Library |
6 |
12 |
Split up one of the existing group study rooms into two smaller rooms, each accommodating 2 people at a time ($10,000); Energy-efficient, 'green' lighting in the Children's Room ($10,000) |
$20,000 |
Nassau Library System |
8 |
17 |
Repair/repoint an exterior wall ($22,500); New front entrance with automatic doors ($25,000); Renovate and make fully ADA-compliant 3 restrooms ($75,000); Renovate a 4th bathroom ($20,000); Interior renovations to create a self-contained meeting room / training center 'wing' with public access when the rest of the building is closed ($800,000) |
$942,500 |
North Bellmore Public Library |
6 |
18 |
Renovate two public restrooms ($30,000); Renovate and make ADA-compliant a staff restroom ($12,000); New carpeting ($30,000); Replace part of roof ($25,000) |
$97,000 |
North Merrick Public Library |
8 |
19 |
New HVAC system; new lighting; new windows; new roof; renovations to make restrooms accessible by the disabled; upgrades to plumbing; new electrical wiring; new circ desk; new carpeting; 2,500 sq ft addition; new phone system; new materials theft prevention system. |
$5,500,000 |
Oceanside Library |
8 |
17 |
Reconfiguration of downstairs storage area into usable space for the public including 2 meeting rooms ($750,000); Additional lighting & HVAC ductwork ($300,000); New carpet tiles to cover poured concrete floor ($50,000) |
$1,100,000 |
Peninsula Public Library |
9 |
20 |
Replace HVAC system and concrete walkways around library |
$370,000 |
Plainedge Public Library |
9 |
20 |
New roof ($423,500); Solar panels ($308,000); Video surveillance system for lower level ($10,000) |
$741,500 |
Plainview-Old Bethpage Public Library |
6 |
12 |
Interior surveillance system ($10,000); Lighting upgrade ($10,000); New loading dock ($35,000) |
$55,000 |
Port Washington Public Library |
6 |
13 |
Two new elevations ($180,000); New roof ($600,000); Replace carpeting ($100,000); Interior renovations & re-purposing of renovated space ($80,000); Additional exhaust shaft for better ventilation ($8,000); Solar panels ($42,500) |
$1,010,500 |
Rockville Centre Public Library |
7 |
16 |
Upgrade lighting and ceiling replacement ($525,000); Window replacement ($134,000); Expand rear entry (no cost estimate) |
$659,000 |
Roosevelt Public Library |
9 |
14 |
A 20,000 sq ft addition and renovation of existing 9,800 sq ft building |
$8,400,000 |
Sea Cliff Village Library |
8 |
18 |
Repace stained glass windows $15,000); Renovate Children's Library including ceiling, new HVAC, windows, lighting and carpeting ($300,000) |
$315,000 |
Seaford Public Library |
5 |
13 |
HVAC upgrade ($90,000); Renovate restrooms ($40,000); Video surveillance system for outside the building (no cost estimate); New carpeting (no cost estimate) |
$130,000 |
Shelter Rock Public Library |
8 |
19 |
A 1,000 sq. ft. addition and a major renovation of library including: making all areas more accessible, usable and comforatable; new and larger restrooms; improved lighting, improved wiring for technology; more comfortable seating; a re-designed and enhanced meeting/multi-purpose room; improved public service desks, a new loading dock; a new HVAC system; and improved staff work areas. |
$7,460,000 |
Uniondale Public Library |
7 |
16 |
Renovation of 4 restrooms |
$64,000 |
Valley Stream Public Library |
6 |
17 |
Enclose exterior patio to create a quiet study area of approximately 3,000 square feet ($400,000); Redo the main and children's room entrances ($100,000); Replace HVAC (no cost estimate); Interior renovations for new projections system for programs ($10,000) |
$510,000 |
Wantagh Public Library |
8 |
19 |
Renovate bathrooms; New roof |
$800,000 |
West Hempstead Public Library |
6 |
18 |
Additional lighting ($19,500); Install HVAC and additional lighting in basement ($60,000). The basement (currently used for storage) was left unfinished with no climate control when new library was constructed in 2007. |
$79,500 |
Westbury Public Library |
7 |
15 |
New roof and solar panels |
$235,000 |
System |
Library Name |
County |
Sen. Dist. |
Asy. Dist. |
Project Description |
Amount |
System Total |
New York Public Library |
$432,031,320.00
|
|
Allerton Branch |
Bronx |
34 |
80 |
Partial renovation |
$5,146,200.00 |
Belmont Branch |
34 |
78 |
Partial Renovation |
$7,268,588.00 |
Bronx - various |
Various |
Various |
Borough Wide- Security Systems |
$2,050,000.00 |
City Island Branch |
34 |
82 |
HVAC and fence replacement |
$700,000.00 |
Clason's Point Branch |
32 |
85 |
Stabilize back wall façade and related interior work |
$450,000.00 |
Eastchester Branch |
34 |
83 |
Full interior renovation |
$4,489,938.00 |
Edenwald Branch |
36 |
83 |
Partial renovation |
$2,906,243.00 |
Francis Martin Branch |
28 |
86 |
Partial renovation |
$3,774,150.00 |
Grand Concourse Branch |
33 |
86 |
Partial renovation |
$7,593,750.00 |
High Bridge Branch |
28 |
77 |
Furniture and Equipment |
$250,000.00 |
Hunt's Point Branch |
32 |
85 |
Full interior renovation |
$7,738,290.00 |
Kingsbridge Branch |
31 |
81 |
Library Materials |
$500,000.00 |
Melrose Branch |
36 |
79 |
Full interior and exterior renovation |
$4,707,000.00 |
Mosholu Branch |
33 |
80 |
Partial window replacement (staff room), ejector pump, new roof |
$825,000.00 |
Mott Haven Branch |
28 |
84 |
Security System |
$150,000.00 |
Parkchester Branch |
32 |
76 |
Replace Automated Interior and Exterior Doors (ADA Compliance) |
$300,000.00 |
Pelham Bay Branch |
34 |
82 |
Full interior renovation |
$4,260,000.00 |
Riverdale Branch |
34 |
81 |
Partial renovation |
$3,375,000.00 |
Soundview Branch |
32 |
85 |
Partial renovation |
$3,731,049.00 |
Soundview Branch |
32 |
85 |
Existing Project - Supplemental Budget Request |
$150,000.00 |
Spuyten Duyvil Branch |
31 |
81 |
Full interior renovation |
$4,326,210.00 |
Spuyten Duyvil Branch |
31 |
81 |
Branch expansion |
$4,875,000.00 |
Throg's Neck Branch |
34 |
82 |
Full interior renovation |
$5,045,328.00 |
Tremont Branch |
33 |
79 |
New Boiler, Roof, and Security System |
$1,085,000.00 |
Van Cortlandt Branch |
33 |
80 |
Acquisition |
$1,000,000.00 |
Van Cortlandt Branch |
33 |
80 |
Partial interior renovation |
$1,022,198.00 |
Van Nest Branch |
32 |
80 |
Full interior renovation |
$4,844,700.00 |
Wakefield Branch |
36 |
83 |
Full interior renovation |
$6,697,040.00 |
West Farms Branch |
33 |
76 |
Partial renovation |
$6,010,331.00 |
Westchester Square Branch |
34 |
82 |
Full interior and exterior renovation |
$9,378,720.00 |
125th Street |
New York |
30 |
68 |
Full interior and exterior renovation |
$8,255,657.00 |
58th Street |
26 |
73 |
Partial renovation |
$2,170,800.00 |
67th Street |
26 |
65 |
Systems replacement, masonry restoration |
$1,445,000.00 |
96th Street |
