Estimated New York State Public Library Construction Needs 2010-2014

Go to:

See also: Estimated New York State Public Library Construction Needs 2012-2017

System

Library Name

County

Sen. Dist.

Asy. Dist.

Project Description

Amount

System Total

Brooklyn Public Library

$450,138,816.28

  Arlington  Kings 17 54 New boiler; roof replacement; branch restoration $9,908,662.78
Bay Ridge  22 60 Public Service (PS) Enhancements $861,622.85
Bedford 18 57 New HVAC & boiler; interior rehab; windows $3,446,491.40
Borough Park 21 48 New boiler & HVAC; interior rehab; windows; roof replacement $9,477,851.35
Brighton Beach 27 46 New boiler & HVAC; branch renovation $3,877,302.83
Brooklyn Heights 25 52 Branch renovation; windows; ADA compliance $13,872,127.89
Brower Park  20 43 Roof replacement; purchase leased facility;branch renovation $11,201,097.05
Brownsville 19 55 New boiler & HVAC; interior rehab; exterior rehab $6,720,658.23
Bushwick 17 53 Total branch rehabilitation $8,443,903.93
Canarsie 19 59 New building on site $17,232,457.00
Carroll Gardens 25 52 Roof replacement; branch renovation $9,994,825.06
Central Library 20 52 Total branch rehabilitation $86,851,583.28
Clarendon 21 58 New boiler & HVAC; ADA compliance; roof; interior rehab $3,704,978.26
Clinton Hill 18 57 Total branch rehabilitation $6,031,359.95
Coney Island 23 46 New boiler; façade renovations; new windows; PS enhancements $5,169,737.10
Cortelyou 21 44 PS enhancements; FF&E $1,464,758.85
Crown Heights 20 43 Purchase leased facility; PS enhancements $5,342,061.67
Cypress Hills 17 40 PS enhancements $2,326,381.70
DeKalb 17 53 New boiler; basement renovations;exterior rehab;windows $7,754,605.65
Dyker 22 46 ADA accessibility; windows $4,480,438.82
East Flatbush 19 58 Roof replacement; new HVAC system; branch renovations $7,151,469.66
Eastern Parkway 20 56 Total branch rehabilitation $8,960,877.64
Flatbush 20 43 Fire alarm; Abatement; PS enhancements $1,637,083.42
Flatlands 27 59 Total branch rehabilitation $8,443,903.93
Fort Hamilton 22 46 Furniture and equipment upgrade $802,500.00
Gerritsen Beach 22 59 Façade; new roof; PS enhancements $4,911,250.25
Gravesend 22 47 Purchase leased facility $4,308,114.25
Greenpoint 25 50 New building on site $20,678,948.40
Highlawn 22 47 New HVAC; boiler $1,723,245.70
Homecrest 27 45 Purchase leased facility; branch renovations $6,892,982.80
Jamaica Bay 19 59 PS enhancements $861,622.85
Kings Bay 27 44 Exterior renovations; new HVAC; roof replacement; PS enhancements $5,600,548.53
Leonard 17 53 Total branch rehabilitation; new boiler $9,994,825.06
Macon 18 56 Rear retaining wall $861,622.85
Mapleton 22 49 Exterior restoration; roof replacement $3,446,491.40
Marcy 18 56 HVAC; boiler; roof replacement; Exterior rehab, PS enhancements $6,031,359.95
McKinley Park 23 48 Purchase leased facility; branch renovations $8,960,877.64
Midwood 27 45 Boiler; PS enhancements $2,929,517.69
Mill Basin 27 59 New windows and doors; abatement $3,446,491.40
New Lots 19 40 New boiler & HVAC; interior renovation; windows $8,616,228.50
New Utrecht 22 49 New boiler & HVAC; interior renovation $10,167,149.63
Pacific 18 57 New boiler; interior rehabilitation / ADA compliance $12,924,342.75
Paerdegat 19 41 Roof replacement; purchase leased facility; PS enhancements; new boiler & HVAC; ADA compliance $7,668,443.37
Park Slope 18 44 Interior renovation $8,185,417.08
Rugby 21 58 New boiler; parking lot renovations; FF&E $2,154,057.13
Ryder 27 47 New boiler & HVAC; interior rehabilitation $6,634,495.95
Saratoga 18 55 New boiler & HVAC; interior rehabilitation $5,772,873.10
Sheepshead Bay 27 45 Purchase leased facility; interior renovation $9,477,851.35
Spring Creek 19 40 New HVAC system; interior rehab $2,498,706.27
Stone Avenue 19 55 New boiler; PS enhancements;Windows, Exterior rehab $2,843,355.41
System-wide Various Various Hazardous materials abatement & ADA compliance survey $3,446,491.40
System-wide Various Various Install Building Automation Systems & other needs $8,616,228.50
Ulmer Park 22 47 Total branch rehabilitation $8,616,228.50
Walt Whitman 18 50 Roof replacement; interior renovation $8,443,903.93
Washington Irving 17 53 Total branch rehabilitation $6,892,982.80
Williamsburgh 25 50 Exterior renovation; windows; roof restoration; window replacement $5,600,548.53
Windsor Terrace 20 44 New roof; interior rehabilitation / ADA compliance $5,772,873.10

 

System

Library Name

County

Sen. Dist.

Asy. Dist.