28 |
68 |
Full interior and exterior renovation |
$8,169,000.00 |
Aguilar Branch |
48 |
122 |
Partial renovation |
$2,283,402.00 |
Andrew Heiskell Braille & Talking Book Library |
26 |
75 |
New boiler and controls |
$1,600,000.00 |
Bloomingdale Branch |
30 |
69 |
Partial renovation |
$8,315,448.00 |
Chatham Square Branch |
25 |
64 |
Exterior Restoration, HVAC Replacement, ADA Compliance and Security System |
$2,175,000.00 |
Countee Cullen Branch |
30 |
70 |
Partial renovation |
$7,605,000.00 |
Epiphany Branch |
26 |
74 |
Full interior and exterior renovation |
$7,586,400.00 |
Fort Washington Branch |
31 |
72 |
Full interior and exterior renovation |
$8,326,800.00 |
George Bruce Branch |
30 |
69 |
Exterior rehabilitation, security, roof, boiler and Security System |
$2,175,000.00 |
Hamilton Fish Park Branch |
25 |
64 |
Partial renovation, Systems Upgrade and Install Security System |
$4,745,160.00 |
Hamilton Grange Branch |
30 |
70 |
Partial renovation |
$3,933,978.00 |
Hudson Park Branch |
29 |
66 |
Full interior and exterior renovation |
$7,546,959.00 |
Inwood Branch |
31 |
72 |
HVAC Replacement, Elevator Upgrade and Security System |
$2,425,000.00 |
Jefferson Market Branch |
29 |
66 |
Replace MEP systems and interior renovation |
$13,980,000.00 |
Kips Bay Branch |
26 |
75 |
Full interior and exterior renovation |
$5,189,760.00 |
Library Services Center |
12 |
37 |
Required Appropriation |
$5,000,000.00 |
Macomb's Bridge Branch |
30 |
71 |
Acquire Site and New Branch Construction |
$10,000,000.00 |
Manhattan - various |
Various |
Various |
Technology infrastructure upgrade |
$2,880,000.00 |
Manhattan- various |
Various |
Various |
Borough Wide- Security Systems |
$2,225,000.00 |
Manhattan- various |
Various |
Various |
Existing Project- Supplemental Budget Request |
$800,000.00 |
Mid-Manhattan Library |
26 |
75 |
Interior and Exterior Renovation |
$47,962,800.00 |
Muhlenberg Branch |
29 |
75 |
Partial renovation |
$3,283,586.00 |
New Amsterdam Branch |
25 |
66 |
Partial renovation |
$4,599,000.00 |
New York Public Library for the Performing Arts |
29 |
67 |
Replace building systems |
$765,000.00 |
New York Public Library for the Performing Arts |
29 |
67 |
Safety and security |
$2,900,000.00 |
New York Public Library for the Performing Arts |
29 |
67 |
Exterior rehabilitation, masonry and water proofing |
$2,600,000.00 |
New York Public Library for the Performing Arts |
29 |
67 |
Renovate interior spaces |
$3,280,000.00 |
Ottendorfer Branch |
29 |
66 |
ADA Compliance, Exterior Restoration and Security System |
$1,917,000.00 |
Roosevelt Island Branch |
28 |
65 |
Roosevelt Island - New branch construction |
$10,000,000.00 |
Schomburg Center for Research in Black Culture |
30 |
70 |
Phase II renovations |
$6,470,000.00 |
Science, Industry, and Business Library (SIBL) |
26 |
75 |
Renovate Select Spaces/Systems |
$1,800,000.00 |
Seward Park Branch |
25 |
64 |
Sidewalk Vault Rehabilitation and Security System |
$323,000.00 |
Stephen A. Schwarzman Building |
26 |
75 |
Renovation of interior spaces |
$20,250,000.00 |
Stephen A. Schwarzman Building |
26 |
75 |
Technology replacement and technology infrastructure improvements |
$1,250,000.00 |
Stephen A. Schwarzman Building |
26 |
75 |
Systems replacement, freight elevator, sidewalk vault |
$29,242,000.00 |
Tompkins Square Branch |
25 |
74 |
Exterior Rehabilitation, Systems Upgrade, and Security System |
$2,125,000.00 |
Washington Heights Branch |
30 |
71 |
Full interior renovation |
$7,479,186.00 |
Yorkville Branch |
26 |
73 |
Full interior and exterior renovation |
$9,495,360.00 |
Dongan Hills Branch |
Richmond |
24 |
62 |
Full Interior and Exterior Renovation |
$3,937,500.00 |
Great Kills Branch |
24 |
62 |
Repoint Façade |
$500,000.00 |
Hugenot Park Branch |
24 |
62 |
Full interior renovation |
$3,274,740.00 |
Port Richmond Branch |
23 |
61 |
Full Interior Renovation |
$4,950,225.00 |
Richmondtown Branch |
24 |
62 |
Partial Renovation |
$4,200,000.00 |
Rossville Branch Library |
n/a |
n/a |
Proposed new branch construction |
$8,366,000.00 |
St. George Library |
23 |
61 |
Full interior and exterior renovation |
$15,070,176.00 |
Stapleton Branch |
23 |
61 |
Furniture, equipment and library materials |
$500,000.00 |
Staten Island - various |
Various |
Various |
Technology infrastructure upgrade |
$1,040,000.00 |
Staten Island- various |
Various |
Various |
Borough Wide- Security Systems |
$750,000.00 |
Todt Hill- Westerleigh Branch |
24 |
63 |
Partial Renovation |
$5,004,048.00 |
Tottenville Branch |
24 |
62 |
New Roof, Plaza Rehabilitation, Lighting, Fence and Security System |
$1,226,000.00 |
West New Brighton Branch |
23 |
61 |
Full interior renovation |
$3,987,600.00 |
System |
Library Name |
County |
Sen. Dist. |
Asy. Dist. |
Project Description |
Amount |
System Total |
Nioga Library System |
$7,212,683.00 |
|
Corfu Free Library |
Genesee |
61 |
139 |
Interior finishing on Phase III of new addition |
$35,000.00 |
Haxton Memorial Library |
61 |
139 |
Window replacement for greater energy efficiency - this project is currently being undertaken in different phases due to lack of funds |
$78,000.00 |
Pavilion Public Library |
61 |
147 |
building expansion for new children's room |
$105,000.00 |
Richmond Memorial Library |
61 |
139 |
New ground floor exit from the children's room, including outside site work |
$45,000.00 |
LeRoy-Woodward Memorial Library |
61 |
139 |
Central air conditioning throughout library building and energy efficient window coverings. |
$110,692.00 |
Barker Free Library |
Niagara |
62 |
139 |
Interior and exterior rehabilitation |
$19,550.00 |
Lewiston Public Library |
62 |
138 |
Energy efficient doors and window films; motion sensor lighting |
$19,400.00 |
Lockport Public Library |
62 |
142 |
Lighting and replacement of HVAC units based on recommendations made by NYSERDA |
$40,000.00 |
Middleport Public Library |
62 |
142 |
Interior rennovations |
$28,000.00 |
Newfane Free Library |
62 |
138 |
Interior Rennovations |
$10,000.00 |
Niagara Falls Public Library |
62 |
138 |
Roof repair and resurfacing; drywall replacement and interior finishing |
$80,000.00 |
Niagara Falls Public Library-LaSalle Branch |
60 |
138 |
Restoration of second floor |
$30,00 |
Nioga Library System |
62 |
138 |
Replace three air conditioning units, roof replacement; installation of eight wind turbines; addition to house computer equipment; parking lot renovation; repairs to exterior of original building; handicap accessible entrance |
$852,400.00 |
North Tonawanda Public Library |
62 |
140 |
Replacement of existing furnace and air conditioning units |
$10,500.00 |
Ransomville Free Library |
62 |
138 |
Library addition and new building construction for storage of historical items |