Project Description

Amount

System Total

Buffalo & Erie County Public Library

$57,081,519.00

  Alden (Ewell) Free Library Erie 59 142 Construction of a parking lot; interior renovations to meet ADA requirements and provide new children's room; replace HVAC on upper floor with energy efficient units; and install full energy efficient HVAC in basement.  $330,250.00
Amherst Public Library/ Audubon Library 61 148 Expand library; replace sidewalks $830,000.00
Amherst Public Library/ Eggertsville-Snyder Library 61 148 Replace windows and front door with energy efficient units; replace front entrance sidewalk pad; and restore chimney $50,000.00
Angola Public Library 59 146 Expansion of 1,138 sq. ft. for additional meeting/program space, additional space to house the collection $275,769.00
Aurora Town Public Library 59 142 Expansion or new facility: including additional space for meeting/program room, staff offices, collections, patron seating and public access computers; and/or replace  lighting with new, state of the art, energy-efficient lighting system; replacement of front entry doors with energy-efficient, ADA compliant units $5,018,000.00
BECPL - Central Library 58 141 Space Renovation/Reconfiguration/Asbestos Abatement for Phased for Exhibit Space/Cultural Tourism and balance of facility; Replace Central Library Escalators with ADA Elevators; Ellicott Entrance to ADA; and Mezzanine Space Construction. $16,850,000.00
BECPL - Crane Branch 60 144 New or expanded facility; replace windows with energy-efficiency upgrades $3,550,000.00
BECPL - Dudley Branch 58 145 New or expanded facility; replace windows with energy-efficiency upgrades; replace existing floor to incorporate new wiring and electrical for connectivity and computer terminals $3,600,000.00
BECPL - East Clinton Branch 58 145 Expand existing facility, including land acquisition; Replace lighting with new, energy-efficient lighting system; replace of existing floor to incorporate new wiring and electrical for connectivity and computer terminals $1,610,000.00
BECPL - East Delavan Branch 60 141 Elevator, renovations to make all areas of the library accessible to patrons in wheelchairs, handicapped accessible restrooms $350,000.00
BECPL - Frank E. Merriweather, Jr. Branch 60 141 Additional ADA door openers $5,000.00
BECPL - Niagara Branch 58 144 Replace boilers with geothermal wells $130,000.00
BECPL - North Park Branch 60 144 New and/or expanded and renovated facility $3,500,000.00
BECPL - Riverside Branch 60 144 Expand facility; replace existing lighting with energy-efficient lighting system; and ceiling tiles to improve energy conservation $520,000.00
Cheektowaga Public Library/Anna Reinstein Memorial Library 58 143 Rehabilitate parking lot $15,500.00
Cheektowaga Public Library/Julia B. Reinstein Library 58 143 Rehabilitate parking lot $5,000.00
City of Tonawanda Public Library 61 140 Replace HVAC system; rehabilitate the library's exterior walls; and replace deteriorated sidewalks $175,000.00
Clarence Public Library 61 142 Convert existing alcoves to enclosed study areas; construct wind barrier for front entry to building. $45,000.00
Collins Public Library 59 146 Installation of electric door openers to make front entry doors more easily ADA accessible $5,000.00
Elma Public Library 59 142 New facility $5,000,000.00
Grand Island Memorial Library 60 144 Roof replacement $110,000.00
Hamburg Public Library: Hamburg Main Library 58 146 Additional meeting/program room space, reconstruct entrance for improved accessibility, additional space to accommodate 10 years’ growth of the collection. $750,000.00
Hamburg Public Library: Lake Shore Branch 58 146 Replace with new expanded facility ($3,500,000)   $3,500,000.00
Lackawanna Public Library 58 146 Restoration of ceiling, upgrades to heating system, reconstruct chimney $75,000.00
Lancaster Public Library 59 143 Parking lot expansion; new wiring for electrical equipment and telecommunications; resurface/recondition existing concrete floor; replace original single pane windows with energy efficient units; replace inefficient globe lighting; and replace deteriorated ceiling sections. $400,000.00
Marilla Free Library 59 142 Reconstruct ADA entry, enclosure and Lift to Lower Level; and reconfigure existing 3,400 square foot library to create more economical use of space including the expansion of the library's Employment/Education Resource Center $262,000.00
Newstead Public Library 61 142 Outdoor equipment storage shed $15,000.00
Orchard Park Public Library 59 145 Expansion, generator $1,255,000.00
Town of Tonawanda Public Library 61 140 New building, equipment and furnishings $7,000,000.00
West Seneca Public Library 58 145 Expansion, new floors, lighting, theft detection.  Convert existing meeting room to computer lab and replace aging HVAC with energy efficient units. $1,850,000.00

 

System

Library Name

County

Sen. Dist.

Asy. Dist.

Project Description

Amount

System Total

Chautauqua Cattaraugus Library System

$24,183,000.00

Allegany Public Library Cattaraugus 57 149 Elevator, new HVAC system, rewiring for computers, new lighting, public meeting room, addition  $398,000.00
Cattaraugus Free Library 57 149 New windows and doors $15,000.00
Ellicottville Memorial Library 57 149 Storage area (attached to building with outside entrance) $10,000.00
Olean Public Library 57 149 Renovate existing building, including a 11,000 sq. ft.  Addition, replacement of HVAC system, and new roof $4,000,000.00
Portville Free Library 57 149 New balustrades,  extend parking lot, addition $1,250,000.00
Salamanca Public Library 57 149 Replacement of windows and vinyl siding  $25,000.00
Seneca-Nation-Allegany Branch 57 149 New library building  $1,500,000.00
Ahira Hall Memorial Library Chautauqua 57 150 New facility $3,000,000.00
Alexander Findley 57 150 Renovate existing space and build 10' x 30' addition with separate wheelchair accessible entrance $75,000.00
Ashville Free Library 57 150 Addition for a children's room and storage space, new windows and doors, wheelchair ramp, new roof, renovate second floor $270,000.00
Bemus Point Public Library 57 150 Office for librarian and staff $10,000.00
Cassadaga Branch 57 150 New roof $65,000.00
Clymer-French Creek Free Library 57 150 Addition, renovate 2nd floor $300,000.00
Darwin R. Barker Library 57 150 Addition of 2nd floor mezzanine, main floor remodeling   $1,500,000.00
Dunkirk Free Library 57 149 Addition including computer lab, café and teen center $1,000,000.00
Falconer Public Library 57 150 Renovations to make all areas of the library accessible to patrons in wheelchairs, upgrades to heating, additional space to house new technology, HVAC and lighting replacement $100,000.00
Farman Free Library 57 149 Additional meeting space, additional space to house the collection, new children's area, elevator, renovate 2nd floor $275,000.00
Fluvanna Free Library 57 150 Addition  $300,000.00
Gowanda Free Library 57 149 Addition with handicapped accessibility, extend the parking lot $1,000,000.00
Hazeltine Public Library 57 150 Window replacements, addition $500,000.00
James Prendergast 57 150 Addition, new windows and doors, automated front door, wheelchair accessible restroom, new roof $3,625,000.00
Kennedy Free Library 57 149 New facility $2,500,000.00
Mary E. Seymour 57 150 Elevator $75,000.00
Mayville Library 57 150 New roof, interior remodeling, new parking lot $100,000.00
Minerva Free Library 57 150 Addition with elevator  $1,000,000.00
Myers Memorial Library 57 149 New windows, interior renovations $70,000.00
Patterson Library 57 150 Air conditioning system for archival rooms,  install moisture barrier to address ground water problem in lower level $850,000.00
Ripley Free Library 57 150 Interior remodeling, meeting room addition $300,000.00
Sinclairville Free Library 57 149 Storage area  $10,000.00
Smith Memorial Library 57 150 New boiler heating system, renovate listening room $60,000.00

 

System

Library Name

County

Sen. Dist.

Asy. Dist.