$50,000.00 |
Sanborn-Pekin Free Library |
62 |
138 |
Interior rennovations and new meeting room |
$250,000.00 |
Wilson Free Library |
62 |
138 |
Roof replacement; installation of new drainage system; replacement of concrete flooring |
$70,250.00 |
Youngstown Free Library |
62 |
138 |
Building expansion |
$451,000.00 |
Community Free Library |
Orleans |
62 |
139 |
Reconfiguration of old space |
$28,000.00 |
Lee-Whedon Memorial Library |
62 |
139 |
Property acquisition and building expansion |
$920,000.00 |
|
Swan Library |
62 |
139 |
Site acquisition and new library building |
$4,000,000.00 |
|
Yates Community Free Library |
62 |
139 |
Parking lot expansion |
$9,891.00 |
System |
Library Name |
County |
Sen. Dist. |
Asy. Dist. |
Project Description |
Amount |
System Total |
North Country Library System |
$8,140,900.00
|
|
Adams Center Free Library |
Jefferson |
48 |
122 |
Carpeting, shelves, renovate children's room, addition to the library, land acquisition |
$310,000.00 |
Adams Free Library |
48 |
122 |
New building |
$150,000.00 |
Bodman Memorial Library (PHI) |
48 |
118 |
New walkway/sidewalk to parking area, handicap ramp(s), renovate upstairs to expand usable space, new heating system, retooling the foundation, new flooring and carpeting throughout, new electrical, renovations to make all areas of the library accessible to patrons in wheelchairs (including restroom) |
$80,000.00 |
Cape Vincent Community Library |
48 |
118 |
Replacement of roof; renovations to make front entrance handicap accessible, convert deck are into usable space, new electrical to office and storeroom |
$117,000.00 |
Carthage Free Library |
48 |
122 |
Renovations to make all areas of the library accessible to patrons in wheelchairs (including restroom), elevator, improvements to parking, addition for community meeting room, additional storage and computer space |
$900,000.00 |
Crosby Public Library (ANT) |
48 |
118 |
New windows, new lighting, resurface the floor, install a lift, replace the sidewalk and steps, wheelchair accessible bathroom, renovation of basement |
$25,000.00 |
Dexter Free Library |
48 |
118 |
Paved 50 foot driveway, 12 vehicle parking lot, new carpets, new furniture |
$80,000.00 |
East Hounsfield Free Library |
48 |
118 |
New siding, wheelchair ramp, renovations to make all areas of the library accessible to patrons in wheelchairs (including restroom), meeting/reading room, additional dry storage space |
$100,000.00 |
Hawn Memorial Library (CLA) |
48 |
118 |
Install a second bathroom, new roof (or lean-to awning) |
$25,000.00 |
Lyme Free Library (CHA) |
48 |
118 |
Addition, elevator, additional space for children's area, renovations to make all areas of the library accessible to patrons in wheelchairs |
$280,000.00 |
North Country Library System |
48 |
124 |
Expand garage, emergency generator |
$100,000.00 |
Philomathean Free Library (BEL) |
48 |
122 |
New roof, new windows, new floor for upstairs, new front doors, handicap ramps and bathroom, new lighting and electrical, renovate parking area, install (3) AC units, new carpeting throughout library |
$100,000.00 |
Roswell P. Flower Memorial Library |
48 |
118 |
New Roof and renovation of existing space to make a handicap accessible Book Store |
$100,000.00 |
Sally Ploof Hunter Memorial Library (BLR) |
48 |
122 |
Addition for meeting room |
$150,000.00 |
Theresa Free Library |
48 |
118 |
New furnace |
$5,000.00 |
Constableville Village Library |
Lewis |
47 |
122 |
Renovations to make all areas of the library accessible to patrons in wheelchairs , renovation of the attic to house historical materials collection, new floor in basement, renovations to exterior of the library |
$25,000.00 |
Croghan Free Library |
47 |
122 |
New roof, carpet, painting, lighting, stucco work on exterior, addition for computer room, new emergency exits |
$135,000.00 |
Harrisville Free Library |
47 |
122 |
Remodel upstairs, painting outside of building, new doors on back, replace carpet, new roof on back, insulate attic, new bathroom, install a railing to the basement |
$40,000.00 |
Lowville Free Library |
47 |
122 |
Tuck-point brick exterior, painting trim and doors, replace roof, new steps, water drainage issues |
$100,000.00 |
Lyons Fall Library |
47 |
122 |
New ceiling |
$10,000.00 |
Osceola Public Library |
47 |
115 |
Renovations to make all areas of the library accessible to patrons in wheelchairs, plumbing |
$50,000.00 |
Port Leydon Community Library |
47 |
122 |
Addition |
$150,000.00 |
William H. Bush Memorial Library (MAR) |
47 |
122 |
Addition, new roof, window treatments, new carpeting, energy efficient lighting, furnace/heating upgrades, and painting |
$150,000.00 |
Annie P. Ainsworth Memorial Library (SCR) |
Oswego |
48 |
122 |
solar panel/insulation |
$9,900.00 |
Central Square Library |
48 |
115 |
New windows and doors |
$12,000.00 |
Cogswell Free Library (ORW) |
48 |
122 |
New carpet and windows |
$50,000.00 |
Fulton Public Library |
48 |
124 |
River-level basement finished off for community room, brick and stone work, new addition, new flooring, new windows |
$540,000.00 |
Hannibal Free Library |
48 |
128 |
Central air with dehumidifier, renovations of interior to convert storage space into Genealogy Center, addition or expand library into other side of building, new windows and doors, parking |
$600,000.00 |
Mexico Public Library |
48 |
124 |
New roof, new furniture, new equipment, additional space for public access computers, second bathroom/handicap bathroom, new windows, renovations to the Community Room |
$240,000.00 |
Williamstown Library |
48 |
115 |
Addition |
$125,000.00 |
Hammond Free Library |
St. Lawrence |
48 |
118 |
Extensive renovations to basement of existing library to make space usable; replacement of roof; construction of exterior ramp to comply with ADA specifications; replacement of hot water heater |
$90,000.00 |
Hepburn Library of Colton |
47 |
122 |
Restoring cornice, restoring columns, renovating upstairs bathroom |
$77,000.00 |
Hepburn Library of Edwards |
48 |
122 |
Renovations to make all areas of the library accessible to patrons in wheelchairs (including restroom) |
$100,000.00 |
Hepburn Library of Hermon |
48 |
122 |
New lighting, new electrical, create storage area in attic |
$100,000.00 |
Hepburn Library of Lisbon |
48 |
118 |
Renovations to make all areas of the library accessible to patrons in wheelchairs (including restroom), new windows |
$140,000.00 |
Hepburn Library of Madrid |
48 |
122 |
Mason work to exterior of building, renovations to make all areas of the library accessible to patrons in wheelchairs, energy efficiency, drainage issues |
$500,000.00 |
Hepburn Library of Norfolk |
47 |
122 |
Renovations to make restroom wheelchair accessible, Renovating downstairs of library to make into usable shelving area/learning center and meeting room with efficiency kitchen, Restructuring new space upstairs into a Reading Center/Coffee Center |
$85,000.00 |
Hepburn Library of Waddington |
48 |
118 |
Upgrades to air conditioning system, replace radiators with baseboard heat, updating library interior |
$100,000.00 |
Heuvelton Free Library |
48 |
122 |
New building (to allow for handicap accessibility) |
$1,000,000.00 |
Hopkinton Reading Center |
|
|
New building |
$150,000.00 |
Massena Public Library |
47 |
118 |
Renovation of the staff workroom |
$35,000.00 |
Morley Library |
47 |
118 |
Replacement of roof, windows and doors to increase energy-efficiency/energy conservation |
$30,000.00 |
Morristown Public Library |
48 |
118 |
Convert attic to usable space |
$200,000.00 |
Ogdensburg Public Library |
48 |
118 |
New elevator, new windows, new roof, new flooring, upgrades to electric and plumbing, new fire/security system, renovations to make all areas of the library accessible to patrons in wheelchairs, insulation, parking improvements |
$440,000.00 |
Potsdam Public Library |
47 |
118 |
Installation of elevator in existing elevator shaft and additional floor stops; renovations to install ramps, walkways, fire doors, and walls to provide access to the second and third floors of the library |
$185,000.00 |
Reading Room Association of Gouverneur |
48 |
122 |
New ceiling, new lights |
$30,000.00 |
Richville Free Library |
48 |
122 |
Solar heat for addition, new porch, new exit |
$100,000.00 |
System |
Library Name |
County |
Sen. Dist. |
Asy. Dist. |
Project Description |
Amount |
System Total |
Onondaga County Public Library |
$22,855,132.00
|
|
Baldwinsville Public Library |
Onondaga |
50 |
124 |
2010 - Purchase and installation of solar/wind renewable energy systems based upon 2009 NYSERDA design study recommendation ($300,000) 2011 - Purchase and installation of geothermal renewable energy system based upon 2009 NYSERDA design study recommendation ($500,000) 2012 - Purchase/lease of adjacent land and construction of parking lot ($350,000) 2013 - Expansion of library into basement level ($1,500,000) 2014 - Purchase of reconfigurable auditorium for basement level ($300,000) |
$2,950,000.00 |
Beauchamp Branch Library |
49 |
119 |
Replace doors for ADA compliance; ADA compliant restrooms; energy efficient windows; new roof; Replace inefficient light fixtures; secondary exit |
$628,708.00 |
Betts Branch |
50 |
120 |
Fire alarm system; energy efficient lighting; energy efficient windows; replace heating and AC |
$418,161.00 |
Central Library |
49 |
120 |
Roof; Sorting room expansion; replace compact shelving; Level 5 HVAC; renovate restroom; Improve restroom accessibility; carpet; new exterior and interior signage; relocate bookdrop to inside; renovate street level entrance |
$603,013.00 |
Dewitt Community Library |
49 |
119 |
New facility, including purchase of land |
$5,000,000.00 |
Fayetteville Free Library |
49 |
121 |
Extend front porch, Install ADA compliant automatic doors at both front entrances, Continue development of existing unused interior spaces, parking lot expansion and repair |
$1,500,000.00 |
Hazard Branch Library |
50 |
120 |
ADA compliant restrooms; ADA compliant elevator; ADA compliant lift in mezzanine; fire alarm system; roof; energy efficient lighting; energy efficient windows; HVAC, heating and AC |
$784,233.00 |
LaFayette Public Library |
50 |
121 |
building expansion |
$300,000.00 |
Liverpool Public Library |
50 |
119 |
Addition, thermal windows, interior ceiling tiles, electrical and plumbing upgrades, meeting room renovation |
$2,500,000.00 |
Maxwell Memorial Library |
50 |
124 |
upgraded furnace ($12,000); upgraded lighting ($8,700); analysis of space efficiency and use ($8,000) |
$28,700.00 |
Mundy Branch Library |
50 |
120 |
fire alarm system and site lighting; roof; energy efficient lighting |
$239,401.00 |
Paine Branch Library |
50 |
120 |
fire alarm system; ADA compliant restrooms; roof; energy efficient lighting; energy efficient windows; replace heating and AC; wiring |
$349,865.00 |
Petit Branch Library |
49 |
119 |
Replace doors for ADA compliance; ADA compliant restrooms; roof; energy efficient lighting; energy efficient windows; replace heating and AC; fire alarm system, wiring |
$372,329.00 |
Solvay Public Library |
50 |
120 |
energy efficient window treatments (solar shades); energy efficient windows; attic insulation; geothermal energy |
$250,000.00 |
Soule Branch Library |
49 |
119 |
ADA compliant elevator; ADA compliant lift; roof; energy efficient lighting; energy efficient windows; fire alarm system; wiring |
$540,076.00 |
White Branch Library |
50 |
120 |
ADA compliant restrooms; ADA compliant elevator; fire alarm system; energy efficient lighting; dry well; replace heating (boiler and piping); wiring |
$564,541.00 |
System |
Library Name |
County |
Sen. Dist. |
Asy. Dist. |
Project Description |
Amount |
System Total |
Pioneer Library System |
$32,157,795.00
|
|
Avon Free Library |
Livingston |
59 |
147 |
Renovate the old kitchen into a workroom. Improved lighting |
$38,000.00 |
Bell Memorial Library |
57 |
147 |
Furnace, windows, doors, parking |
$40,000.00 |
Caledonia Library Association |
59 |
147 |
Addition (includes additional meeting space, additional space for public access computers), new wiring for electrical equipment and telecommunications, renovations to make all areas of the library accessible to patrons in wheelchairs (including restroom) |
$500,000.00 |
Dansville Public Library |
57 |
147 |
New addition (including additional meeting room space, study/reading area, additional space for public access computers) . Renovations to existing building including new windows, column repair, remodeling and refurbishing for re-use of historic National Register building for children's collection and services; including story stage area, smaller meeting rooms. Electrical upgrades. Installation of elevator. New construction will be joined to historic building at the first floor level. |
$3,250,000.00 |
Lima Public Library |
59 |
147 |
New Community Room expansion requires equipment for 50 chairs and a chair storage cart, locking bookcase, movable folding displays and 2 tables, 8 wireless laptops, PC projector, video/sound recording equipment, PC projector, and gamining package. If space permits, a counter, sink, faucet and base cabinet for beverage area |
$22,000.00 |
Livonia Public Library |
59 |
130 |
HVAC upgrades and renovations to existing building, new addition Adding to the current project description is a need for an elevator, ADA accessible bathroom, energy efficient windows and HVAC system, and the purchasing of the adjacent property for the anticipated addition. |