Project Description

Amount

System Total

Clinton-Essex-Franklin Library System

$3,536,500.00

  CEF Headquarters Clinton 45 114 Repair cement steps; install safety railing in garage; reconstruct collapsing driveway $25,000.00
Chazy Public Library 45 114 Handicapped Accessible ramp and associated groundwork $12,500.00
Dodge Memorial Library 45 114 Replacement of slate roof on historic building; insulate and weatherize attic for increased energy efficiency.  Outside staircase to access the second floor of the building, new basement staircase, new fuel tank (work that can be accomplished to be determined by match requirements, otherwise cannot afford/will not do work) $100,000.00
Ellenburg Sarah A. Munsil Library 45 114 Separate meeting room for library program, young adult area, renovations to make second floor and basement wheelchair accessible (work that can be accomplished to be determined by match requirements, otherwise cannot afford/will not do work) $10,000.00
Mooers Free Library 45 114 Replace windows with energy efficient version; handicapped access ramp to meet ADA requirements; furnace replacement $25,000.00
Plattsburgh Public Library 45 114 Current project underway; would like to add solar panels to roof if no match is required.  Otherwise, cannot afford/will not do work $376,000.00
Elizabethtown Library Association Essex 45 113 Replacement and reframing of door and replacemnt of building's historically significant windows (historic building); work that can be accomplished to be determined by match requirements; otherwise cannot afford/will not do work) $12,000.00
Hammond Library of Crown Point 45 113 basement renovations - sealing cement block, replace existing lighting, install 3,00 sq. ft. floor; exterior ramp to comply with ADA; install ADA compliant bathroom; replace hot water heater; roof replacement, replace windows with energy efficient version (work that can be accomplished to be determined by match requirements otherwise cannot afford/will not do work) $75,000.00
Keeseville Free Library 45 114 Install new energy efficient windows throughout the building; furnace replacement (cost is estimated) $30,000.00
Paine Memorial Library 45 113 New windows, commercial air conditioning system, New lighting, wheelchair accessible restroom $35,000.00
Schroon Lake Public Library 45 113 New Library Building $1,500,000
Sherman Free Library 45 113 Wheelchair ramp; handicapped accessible restroom/related ADA improvements $20,000.00
Wadhams Free Library 45 113 Parking improvements $10,000.00
Westport Library Association 45 113 foundation work, porch repairs, ADA access (historic building) $35,000.00
Goff-Nelson Memorial Library Franklin 45 114 Boiler Replacement; Replace Fuel Oil Storage Tank; Chimney and Masonery Restoration; Water Seepage (2 walls); Replace Lights; Roof replacement; Windows replaced with energy efficient version; replace entryway slab; ADA compliant ramp; Repair eaves causing water damage, and gutters; ADA compliant doors $271,000.00
Wead Library of Malone 45 114 Intallation of elevator would require expansion per architect estimated cost of $1 million $1,000,000

 

System

Library Name

County

Sen. Dist.

Asy. Dist.

Project Description

Amount

System Total

Finger Lakes Library System

$11,054,500.00

  Aurora Free Library Cayuga 54 123 ADA compliant restroom; window replacements; exterior lighting; basement renovations for additional office space and storage; elevator. $418,000.00
Hazard Library Association 54 123 For an addition to increase library space. $175,000.00
Springport Free Library 54 123 Install energy efficient lighting, sound proof ceiling, replacement of broken wooden stairs and install fire doors. $8,000.00
Stewart B. Lang Memorial Library 49 128 Library addition with either solar or geothermal leating. $300,000.00
Weedsport Free Library 49 128 Install insulation in the attic area; redo front entranceway with replacement of wooden exterior door with metal one to eliminate severe weather issues; renovate parking lot. $29,000.00
Cortland Free Library Cortland 51 125 Restore exterior library building. Install elevator and restore main steps and remove existing ramp. Replace existing entry doors with energy efficient ones. Construct concrete combination sidewalk and sheelstop curb, repave parking area to slope away from building. Modify guardrails, handrails to comply with current codes.  Upgrade fire separations with "c" label fire doors; replace cracked glass floor panels in stacks area, make bathrooms ADA compliant, air condition building, install fire detection and alarm system, install battery backup emergency lighting in building and replace security system. $2,000,000.00
Peck Memorial Library 51 123 Replace and/or restore mortar, foundation,windows, add insulation, heating and air unit, community room, electrical and plumbing… $1,500,000.00
Lodi Whittier Library Seneca 54 129 New construction of a 4,000 square foot building. Current library space is 700 sq. ft. $800,000.00
Waterloo Library and Historical Society 54 129 ADA bathrooms; heating, plumbing and electrical replacements for energy savings. $600,000.00
Apalachin Library Tioga 52 123 Renovate second floor for library office and storage. $100,000.00
Tappan-Spaulding Memorial Library 52 123 Renovate the children's space. $9,500.00
 Finger Lakes Library System   Tompkins 53 125 Renovate an existing building for System Headquarters.  Current lease expires 2010. $2,000,000.00
Groton Public Library 51 125 Update air conditioning $15,000.00
Newfield Public Library 53 125 Build an addition to library. $200,000.00
The Southworth Library Association 51 125 Sorthworth Library is in the beginning stages of requesting RFQs for their large addition. At this time, the amount is just a guestimate. $1,500,000.00
Tompkins County Public Library 53 125 Renovate existing leased space (FLLS) to accommodate growing needs of library. $1,400,000.00

 

System

Library Name

County

Sen. Dist.

Asy. Dist.

Project Description

Amount

System Total

Four County Library System

$25,442,500.00

Broome County Public Library Broome 52 126 replace 18 public access computers; install new flooring in browsing area; replace 12 microfilm machines $90,000.00
Deposit Free Library 52 107 replace roof; construct storage shed $35,000.00
George F. Johnson Memorial Library 52 126 install automatic front door; upstairs meeting room air conditioning and carpeting; remodel 4 bathrooms (one w/disabled access); remodel basement meeting room; add outdoor events sign; replace rooftop HVAC units $239,000.00
Lisle Free Library 52 123 parking lot and driveway; add solar panels; insulate cellar; expansion project; reconfigure space $183,000.00
Mary-Wilcox Memorial Library 52 123 asbestos abatement; construction to fix load-capacity deficiencies; 2nd floor renovation to create meeting room and display area for local history collection; remodel meeting room, renovate bathroom for ADA compliance; add shelf space for juvenile/YA rooms $119,000.00
Nineveh Public Library 52 107 addition; siding; roof; disabled access ramp $100,000.00
Your Home Public Library 52 126 replace / repair concrete walkway and curbs; clean, repoint and seal exterior brickwork; strip, prime and repaint wood trim; repair, restore and glaze windows; install elevator; install central air conditioning; repair and restore front porch $692,000.00
Guernsey Memorial Library Chenango 52 107 new elevator; new carpeting; renovate bathrooms; new children's wing; computer room and new offices $4,300,000.00
Moore Memorial Library 52 107 expand meeting room; expand office space; expand area for adult books and media; expand circulation desk area; expand museum space (with Historical Society); also a 17,460 sq.ft. addition $5,500,000.00
New Berlin Library 52 107 window replacement $8,500.00
Oxford Memorial Library 52 107 addition for community room (w/disabled access); new rear entryway; various energy efficiency upgrades; reinforced framing, improved access; upgrade heating system; upgrade plumbing system, upgrade electrical system; add alarms and security systems; wireless Internet access; improved roof-water control system; replace parking lot and related work; landscaping; new sidewaks and paving; sprinkler system for entire building; hazardous materials identification / abatement $813,000.00
Sherburne Public Library 49 123 major  work on terra cotta tile roof $200,000.00
South New Berlin Free Library 52 107 windows, HVAC, entryway/façade, lighting, bathroom $18,000.00
Bovina Public Library Delaware 42 107 repair front steps; build ramp $10,000.00
Fairview Public Library 42 107 replace vinyl siding, painting $20,000.00
Franklin Free Library 42 127 roof, disabled access, painting $15,000.00
Louis Adelia Read Memorial Library 42 107 expansion project $1,000,000.00
Cherry Valley Memorial Library Otsego 51 117 replace disabled access ramp and walkway; replace interior lighting fixtures; replace storm windows, add disabled access bathroom $75,000.00
Gilbertsville Free Library 51 127 addition; painting; electrical work $75,000.00
Harris Memorial Library 51 127 new roof; renovation to siding and shutters; addition for public computers / technology room $70,000.00
Huntington Memorial Library 51 111 new library building $10,000,000.00
Kinney Memorial Library 51 111 addition $1,000,000.00
Milford Free Library 51 111 expansion project $100,000.00
Village Library of Cooperstown 51 111 new lighting / fixtures $30,000.00
Village Library of Morris 51 127 major addition $750,000.00

 

System

Library Name

County

Sen. Dist.

Asy. Dist.

Project Description

Amount

System Total

Mid-Hudson Library System

$76,175,041.00

  Claverack Free Library Columbia 41 103 Significant expansion; handicapped accessible $1,000,000.00
Hudson Area Association Library 41 103 Extensive renovation of their historic building $8,000,000.00
Kinderhook Memorial Library 41 108 Significant Expansion Project $3,050,000.00
New Lebanon Library 41 108 Expansion Project $80,000.00
Philmont Public Library 41 99 Expansion Project $150,000.00
Roeliff Jansen Community Library (Hillsdale) 41 103 New "green" building $2,000,000.00
Valatie Free Library 41 108 Significant Renovation of new building $190,000.00
Amenia Free Library Dutchess 40 103 Significant Expansion $1,000,000.00
Beekman Library 40 103 Significant Expansion $275,000.00
Greater Poughkeepsie Library District 41 100 Relocation/Expansion $10,200,000.00
Howland Public Library (Beacon) 41 100 Significant Expansion $10,000,000.00
Hyde Park Free Library 41 102 Energy Efficiency & Handicapped Accessibility Projects $80,000.00
Mid-Hudson Library System 41 100 Energy Efficiency Project (incl. solar panels) $500,000.00
Millbrook Free Library 41 103 Energy Efficiency Project $6,000.00
Morton Memorial Library (Rhinecliff) 41 101 Renovation $15,000.00
NorthEast-Millerton Library 40 103 Purchase of Additional Building $250,000.00
Pine Plains Library 40 103 Expansion Project $280,000.00
Pleasant Valley Free Library 41 103 Significant Expansion Project $370,000.00
Red Hook Public Library 41 103 Renovation/Energy Efficiency $380,000.00
Staatsburg Library 41 102 Significant Expansion Project $300,000.00
Stanford Free Library 41 103 New Building $2,000,000.00
Cairo Public Library Greene 51 127 New building $2,000,000.00
Catskill Public Library 51 127 Renovation; handicapped accessible $29,000.00
D.R. Evarts Library (Athens) 51 127 Renovation $44,500.00
Haines Falls Free Library 51 127 Extensive renovation of building  $2,500,000.00
Heermance Memorial Library 51 108 Energy Efficiency Project $15,000.00
Alice Curtis Desmond & Hamilton Fish Library Putnam 40 90 Energy Efficiency Project (incl. geothermal and solar panels) $165,000.00
Kent Public Library 40 90 Energy $80,000.00
Patterson Library 40 99 Expansion Project $3,596,875.00
Putnam Valley Library 40 90 Renovation/Energy Efficiency $100,000.00
Highland Public Library Ulster (see also Ramapo Catskill) 30 100 New building $6,420,000.00
Kingston Library 39 101 Renovation $92,000.00
Marlboro Free Library 39 100 Significant Expansion Project $4,400,000.00
Morton Memorial Library (Pine Hill) 42 101 Renovation $28,000.00
Phoenicia Library 42 101 Significant Expansion Project $900,000.00
Plattekill Library 39 103 New building $4,010,000.00
Rosendale Library 42 101 Significant Expansion Project $2,010,000.00
Saugerties Public Library 42 127 Significant Expansion Project (includes historic building) $958,666.00
Stone Ridge Library 42 101 Significant Expansion Project (includes historic building) $3,500,000.00
Town of Esopus Library 39 101 Energy Efficiency Project: solar panels $200,000.00
Woodstock Public Library District 42 101 Significant Expansion Project $5,000,000.00

 

System

Library Name

County

Sen. Dist.

Asy. Dist.

Project Description

Amount

System Total

Mid-York Library System

$19,445,199.00

  Frankfort Free Library Herkimer 51 117 Wheelchair lift, custom shelving under the windows in children's area, new carpeting throughout upstairs, replace wallpaper where leaks have occurred, paint a portion of the downstairs, repair wallboard and replace carpeting in the downstairs area (water damage), chimney inspected, and water fountain replaced  $100,000
Ilion Free Public Library 51 117 New roof, basement remodeling, convert staff space to public space, purchase property next door for expansion, foundation work, new electrical, and new meeting room, re-point bricks, chimney repair, install energy efficient windows in addition, waterproof basement $664,200
Jordanville Public Library 51 117 New roof, restoration of four columns that support the overhanging roof at the front of the library $50,000
Middleville Free Library 51 117 Wheelchair accessible electronic door, new shelving to better utilize space used for library collections
Weller Library 51 117 Re-plaster Children's Room,restoration of bas relief floral ceiling plaster in Reading Room, masonary repair on vault, energy efficient replace windows, energy efficient HVAC $120,000
Canastota Public Library Madison 49 111 Paint fire escape, remodel staff work room, brick repointing, parking lot resurfacing, remodel public and staff restrooms, lighting upgrades, remodel local history room, replace front doors $80,000
Cazenovia Public Library 49 111 Painting current building, addition $1,100,000
DeRuyter Free Library 49 111 Install 'green' HVAC, install energy efficient windows, new flooring, new wiring, new public and staff restrooms, reconfiguring newly created library space $2,000,000
Hamilton Public library 49 111 Removal of lead based paint  $130,000
Morrisville Public Library 49 111 Upgrades to electrical wiring, new computer equipment, Elevator, new roof, renovations to make all areas accessible to patrons in wheelchairs, upgrades to HVAC system, 30,000 square feet of additional space $1,400,000
New Woodstock Free Library 49 111 20 year project to replace roofs, boilers, repaint interior and exterior, replace carpets, tile and wood floors, repair and replace front entrance and foundation, replace and construct adequate parking space, replace basement windows, install additional insulation, reline the chimney, and refinish wood floors $400,000
Oneida Public Library 49 111 New Building, Security system $3,020,000
Sullivan Free Library-Bridgeport   49 111 Addition $250,000
Sullivan Free Library-Chittenango   49 111 Replace 4 HVAC units which are beyond serviceable life  $75,000
C.W. Clark Memorial Library Oneida 49 111 Addition, parking improvements, convert basement into usable space, construction of a 1,100 square foot 2 story addition to existing library; purchase of new shelving $403,008
Dunham Public Library 47 116 Automatic doors, upgrade HVAC system $9,000
Jervis Public Library 47 116 Chimney repair, drive through window, addition, install energy efficient windows in historic part of building, install secure and energy efficient staff entrance, cupola restoration, install photovoltaic electric generator, install energy efficient lighting, install 2 variable pumps on boiler, roofline and roof vent insulation $747,840
Mid-York Library System Headquarters 47 116 Ongoing initiative to make facility "green" over the next 10 years $3,000,000
Oriskany Public Library 47 116 New roof, canopy for front entrance $48,000
Utica Public Library 47 111 New Children's room; new elevator, building repairs including:  clean & repoint the exterior of the building, resurfacing the parking lot, gutter and roofing work. $5,503,151
Waterville Public Library 49 111 Photovoltaic electricity generation equipment retrofit, 35 kw, combination rooftop and post mounted with system controls $315,000
Western Town Library 47 115 Replace HVAC, insulate building, and weatherize windows $30,000