$3,000,000.00 |
Mount Morris Library |
57 |
147 |
Site acquisition, new parking, new addition, improved accessibility, renovation of current space |
$550,000.00 |
Wadsworth Library |
59 |
147 |
Replace lighting in 1995 addition with more energy efficient fixtures. Install elevator. |
$200,000.00 |
Bloomfield Public Library |
Ontario |
59 |
130 |
Install ramp to sidewalk from handicapped parking space. Additional meeting space. New roof. Additional space for public access computers. Replace carpeting. Renovations to parking lot |
$90,000.00 |
Bristol Library |
59 |
129 |
Upgrade electrical service, replacement windows and front door, ADA compliant shelving, replace carpeting. |
$29,795.00 |
Clifton Springs Library |
54 |
129 |
Additional space to accommodate 10 year growth of the collection, additional public access computer space |
$90,000.00 |
Geneva Public Library |
54 |
129 |
Cooling tower, café and reading room construction, energy audit & HVAC upgrades,heat pump replacements--may be annual need, storm windows, interior & exterior painting, entrance renovations, bathroom addition, carpet replacement; addition of mobile branch (bookmobile)* |
$300,000.00 |
Honeoye Public Library |
59 |
130 |
New roof, replace front entryway stairs, renovation of room on lower level, new lighting on lower level, restroom/kitchen on lower level, lighting & parking behind the building, renovation of entryway to lower level, window replacement on main level. |
$100,000.00 |
Naples Library |
59 |
130 |
New roof, exterior renovation, new carpeting |
$30,000.00 |
Phelps Community Memorial Library |
54 |
129 |
Update 1950s plumbing & fixtures |
$10,000.00 |
Pioneer Library System |
61 |
139 |
Interior renovations |
$15,000.00 |
Red Jacket Community Library |
54 |
129 |
Purchase of a new facility (commercial real estate) and furnishings. |
$5,000,000.00 |
Victor Free Library |
54 |
130 |
Replace HVAC to increase energy efficiency and distribution. Upgrade lighting. Replace restroom fixtures. Increase space for public access computers. |
$100,000.00 |
Wood Library Association |
59 |
129 |
Addition (including additional meeting space and additional space for public access computers, creation of teen area and enlarging of Children's library), renovations to make all areas of the library accessible to patrons in wheelchairs including new handicapped accessible elevator. |
$5,000,000.00 |
Clyde-Savannah Public Library |
Wayne |
54 |
128 |
Improved lighting |
$15,000.00 |
Lyons Public Library |
54 |
128 |
While the library moved into a new/renovated facility in 2008, it still needs an elevator to make the basement (future expansion space) handicapped accessible. |
$70,000.00 |
Macedon Public Library |
54 |
128 |
Putting an addition onto the present facility |
$500,000.00 |
Marion Public Library |
54 |
128 |
New outdoor lighting, additional space for public access computers |
$20,000.00 |
Newark Public Library |
54 |
128 |
Roof, elevator, renovation to expand teen & children's areas |
$183,000.00 |
Ontario Public Library |
54 |
128 |
New facility |
$5,000,000.00 |
Palmyra Kings Daughters Free Library |
54 |
128 |
Renovations to recently purchased building for new library |
$2,000,000.00 |
Red Creek Free Library |
54 |
128 |
Add space by renovating the second floor (new drop ceiling, drywall, a new floor, heating and air conditioning ductwork, updated electrical for both lighting and computers, new bathroom fixtures), renovate existing kitchen; install lift of some type to make the second floor accessible |
$90,000.00 |
Rose Free Library |
54 |
128 |
Renovations to make all areas of the library accessible to patrons in wheelchairs |
$60,000.00 |
Walworth-Seely Public Library |
54 |
128 |
New building |
$4,500,000.00 |
Arcade Free Library |
Wyoming |
59 |
147 |
Move handicap accessible restroom. Also, move handicap accessible entrance. Front steps and railings need renovation |
$25,000.00 |
Cordelia A. Greene Library |
59 |
147 |
New entryway/roof/facade to lift for improved accessibility; parking lot upgrades for improved accessibility |
$70,000.00 |
Stevens Memorial Community Library |
59 |
147 |
Part 1 - The library needs to update handicapped ramp and entrance at the rear of the library which will become main entrance off the parking lot and meet ADA standards. The present entrance 80 feet along the driveway will be closed and a new porch and roof structure will give access at the front of the building. Part 2 - Moving the circulation desk with new books, magazines and DVDs to the rear entrance, opening adult shelving to be handicapped accessible. Creating new storage area for the materials at the back of the library while creating better meeting spaces where the present circulation desk is situated. Enlarging the children's area into a present office area with room for staff desks near the new circulation area. |
$750,000.00 |
Warsaw Public Library |
59 |
147 |
Automatic doors |
$10,000.00 |
Wyoming Free Circulating Library Association |
59 |
147 |
We will need to replace all of the siding on the building in the next 5 years and replace rotting boards underneath and around the foundation. We would like to add a community room with a kichen for teen and adult programs. We will need new shelves and replace old current ones. We need new carpet in the whole library. It is at least 15 years old. Our lights on the ceiling of the main room will need replacing in the next 5 years. The inside walls need refacing and the whole library needs painting which hasn't been done for at least 8 years. Install a security system. Upgrade handicapped accessible ramp and entrance to include an automatic opening door. |
$500,000.00 |
System |
Library Name |
County |
Sen. Dist. |
Asy. Dist. |
Project Description |
Amount |
System Total |
Queens Borough Public Library |
$646,660,000.00
|
|
Arverne |
Queens |
14 |
23 |
RENOVATION OUTFITTING / CUSTOMER SERVICE MODEL (CSM) / SELF CHECK BOOKDROPS (RFID) TECHNOLOGY |
$550,000.00 |
Astoria |
12 |
36 |
ELEVATOR / ADA / CUSTOMER SERVIVE MODEL / SELF CHECK |
$1,805,000.00 |
Astoria |
12 |
36 |
INTERIOR RENOVATION |
$2,320,000.00 |
Auburndale |
11 |
26 |
ROOF REPLACEMENT |
$325,000.00 |
Baisley Park |
10 |
32 |
ELEVATOR / ADA, HVAC, FIRE ALARM / CO DETECTORS, MASONRY REPAIR / SELF CHECK |
$5,305,000.00 |
Bay Terrace |
16 |
26 |
HVAC / BMS |
$460,000.00 |
Bellerose |
11 |
33 |
HVAC, FIRE ALARM / CO DETECTORS, ADA, SELF CHECK |
$1,300,000.00 |
Bellerose |
11 |
33 |
INTERIOR RENOVATION |
$2,320,000.00 |
Breezy Point |
|
|
PROPOSED NEW FACILITY |
$21,200,000.00 |
Briarwood |
14 |
27 |
ROOF REPLACEMENT, BUILDING EXPANSION / RENOVATION / SELF CHECK |
$3,130,000.00 |
Broad Channel |
10 |
23 |
SITE / ADA / SELF CHECK |
$700,000.00 |
Broadway |
12 |
30 |
RENOVATION - PHASE II / CSM / SELF CHECK |
$4,150,000.00 |
Cambria Heights |
14 |
33 |
SELF CHECK |
$100,000.00 |
Central |
14 |
29 |
FIRE ALARM / CO DETECTORS, AIR CONDITIONING, DATA CENTER / UPS, ROOF, CEILING / LIGHTING, DUCTWORK |
$10,525,000.00 |
Central |
14 |
29 |
RENOVATION / MODERNIZATION |
$75,000,000.00 |
CLDC |
14 |
29 |
CHILDREN'S LIBRARY DISCOVERY CENTER - SELF CHECK |
$1,500,000.00 |
Corona |
13 |
39 |
ROOF REPLACEMENT / WATERPROOFING / SELF CHECK |
$565,000.00 |
Corona |
13 |
39 |
ADJACENT SITES ACQUISITION / BUILDING EXPANSION |
$5,610,000.00 |
Corona Heights |
|
|
PROPOSED NEW FACILITY |
$21,200,000.00 |
Douglaston |
11 |
26 |
SELF CHECK |
$420,000.00 |
Douglaston |
11 |
26 |
REPLACEMENT FACILITY |
$21,190,000.00 |
East Elmhurst |
13 |
35 |
SELF CHECK |
$90,000.00 |
East Flushing |
11 |
25 |
HVAC / BMS, MASONRY REPAIR, WINDOWS & DOORS, SELF CHECK |
$1,710,000.00 |
East Howard Beach |
|
|
PROPOSED NEW FACILITY |
$21,200,000.00 |
Elmhurst |
11 |
26 |
REPLACEMENT FACILITY - SUPPLEMENTAL CONSTRUCTION / OUTFITTING |
$7,650,000.00 |
Flushing |
16 |
22 |
ELEVATOR, INTERIOR RENOVATION, SELF CHECK |
$5,035,000.00 |
Forest Hills |
10 |
28 |
SELF CHECK |
$300,000.00 |
Fresh Meadows |
16 |
24 |
ROOF REPLACEMENT, FIRE ALARM / CO DETECTORS, ADA, SELF CHECK |
$1,110,000.00 |
Glen Oaks |
11 |
24 |
REPLACEMENT FACILITY - SUPPLEMENTAL CONSTRUCTION, OUTFITTING, SWING SPACE, SELF CHECK |
$5,540,000.00 |
Glendale |
15 |
38 |
PHASE II & PHASE III RENOVATION / ELEVATOR / ADA, GARDEN, MAIN FLOOR, MEZZANINE, SELF CHECK |
$4,170,000.00 |
Hollis |
11 |
24 |
HVAC / BMS, ROOF REPLACEMENT, FIRE ALARM / CO DETECTORS, ADA, SELF CHECK |
$1,910,000.00 |
Hollis |
11 |
24 |
INTERIOR RENOVATION |
$2,320,000.00 |
Howard Beach |
15 |
23 |
ROOF REPLACEMENT, SELF CHECK |
$700,000.00 |
Jackson Heights |
13 |
34 |
SELF CHECK |
$300,000.00 |
Jackson Heights |
13 |
34 |
NEW REPLACEMENT FACILITY |
$52,600,000.00 |
Kew Gardens |
16 |
27 |
PROPOSED NEW FACILITY |
$21,200,000.00 |
Kew Gardens Hills |
16 |
27 |
BUILDING EXPANSION / RENOVATION - SCOPE IN DEVELOPMENT; SUPPLEMENTAL FUNDING REQUIRED |
$8,250,000.00 |
Langston Hughes |
16 |
27 |
SELF CHECK |
$95,000.00 |
Laurelton |
10 |
31 |
HVAC / BMS, FIRE ALARM / CO DETECTORS, SELF CHECK |
$935,000.00 |
Lefferts |
10 |
25 |
ROOF REPLACEMENT, SELF CHECK |
$700,000.00 |
Lefrak City |
13 |
35 |
SELF CHECK |
$550,000.00 |
Long Island City |
12 |
37 |
SECURITY LIGHTING, SELF CHECK |
$300,000.00 |
Maspeth |
15 |
30 |
FIRE ALARM / CO DETECTORS, SELF CHECK |
$375,000.00 |
McGoldrick |
11 |
22 |
ROOF REPLACEMENT, HVAC / BMS, SELF CHECK |
$885,000.00 |
McGoldrick |
11 |
22 |
INTERIOR RENOVATION |
2.320,000 |
Middle Village |
15 |
28 |
FIRE ALARM / CO DETECTORS, SELF CHECK |
$525,000.00 |
Mitchell-Linden |
16 |
26 |
MASONRY / WATERPROOFING, SELF CHECK |
$735,000.00 |
Mitchell-Linden |
16 |
26 |
REPLACE RENTAL FACILITY |
$21,190,000.00 |
North Forest Park |
15 |
28 |
SELF CHECK, SUPPLEMENTAL INTERIOR RENOVATION |
$2,030,000.00 |
North Hills |
11 |
24 |
ROOF, ADA SITE WORK / FIRE ALARM / CO DETECTORS, SELF CHECK |
$1,330,000.00 |
North Hills |
11 |
24 |
INTERIOR RENOVATION |
$1,855,000.00 |
North Jackson Heights |
13 |
34 |
PROPOSED NEW FACILITY |
$21,200,000.00 |
Ozone Park |
15 |
38 |
HVAC / BMS, SELF CHECK |
$845,000.00 |
Peninsula |
14 |
23 |
ROOF REPLACEMENT, SELF CHECK |
$850,000.00 |
Pomonok |
16 |
27 |
SELF CHECK |
$200,000.00 |
Poppenhusen |
11 |
27 |
SELF CHECK |
$550,000.00 |
Queens Village |
11 |
23 |
HVAC / BMS, ELEVATOR / ADA / RENOVATION, FIRE ALARM / CO DETECTORS, SELF CHECK |
$5,670,000.00 |
Queens West |
|
|
NEW FACILITY CONSTRUCTION & OUTFITTING (Partially funded) |
$21,350,000.00 |
Queensboro Hill |
16 |
22 |
ROOF REPLACEMENT, FIRE ALARM / CO DETECTORS, SELF CHECK |
$1,035,000.00 |
Queensboro Hill |
16 |
22 |
INTERIOR RENOVATION |
$2,320,000.00 |
Regional Libraries |
Various |
Various |
ESTABLISH (6) NEW REGIONAL LIBRARIES ($30.0 M each): |
$180,000,000.00 |
Rego Park |
16 |
28 |
MASONRY / RE-POINTING |
$350,000.00 |
Rego Park |
16 |
28 |
NEW REPLACEMENT FACILITY (Partially funded) |
$20,120,000.00 |
Richmond Hill |
10 |
27 |
ELEVATOR / ADA, HVAC / BMS, WINDOWS & DOORS, MASONRY REPAIRS, FIRE ALARM / CO DET., SELF CHECK |
$3,565,000.00 |
Richmond Hill |
10 |
27 |
INTERIOR RENOVATION |
$2,320,000.00 |
Ridgewood |
15 |
37 |
BUILDING RENOVATION PHASE II, SELF CHECK |
$565,000.00 |
Rochdale Village |
10 |
32 |
SUPPLEMENTAL EXPANSION, HVAC / BMS, ROOF, FIRE ALARM / CO DETECTORS, SELF CHECK |
$2,835,000.00 |
Rosedale |
14 |
29 |
SELF CHECK |
$200,000.00 |
Rosedale |
14 |
29 |
REPLACE RENTAL FACILITY |
$21,200,000.00 |
Seaside |
14 |
23 |
ROOF REPLACEMENT, WINDOWS & DOORS, SELF CHECK |
$1,300,000.00 |
South Jamaica |
10 |
32 |
SELF CHECK |
$100,000.00 |
South Ozone Park |
10 |
31 |
ROOF SECURITY FENCING, FIRE ALARM / CO DETECTORS, SELF CHECK |
$875,000.00 |
St. Albans |
10 |
33 |
ROOF REPLACEMENT, SELF CHECK |
$500,000.00 |
Steinway |
12 |
36 |
ROOF / MASONRY, ELEVATOR / ADA, INTERIOR RENOVATION |
$5,205,000.00 |
Whitestone |
11 |
26 |
WINDOWS & DOORS, SELF CHECK |
$1,125,000.00 |
Windsor Park |
11 |
24 |
SELF CHECK |
$235,000.00 |
Woodhaven |
15 |
38 |
ELEVATOR / ADA, HVAC / BMS, FIRE ALARM / CO DETECTORS, WINDOWS & DOORS, SELF CHECK |
$3,680,000.00 |
Woodhaven |
15 |
38 |
INTERIOR RENOVATION |
$2,900,000.00 |
Woodside |
12 |
30 |
SELF CHECK |
$300,000.00 |
System |
Library Name |
County |
Sen. Dist. |
Asy. Dist. |
Project Description |
Amount |
System Total |
Ramapo-Catskill Library System |
$134,313,200.00
|
|
Cornwall Public Library |
Orange |
39 |
96 |
Addition to existing building |
$12,500,000.00 |
Florida Public Library |
38 |
97 |
Expansion/addition |
$250,000.00 |
Goshen Public Library and Historical Society |
39 |
97 |
New building |
$15,000,000.00 |
Monroe Free Library |
39 |
97 |
Expansion/addition and renovation |
$10,000,000.00 |
Newburgh Free Library |
39 |
100 |
Renovation |
$10,000,000.00 |
Pine Bush Area Public Library |
39 |
96 |
Replacement of HVAC system; replacement of roof; construction of new, state of the art energy-efficient 300 square foot addition |
$175,000.00 |
Port Jervis Free Library |
42 |
98 |
Replace mechanical, plumbing and electrical systems and install new sprinkler system in the existing building. Replace roof, north chimney and custom-fabricated ornate cornice. New addition and interior renovations of existing building. |
$4,300,000.00 |
Thrall Public Library District of Middletown and Wallkill |
42 |
98 |
20,000 sq. ft. addition plus parking lot expansion |
$11,000,000.00 |
Tuxedo Park Library |
38 |
97 |
Replace HVAC system |
$100,000.00 |
Nanuet Public Library |
Rockland |
38 |
94 |