 

System

Library Name

County

Sen. Dist.

Asy. Dist.

Project Description

Amount

System Total

Mohawk Valley Library System

$14,163,731.00

  Gloversville Public Library Fulton 44 117 New windows - $500,000
Elevator - $250,000
New HVAC - $900,000
Renovate basement for public use - $700,000
New roof - $150,000
Installation of energy saving measures such as photovoltaic, light and water harvesting - $250,000

$2,500,250
Johnstown Public Library 44 117 Addition for new teen/children's room, additional adult shelving, new community room

$2,500,000

Northville Public Library 44 117 New roof --insulation of roof/ceiling/rafters $75,000
Fort Plain Free Library Montgomery 44 105 Renovation and addition to middle section of library to enable the establishment of a new children's room and YA area.  $825,000
Margaret Reaney Memorial Library 44 117 Renovations to make all areas of the library accessible to patrons in wheelchairs $75,000
Mohawk Valley Library System Schenectady 44 105 Replacement of the garage doors, back door and insulation in garage area which will be used for sorting delivery. $50,000
Schenectady County Public Library - Central Library 44 105 Major expansion project (includes doubling the area for youth services, increasing the amount of meeting and tutoring space, constructing an ADA-compliant restroom, expanding collection space- approximately 11,000 sq. ft) $8,138,481
Schenectady County Public Library - Duane 44 105 New roof $200,000
Schenectady County Public Library - Mont Pleasant 44 105 New roof $200,000
Schenectady County Public Library - Quaker Street 44 105 Renovation of library building $2,000,000
Sharon Springs Free Library Schoharie 51 127 New roof; exterior lighting for parking lot; expansion of parking lot $25,000
The Community Library 51 127 Roof replacement $75,000

 

System

Library Name

County

Sen. Dist.

Asy. Dist.

Project Description

Amount

System Total

Monroe County Library System

$63,313,000.00

  Brighton Memorial Library Monroe 56 132 Additional space for a separate story hour room, additional meeting/program space, expanded teen area, additional space for Internet use, additional staff space $2,000,000
Chili Public Library 62 133 8,000 sq. ft. addition  $3,400,000
Fairport Public Library 55 135 New facility $12,000,000
Gates Public Library 62 133 Addition, new lighting, additional parking, upgrades to HVAC system $6,600,000
Greece Public Library 56 134 Addition to the Children's Room  $500,000
Irondequoit Public Library-Evan Branch  55 132 New consolidated facility $12,000,000
Ogden Farmers' Library 62 134 Interior updates; addition $2,200,000
Parma Public Library 56 139 New 22,000 sq ft facility.  $6,000,000
Rochester Public Library 56 133 Foundation repair ($8 million), Urban Park ($3 million) Exterior Lighting ($250,000) $11,250,000
Rochester Public Library - Charlotte Branch 56 132 Roof and exterior repair $110,000
Rochester Public Library - Highland Branch 56 131 Addition $400,000
Rochester Public Library - Lincoln Branch 56 133 Interior updates $25,000
Rochester Public Library - Lyell Branch 62 131 Signage and exterior repair $25,000
Rochester Public Library - Maplewood Branch 55 132 Replacement Windows and exterior repair $178,000
Rochester Public Library - Monroe Branch 56 131 Interior updates $25,000
Rochester Public Library - Phyllis Wheatley Branch 56 133 Teen Center ($100,000) parapet repair ($35,000) IN PROGRESS $135,000
Rochester Public Library - Winton Branch 55 132 Expanded parking area $300,000
Scottsville Free Library 55 131 Restoration/renovation of children's area, repairs to foundation and wood support $40,000
Seymour Library 62 134 Roof replacement $125,000
  Town of Mendon Public Library 55 130 New facility (current facility's restroom, meeting room, and part of collection is not wheelchair accessible) IN PROGRESS $6,000,000  

 

System

Library Name

County

Sen. Dist.

Asy. Dist.