Demolition of existing building; construction of new state of the art, energy-efficient 40,000 square foot building |
$19,500,000.00 |
New City Free Library |
38 |
94 |
Expansion/addition and renovation, including Replacement of HVAC system; installation of new circulation desk; renovations to lobby including replacement of flooring and lighting; new front entrance steps and handicap ramp; extensive renovations to meeting room including "green" lighting system |
$16,000,000.00 |
Nyack Library |
38 |
95 |
Replace of the roof on old part of the building |
$75,000.00 |
Rose Memorial Library Association |
38 |
96 |
HVAC replacement, construction of a new ramp and accessible entrance and sewer line replacement (short term) & a new building (long term) |
$10,085,000.00 |
Tappan Library |
38 |
95 |
Expansion/addition and renovation |
$2,000,000.00 |
Tomkins Cove Public Library |
38 |
96 |
Replace windows; install energy efficient lighting; install air conditioning unit; remove and replace exterior cladding to improve energy efficiency; install solar panels |
$279,000.00 |
Valley Cottage Free Library |
38 |
94 |
Expansion of parking lot |
$400,000.00 |
Daniel Pierce Library |
Sullivan |
42 |
98 |
Complete new 23,500 square foot; demolition of old extension and building new structure; renovation of of original historic property. |
$5,000,000.00 |
Ethelbert B. Crawford Public Library |
42 |
98 |
Expansion/addition |
$9,000,000.00 |
Liberty Public Library |
42 |
98 |
Repairs, renovation and addition |
$1,700,000.00 |
Western Sullivan Public Library |
42 |
98 |
Narrowsburg branch - Replace oil burner, install hot water heater and chimney (solar ready); install solar panels and and roofs supports.
Calicoon branch - Install handicapped railing around front patio, reset or replace stones as needed; restoration of facade on back of bldg. |
$105,000.00 |
Cragsmoor Free Library |
Ulster (see also Mid-Hudson) |
42 |
101 |
ADA compliance & Replacement of HVAC system; rehabilitation work on exterior of building including sealing and insulation upgrades for energy-efficiency; installation of energy-efficient lighting; rehabilitation work on 8 ft. windows in reading room (historic building) |
$344,200.00 |
Wallkill Public Library |
39 |
101 |
Construction of new state of the art, energy-efficient 8,700 square foot addition to existing library building |
$6,500,000.00 |
System |
Library Name |
County |
Sen. Dist. |
Asy. Dist. |
Project Description |
Amount |
System Total |
Southern Tier Library System |
$17,506,473.00
|
|
Alfred Box of Books Library |
Allegany |
57 |
147 |
Renovation |
$100,000 |
Belfast Public Library |
57 |
149 |
New roof |
$25,000 |
Belmont Literary & Historical Society Free Library |
57 |
147 |
New front steps and railing, new door, elevator |
$65,000 |
David A. Howe Public Library |
57 |
149 |
Complete restoration, hot-water heating, air conditioning, elevator; reconstruction of exterior stairway; replacement and restoration of building's original windows |
$5,145,000 |
Wide Awake Club Library |
57 |
147 |
buying, building or renovating |
$725,000 |
Chemung County Public Library – Big Flats |
Chemung |
53 |
137 |
Handicapped restroom, fire detection, windows, other. Replacement of drywell and drainage in back parking lot |
$171,554 |
Chemung County Public Library – Horseheads |
53 |
137 |
Roof and other renovation, window replacement, parking lot repairs |
$314,813 |
Chemung County Public Library – Steele |
53 |
137 |
Replacement of roof; complete rehabilitation of parking lot. Replacement of bookmobile |
$985,000 |
Chemung County Public Library – West Elmira |
53 |
137 |
Handicapped restroom & interior alterations, windows, other |
$180,106 |
Dutton S. Peterson Memorial Library |
Schuyler |
53 |
137 |
Grading and foundation for addition , wiring, roof, windows, foundation, furniture,
|
$100,000 |
Cohocton Public Library |
Steuben |
53 |
136 |
Renovation and addition |
$100,000 |
Howard Public Library |
53 |
136 |
Elevator, renovation |
$90,000 |
Prattsburgh Library |
53 |
136 |
Restoration second floor |
$75,000 |
Southeast Steuben County Library |
53 |
136 |
New library building |
$1,500,000 |
Wimodaughsian Free Library |
53 |
136 |
renovation - second floor |
$100,000 |
Middlesex Reading Center |
Yates |
53 |
136 |
Addition |
$30,000 |
Penn Yan Public Library |
53 |
136 |
Renovate & expand existing building |
$7,800,000 |
System |
Library Name |
County |
Sen. Dist. |
Asy. Dist. |
Project Description |
Amount |
System Total |
Upper Hudson Library System |
$112,272,323.00 |
|
Albany Public Library - Main |
Albany |
46 |
106 |
Construct a new Main Library building |
$50,000,000 |
Albany Public Library - Arbor Hill/WestHill |
46 |
104 |
Construct a new 12,000 square foot branch library, including geothermal wells |
$5,715,745 |
Albany Public Library - Delaware |
46 |
106 |
Total renovation/rehabilitation and major energy-efficiency upgrades |
$4,728,074 |
Albany Public Library - Howe |
46 |
106 |
Total renovation/rehabilitation and major energy-efficiency upgrades |
$5,242,637 |
Albany Public Library - New Scotland |
46 |
104 |
Construct a new building and name it the John J. Bach Branch Library |
$4,048,580 |
Albany Public Library - Pine Hills |
46 |
104 |
Total renovation/rehabilitation and major energy-efficiency upgrades |
$4,784,437 |
Altamont Free Library |
46 |
104 |
Extensive renovations of the Altamont Train Station: Re-do interior of new building, build rest rooms, build meeting rooms, construct proper entrances, build parking lot, landscaping, and purchase new library furniture |
$500,000 |
Berne Public Library |
46 |
104 |
Renovate existing Hilltown Senior Center building to become a library or purchase land and build a new library. |
$400,000 |
Bethlehem Public Library |
46 |
108 |
Expansion of existing building to increase storage, staff and public service areas. |
$1,500,000 |
Cohoes Public Library |
46 |
106 |
Renovate and reconstruct existing building |
$200,000 |
Guilderland Public Library |
46 |
104 |
Renovate existing building and expand it by 20,000 square feet |
$12,300,000 |
RCS Community Library |
46 |
108 |
Expand the current building by 3,000 square feet |
$1,200,000 |
Rensselaerville Public Library |
46 |
104 |
Replacement of siding; rehabilitation of roof; reconfiguration of basement space to use as storage and work area |
$37,850 |
Town of Westerlo Public Library |
46 |
104 |
Expand existing library into adjacent museum space with new furnishings and equipment |
$100,000 |
Voorheesville Public Library |
46 |
104 |
Construct a new 20,000 square foot library building |
$8,000,000 |
Wm. K. Sanford Public Library |
46 |
109 |
Expand the current building by 15,000 square feet |
$6,000,000 |