Project Description

Amount

System Total

Nassau Library System

$104,773,100.00

Baldwin Public Library Nassau 9 14 Sidewalk and railings rehabilitation ($20,000); Expanded and enhanced YA room ($300,000) $320,000
Bayville Free Library 5 113 1,750 sq ft addition and extensive renovations to the 2nd floor of the existing library  $698,000
Bellmore Memorial Library 8 19 Replace roof ($250,000); Replace carpeting ($75,000); New energy-effiecient HVAC ($250,000); Repair windows and walls ($75,000); Replace wallpaper ($25,000); Paint interior ($15,000); New shelving ($25,000) $715,000
Bethpage Public Library 5 15 New roof ($300,000); Solar panels ($300,000); New carpeting in auditorium($150,000); Replace brick in  exterior garden ($50,000)  $800,000
Bryant Public Library 5 15 Upgrade or install a new HVAC system; Replace telephone system; Convert small room into office space; Implement RFID  $1,000,000
East Meadow Public Library 6 15 Replace front and delivery doors ($82,000); Add energy management system to lower energy costs ($100,000); Upgrade security system ($130,000); Resurface parking and improve drainage ($40,000); Replace 1 air conditioner ($50,000); Renovate circulation desk ($30,000); New signage throughout ($25,000); Replace tile floor & carpeting ($34,000); Replace windows ($48,000); Replace wallpaper ($50,000); Add programming space ($2,000,000) $2,589,000
East Rockaway Public Library 9 20 Replace all library carpeting ($88,000); Replace the Main Street facade including windows ($180,000); Upgrade circulation desk ($45,000) $313,000
East Williston Public Library 7 17 500 square foot addition; new elevator; ADA compliant restrooms; updating of electrical and heating systems; install central air conditioning; improve lighting; replace windows; renovate the circulation desk; replace carpeting.    $745,000
Farmingdale Public Library 6 12 Renovation of five bathrooms to make fully ADA-compliant. Creation of a family bathroom for parents with children and/or seniors with aides.  Renovation of interior building spaces to create a teen area, reading room, computer area, AV listening/collection area, and expansion of children's library to accommodate growing collections and additional computers. Update lower level meeting rooms with energy-efficient lighting and dimming controls. $1,500,000
Floral Park Public Library 7 21 Renovations to make all areas of the library accessible to those in wheelchairs (including entrance and restrooms), new windows, new doors, additional shelving and additional space for public access computers, plus parking improvements.  $2,000,000
Franklin Square Public Library 7 21 Electronic entrance doors and new roof overhang over the entrance $35,000
Freeport Memorial Library 8 19 EAST BLDG: new roof ($250,000); new ceiling and lighting ($287,000); replace sink and cabinet in Room #4 ($2,400); replace meeting room doors & accordian divider ($41,000); replace floor outside of Technical Svs ($17,100); renovate storage room  & add compact shelving ($226,500); renovate Room #6 ($100,000).  WEST BLDG: new boiler ($300,000); reconfigure main floor and create a Teen Center ($496,000); replace steel exit door ($2,200); new carpet ($137,000); add a bathroom on lower level ($47,200).  BOTH BLDGS: Exterior restoration & painting ($175,000); Interior painting ($118,000); Renovate 9 bathrooms and make fully ADA-compliant ($376,400) $2,575,800
Garden City Public Library 7 17 Generator and new HVAC chillers   $819,800
Gold Coast Public Library 5 15 Although the Library Board has just begun a long-range planning process, there is general agreement about the need to provide additional space for the growth of the collection, as well the provision of meeting room space for community groups and library programs.  This could mean expanding the present facility, building a new facility, or leasing and outfitting a second facility.  Cost estimates vary depending on the option selected.
$5,000,000
Great Neck Library 7 16 Expansion and renovation including a new roof and new HVAC $15,000,000
Hempstead Public Library 6 18 Expansion and major renovation of existing library $15,000,000
Hewlett-Woodmere Public Library 9 14 Replace approx. 27,000 sq ft of roof ($275,000); energy-efficient lighting ($50,000); HVAC upgrade ($75,000);  New carpeting ($115,000) $515,000
Hicksville Public Library 9 20 Considering a major renovation $4,500,000
Hillside Public Library 5 15 Renovate parking lot  $145,500
Island Park Public Library 7 17 Solar panels  $75,000
Island Trees Public Library 9 20 Upgrade electrical panel ($3,000); Replace drain pipe ($5,000) $8,000
Jericho Public Library 6 19 Renovate the existing first and second floors and construct additions to both floors.  The renovated and expanded first floor will allow for an additional meeting room, a children's program room, a café, a redesigned circulation desk, more storage space and require the re-location of Technical Services.  The renovated and expanded second floor will allow a new AV area, a new book area with seating, a redesigned  Reference Area, a new YA area and additional staff work area.    $6,000,000
Lakeview Public Library 5 13 Security (Video Surveilance) System and Materials Protection System.  Demolition and re-configuration of the 5,000 sq ft on the second floor and the 13,000 sq ft third floor which are not currently usable. $1,050,000
Levittown Public Library 6 18 Renovate Adult Services area; add a rest room, replace lighting and ceiling ($1.4 million); asbestos abatement ($55,000); new air handler ($75,000);  replace 32,000 sq. ft. roof ($325,000) $1,855,000
Locust Valley Library 6 19 2,400 sq ft addition; create additional 34 parking spaces.     $2,100,000
Long Beach Public Library 5 15 Re-carpet entire library ($625,000).  Acquire property and construct additional space for a teen area with programming space, an expanded children's area, additional meeting room  space, separate group work space and individual quiet use space, more computers and additional shelving ($9.5 million). $10,125,000
Lynbrook Public Library 9 20 Roof replacement; HVAC replacement and upgrade; Energy-efficient lighting; Rehabilitation of the parking lot $600,000
Malverne Public Library 9 14 Upgrade HVAC and wireless sound system  $50,000
Massapequa Public Library 9 14 Add new entrance to building from parking lot. $150,000
Merrick Library 6 12 Split up one of the existing group study rooms into two smaller rooms, each accommodating 2 people at a time ($10,000);  Energy-efficient, 'green' lighting in the Children's Room ($10,000)   $20,000
Nassau Library System 8 17 Repair/repoint an exterior wall ($22,500); New front entrance with automatic doors ($25,000); Renovate and make fully ADA-compliant 3 restrooms ($75,000); Renovate a 4th bathroom ($20,000); Interior renovations to create a self-contained meeting room / training center 'wing' with public access when the rest of the building is closed ($800,000) $942,500
North Bellmore Public Library 6 18 Renovate two public restrooms ($30,000); Renovate and make ADA-compliant a staff restroom ($12,000);  New carpeting ($30,000); Replace part of roof ($25,000) $97,000
North Merrick Public Library 8 19 New HVAC system; new lighting; new windows; new roof; renovations to make restrooms accessible by the disabled; upgrades to plumbing; new electrical wiring; new circ desk; new carpeting; 2,500 sq ft addition; new phone system; new materials theft prevention system.   $5,500,000
Oceanside Library 8 17 Reconfiguration of downstairs storage area into usable space for the public including 2 meeting rooms ($750,000);  Additional lighting & HVAC ductwork ($300,000);  New carpet tiles to cover poured concrete floor ($50,000)  $1,100,000
Peninsula Public Library 9 20 Replace HVAC system and concrete walkways around library  $370,000
Plainedge Public Library 9 20 New roof ($423,500); Solar panels ($308,000); Video surveillance system for lower level ($10,000) $741,500
Plainview-Old Bethpage Public Library 6 12 Interior surveillance system ($10,000); Lighting upgrade ($10,000); New loading dock ($35,000) $55,000
Port Washington Public Library 6 13 Two new elevations ($180,000); New roof ($600,000); Replace carpeting ($100,000); Interior renovations & re-purposing of renovated space ($80,000); Additional exhaust shaft for better ventilation ($8,000); Solar panels ($42,500) $1,010,500
Rockville Centre Public Library 7 16 Upgrade lighting and ceiling replacement ($525,000); Window replacement ($134,000); Expand rear entry (no cost estimate)  $659,000
Roosevelt Public Library 9 14 A 20,000 sq ft addition and renovation of existing 9,800 sq ft building   $8,400,000
Sea Cliff Village Library 8 18 Repace stained glass windows $15,000); Renovate Children's Library including ceiling, new HVAC, windows, lighting and carpeting ($300,000) $315,000
Seaford Public Library 5 13 HVAC upgrade ($90,000); Renovate restrooms ($40,000); Video surveillance system for outside the building (no cost estimate); New carpeting (no cost estimate) $130,000
Shelter Rock Public Library 8 19 A 1,000 sq. ft. addition and a major renovation of library including: making all areas more accessible, usable and comforatable; new and larger restrooms; improved lighting, improved wiring for technology; more comfortable seating; a re-designed and enhanced meeting/multi-purpose room; improved public service desks, a new loading dock; a new HVAC system; and improved staff work areas.  $7,460,000
Uniondale Public Library 7 16 Renovation of 4 restrooms $64,000
Valley Stream Public Library 6 17 Enclose exterior patio to create a quiet study area of approximately 3,000 square feet ($400,000); Redo the main and children's room entrances ($100,000); Replace HVAC (no cost estimate); Interior renovations for new projections system for programs ($10,000)  $510,000
Wantagh Public Library 8 19 Renovate bathrooms; New roof $800,000
West Hempstead Public Library 6 18 Additional lighting ($19,500); Install HVAC and additional lighting in basement ($60,000). The basement (currently used for storage) was left unfinished with no climate control when new library was constructed in 2007. $79,500
Westbury Public Library 7 15 New roof and solar panels $235,000

 

System

Library Name

County

Sen. Dist.

Asy. Dist.

Project Description

Amount

System Total

New York Public Library

$432,031,320.00

  Allerton Branch Bronx 34 80 Partial renovation $5,146,200.00
Belmont Branch 34 78 Partial Renovation $7,268,588.00
Bronx - various Various Various Borough Wide- Security Systems $2,050,000.00
City Island Branch 34 82 HVAC and fence replacement $700,000.00
Clason's Point Branch 32 85 Stabilize back wall façade and related interior work $450,000.00
Eastchester Branch 34 83 Full interior renovation $4,489,938.00
Edenwald Branch 36 83 Partial renovation $2,906,243.00
Francis Martin Branch 28 86 Partial renovation $3,774,150.00
Grand Concourse Branch 33 86 Partial renovation $7,593,750.00
High Bridge Branch 28 77 Furniture and Equipment $250,000.00
Hunt's Point Branch 32 85 Full interior renovation $7,738,290.00
Kingsbridge Branch 31 81 Library Materials $500,000.00
Melrose Branch 36 79 Full interior and exterior renovation $4,707,000.00
Mosholu Branch 33 80 Partial window replacement (staff room), ejector pump, new roof $825,000.00
Mott Haven Branch 28 84 Security System $150,000.00
Parkchester Branch 32 76 Replace Automated Interior and Exterior Doors (ADA Compliance) $300,000.00
Pelham Bay Branch 34 82 Full interior renovation $4,260,000.00
Riverdale Branch 34 81 Partial renovation $3,375,000.00
Soundview Branch 32 85 Partial renovation $3,731,049.00
Soundview Branch 32 85 Existing Project - Supplemental Budget Request $150,000.00
Spuyten Duyvil Branch 31 81 Full interior renovation $4,326,210.00
Spuyten Duyvil Branch 31 81 Branch expansion $4,875,000.00
Throg's Neck Branch 34 82 Full interior renovation $5,045,328.00
Tremont Branch 33 79 New Boiler, Roof, and Security System $1,085,000.00
Van Cortlandt Branch 33 80 Acquisition $1,000,000.00
Van Cortlandt Branch 33 80 Partial interior renovation $1,022,198.00
Van Nest Branch 32 80 Full interior renovation $4,844,700.00
Wakefield Branch 36 83 Full interior renovation $6,697,040.00
West Farms Branch 33 76 Partial renovation $6,010,331.00
Westchester Square Branch 34 82 Full interior and exterior renovation $9,378,720.00
125th Street New York 30 68 Full interior and exterior renovation $8,255,657.00
58th Street 26 73 Partial renovation $2,170,800.00
67th Street 26 65 Systems replacement, masonry restoration $1,445,000.00
96th Street 28 68 Full interior and exterior renovation $8,169,000.00
Aguilar Branch 48 122 Partial renovation $2,283,402.00
Andrew Heiskell Braille & Talking Book Library 26 75 New boiler and controls $1,600,000.00
Bloomingdale Branch 30 69 Partial renovation $8,315,448.00
Chatham Square Branch 25 64 Exterior Restoration, HVAC Replacement, ADA Compliance and Security System $2,175,000.00
Countee Cullen Branch 30 70 Partial renovation $7,605,000.00
Epiphany Branch 26 74 Full interior and exterior renovation $7,586,400.00
Fort Washington Branch 31 72 Full interior and exterior renovation $8,326,800.00
George Bruce Branch 30 69 Exterior rehabilitation, security, roof, boiler and Security System $2,175,000.00
Hamilton Fish Park Branch 25 64 Partial renovation, Systems Upgrade and Install Security System $4,745,160.00
Hamilton Grange Branch 30 70 Partial renovation $3,933,978.00
Hudson Park Branch 29 66 Full interior and exterior renovation $7,546,959.00
Inwood Branch 31 72 HVAC Replacement, Elevator Upgrade and Security System $2,425,000.00
Jefferson Market Branch 29 66 Replace MEP systems and interior renovation $13,980,000.00
Kips Bay Branch 26 75 Full interior and exterior renovation $5,189,760.00
Library Services Center 12 37 Required Appropriation $5,000,000.00
Macomb's Bridge Branch 30 71 Acquire Site and New Branch Construction $10,000,000.00
Manhattan - various Various Various Technology infrastructure upgrade $2,880,000.00
Manhattan- various Various Various Borough Wide- Security Systems $2,225,000.00
Manhattan- various Various Various Existing Project- Supplemental Budget Request $800,000.00
Mid-Manhattan Library 26 75 Interior and Exterior Renovation $47,962,800.00
Muhlenberg Branch 29 75 Partial renovation $3,283,586.00
New Amsterdam Branch 25 66 Partial renovation $4,599,000.00
New York Public Library for the Performing Arts 29 67 Replace building systems $765,000.00
New York Public Library for the Performing Arts 29 67 Safety and security $2,900,000.00
New York Public Library for the Performing Arts 29 67 Exterior rehabilitation, masonry and water proofing $2,600,000.00
New York Public Library for the Performing Arts 29 67 Renovate interior spaces $3,280,000.00
Ottendorfer Branch 29 66 ADA Compliance, Exterior Restoration and Security System $1,917,000.00
Roosevelt Island Branch 28 65 Roosevelt Island - New branch construction $10,000,000.00
Schomburg Center for Research in Black Culture 30 70 Phase II renovations $6,470,000.00
Science, Industry, and Business Library (SIBL) 26 75 Renovate Select Spaces/Systems $1,800,000.00
Seward Park Branch 25 64 Sidewalk Vault Rehabilitation and Security System $323,000.00
Stephen A. Schwarzman Building 26 75 Renovation of interior spaces $20,250,000.00
Stephen A. Schwarzman Building 26 75 Technology replacement and technology infrastructure improvements $1,250,000.00
Stephen A. Schwarzman Building 26 75 Systems replacement, freight elevator, sidewalk vault $29,242,000.00
Tompkins Square Branch 25 74 Exterior Rehabilitation, Systems Upgrade, and Security System $2,125,000.00
Washington Heights Branch 30 71 Full interior renovation $7,479,186.00
Yorkville Branch 26 73 Full interior and exterior renovation $9,495,360.00
Dongan Hills Branch Richmond 24 62 Full Interior and Exterior Renovation $3,937,500.00
Great Kills Branch 24 62 Repoint Façade $500,000.00
Hugenot Park Branch 24 62 Full interior renovation $3,274,740.00
Port Richmond Branch 23 61 Full Interior Renovation $4,950,225.00
Richmondtown Branch 24 62 Partial Renovation $4,200,000.00
Rossville Branch Library n/a n/a Proposed new branch construction $8,366,000.00
St. George Library 23 61 Full interior and exterior renovation $15,070,176.00
Stapleton Branch 23 61 Furniture, equipment and library materials $500,000.00
Staten Island - various Various Various Technology infrastructure upgrade $1,040,000.00
Staten Island- various Various Various Borough Wide- Security Systems $750,000.00
Todt Hill- Westerleigh Branch 24 63 Partial Renovation $5,004,048.00
Tottenville Branch 24 62 New Roof, Plaza Rehabilitation, Lighting, Fence and Security System $1,226,000.00
West New Brighton Branch 23 61 Full interior renovation $3,987,600.00