Brunswick Community Library |
Rensselaer |
43 |
108 |
Extensive renovations to interior and exterior of newly purchased building |
$135,000 |
East Greenbush Community Library |
43 |
106 |
Repair and rehabilitate tile work on front of building; repair around windows and sheet rock inside |
$100,000 |
Grafton Community Library |
43 |
112 |
Expand existing building |
$150,000 |
Poestenkill Library |
43 |
108 |
Expand existing building and install an elevator |
$500,000 |
Rensselaer Public Library |
43 |
106 |
Renovation (general construction components) of newly purchased library building (including upgraded energy-efficient electrical, plumbing, and heating/cooling systems) |
$1,000,000 |
Sand Lake Town Library |
43 |
108 |
Renovate adult, teen, and circulation/staff areas of the library |
$95,000 |
Stephentown Memorial Library |
43 |
112 |
Construction of handicapped accessible deck area for community use; reconfiguration of existing building to create staff work area and Director's office; new carpeting in original library space; replace old roof; create a teen area in original library space; expand children's area in existing building. |
$35,000 |
Troy Public Library |
43 |
106 |
Renovate existing Main Library building |
$3,000,000 |
Troy Public Library - Lansingburgh |
43 |
106 |
Renovate existing building |
$500,000 |
Troy Public Library- Sycaway |
43 |
106 |
Construct a new building |
$1,500,000 |
Valley Falls Free Library |
43 |
112 |
Expand existing building |
$500,000 |
System |
Library Name |
County |
Sen. Dist. |
Asy. Dist. |
Project Description |
Amount |
System Total |
Westchester Library System
|
$129,142,773.00
|
|
Ardsley Public Library |
Westchester |
35 |
92 |
Expansion and Renovation of existing building |
$1,500,000 |
Briarcliff Manor Public Library |
35 |
92 |
Renovation and furnishing of existing 2,300 sq. ft. portion of building. |
$1,000,000 |
Bronxville Public Library |
34 |
88 |
New flooring, improved electrical wiring |
$8,000 |
Chappaqua Library |
37 |
89 |
Emergency exit window for Children's program room; Renovate public restrooms to improve ADA access and energy efficiency; expand Children's Area; expand parking. New roof for 2,200 square foot expansion to the Children's Room. |
$7,010,000 |
Croton Free Library |
40 |
90 |
Renovations to circulation area, meeting room, telecommunications wiring |
$175,000 |
Dobbs Ferry Public Library |
35 |
92 |
Replacing front doors with automatic ones |
$50,000 |
Eastchester Public Library |
34 |
88 |
ADA accessibility; HVAC repair |
$500,000 |
Harrison Public Library |
37 |
89 |
New addition |
$6,250,000 |
Hendrick Hudson Free Library |
37 |
89 |
Renovation of existing building with expansion as a possibility to accommodate growing needs: HVAC and electric upgrades as proposed by energy audit report including replacement of current HVAC system with more efficient one, and changing all exit signs to LED; converting computer room to visible study room, addition of stacks; expand Children's Area; create area for Literacy program; expand Children's office space. |
$2,000,000 |
Hiram Halle Memorial Library |
40 |
90 |
Expansion and Renovation of existing building |
$2,900,000 |
John C. Hart Memorial Library |
40 |
89 |
22,000 square foot addition (including additional study room space, an additional community room, a young adult area, additional space for public access computers); replacement of HVAC system. |
$12,000,000 |
Larchmont Public Library |
40 |
99 |
Renovation of Children's Room including: new handicapped accessible bathrooms, elevator, energy efficient windows and lighting, new electrical wiring, etc. In 1926 portion of building: energy efficient lighting and windows. |
$3,200,000 |
Lewisboro Library
(formerly South Salem Library) |
37 |
91 |
Construction of new 15,000 sq. ft. building incorporating meeting space, expanded collection and expanded children's room |
$6,000,000 |
Mamaroneck Public Library District |
40 |
89 |
New construction/building expansion/renovation and rehabilitation of the existing library. |
$21,744,381 |
Mt. Pleasant Public Library |
37 |
91 |
New roof, install solar panels on roof, renovate community room, repave parking lot, new young adult area, new local history center, renovations to staff working areas |
$600,000 |
North Castle Public Library |
37 |
91 |
Refurbish the circulation area, and make all areas handicapped accessible |
$200,000 |
Port Chester Public Library |
37 |
89 |
Expansion of library building by 5,000 sq. ft. to double size of Children's Room and add a meeting room, 2 offices, and additional parking |
$3,000,000 |
Ruth Keeler Memorial Library |
37 |
91 |
Addition of a young adult area, storage area, quiet reading rooms; drainage work |
$1,500,000 |
Rye Free Reading Room |
40 |
99 |
Renovation, including restoration of the reading rooms; addition of teen space and staff workrooms; adding access to our lower level entrance; sprinklers and fire alarm; window replacement, insulation and other energy-saving initiatives. |
$2,000,000 |
Scarsdale Public Library |
37 |
91 |
New windows, new lighting, renovations to make all areas of the library accessible to patrons in wheelchairs |
$307,892 |
Somers Library |
37 |
88 |
7,000 sq. ft. addition (meeting room space, computers, enclosed children's room, teen section), new heating-air, efficient windows, efficient lighting, better outdoor lighting, new roof, repair septic system, new carpeting. |
$9,500,000 |
The Field Library |
40 |
99 |
Replace existing building |
$25,000,000 |
Town of Pelham Library |
40 |
90 |
Furnish and install sump pumps, back-up generator, and dehumidifiers. Regrade, clean and install vapor barrier, concrete pour and rat slab for crawl space. |
$27,500 |
Tuckahoe Public Library |
34 |
88 |
Alarm; upgrade electric |
$10,000 |
West Harrison Branch Library [Harrison PL] |
34 |
88 |
Additional meeting space, additional space for public access computers, elevator, additional space to house the current collection, upgrades to wiring for electrical equipment and telecommunications |
$5,500,000 |
White Plains Public Library |
37 |
88 |
New roof, new windows, new lighting, new HVAC system, wheelchair accessible restroom, young adult area, renovation of meeting rooms, reconfiguration of main lobby |
$3,000,000 |
|
Yonkers Public Library - Crestwood Branch |
35 |
93 |
ADA accessibility; HVAC/energy conservation improvements |
$725,000 |
|
Yonkers Public Library - Grinton I. Will Branch Library |
35 |
93 |
Renovation/Intrastructure improvements & parking lot expansion |
$12,700,000 |
|
Yonkers Public Library - Riverfront Library |
35 |
93 |
Teen Room remodeling/expansion. Replace automatic doors. Upgrade security system. Finish shell space in basement. |
$735,000 |