 

System

Library Name

County

Sen. Dist.

Asy. Dist.

Project Description

Amount

System Total

Nioga Library System

$7,212,683.00

Corfu Free Library Genesee 61 139 Interior finishing on Phase III of new addition $35,000.00
Haxton Memorial Library 61 139 Window replacement for greater energy efficiency - this project is currently being undertaken in different phases due to lack of funds $78,000.00
Pavilion Public Library 61 147 building expansion for new children's room $105,000.00
Richmond Memorial Library 61 139 New ground floor exit from the children's room, including outside site work $45,000.00
LeRoy-Woodward Memorial Library 61 139 Central air conditioning throughout library building and energy efficient window coverings. $110,692.00
Barker Free Library Niagara 62 139 Interior and exterior rehabilitation $19,550.00
Lewiston Public Library 62 138 Energy efficient doors and window films; motion sensor lighting $19,400.00
Lockport Public Library 62 142 Lighting and replacement of HVAC units based on recommendations made by NYSERDA $40,000.00
Middleport Public Library 62 142 Interior rennovations $28,000.00
Newfane Free Library 62 138 Interior Rennovations $10,000.00
Niagara Falls Public Library 62 138 Roof repair and resurfacing; drywall replacement and interior finishing $80,000.00
Niagara Falls Public Library-LaSalle Branch 60 138 Restoration of second floor $30,00
Nioga Library System 62 138 Replace three air conditioning units, roof replacement; installation of eight wind turbines; addition to house computer equipment; parking lot renovation; repairs to exterior of original building; handicap accessible entrance $852,400.00
North Tonawanda Public Library 62 140 Replacement of existing furnace and air conditioning units $10,500.00
Ransomville Free Library 62 138 Library addition and new building construction for storage of historical items $50,000.00
Sanborn-Pekin Free Library 62 138 Interior rennovations and new meeting room $250,000.00
Wilson Free Library 62 138 Roof replacement; installation of new drainage system; replacement of concrete flooring $70,250.00
Youngstown Free Library  62 138 Building expansion $451,000.00
Community Free Library Orleans 62 139  Reconfiguration of old space $28,000.00
Lee-Whedon Memorial Library 62 139 Property acquisition and building expansion $920,000.00
  Swan Library 62 139 Site acquisition and new library building $4,000,000.00
  Yates Community Free Library 62 139 Parking lot expansion $9,891.00

 

System

Library Name

County

Sen. Dist.

Asy. Dist.

Project Description

Amount

System Total

North Country Library System

$8,140,900.00

  Adams Center Free Library Jefferson 48 122 Carpeting, shelves, renovate children's room, addition to the library, land acquisition $310,000.00
Adams Free Library 48 122 New building $150,000.00
Bodman Memorial Library (PHI) 48 118 New walkway/sidewalk to parking area, handicap ramp(s), renovate upstairs to expand usable space, new heating system, retooling the foundation, new flooring and carpeting throughout, new electrical, renovations to make all areas of the library accessible to patrons in wheelchairs (including restroom) $80,000.00
Cape Vincent Community Library 48 118 Replacement of roof; renovations to make front entrance handicap accessible, convert deck are into usable space, new electrical to office and storeroom $117,000.00
Carthage Free Library 48 122 Renovations to make all areas of the library accessible to patrons in wheelchairs (including restroom), elevator, improvements to parking, addition for community meeting room, additional storage and computer space $900,000.00
Crosby Public Library (ANT) 48 118 New windows, new lighting, resurface the floor, install a lift, replace the sidewalk and steps, wheelchair accessible bathroom, renovation of basement $25,000.00
Dexter Free Library 48 118 Paved 50 foot driveway, 12 vehicle parking lot, new carpets, new furniture $80,000.00
East Hounsfield Free Library 48 118 New siding, wheelchair ramp, renovations to make all areas of the library accessible to patrons in wheelchairs (including restroom), meeting/reading room, additional dry storage space $100,000.00
Hawn Memorial Library (CLA) 48 118 Install a second bathroom, new roof (or lean-to awning) $25,000.00
Lyme Free Library (CHA) 48 118 Addition, elevator, additional space for children's area, renovations to make all areas of the library accessible to patrons in wheelchairs $280,000.00
North Country Library System 48 124 Expand garage, emergency generator $100,000.00
Philomathean Free Library (BEL) 48 122 New roof, new windows, new floor for upstairs, new front doors, handicap ramps and bathroom, new lighting and electrical, renovate parking area, install (3) AC units, new carpeting throughout library $100,000.00
Roswell P. Flower Memorial Library 48 118 New Roof and renovation of existing space to make a handicap accessible Book Store $100,000.00
Sally Ploof Hunter Memorial Library (BLR) 48 122 Addition for meeting room $150,000.00
Theresa Free Library 48 118 New furnace $5,000.00
Constableville Village Library Lewis 47 122 Renovations to make all areas of the library accessible to patrons in wheelchairs , renovation of the attic to house historical materials collection, new floor in basement, renovations to exterior of the library $25,000.00
Croghan Free Library 47 122 New roof, carpet, painting, lighting,  stucco work on exterior, addition for computer room, new emergency exits $135,000.00
Harrisville Free Library 47 122 Remodel upstairs, painting outside of building, new doors on back, replace carpet, new roof on back, insulate attic, new bathroom, install a railing to the basement $40,000.00
Lowville Free Library 47 122 Tuck-point brick exterior, painting trim and doors, replace roof, new steps, water drainage issues $100,000.00
Lyons Fall Library 47 122 New ceiling $10,000.00
Osceola Public Library 47 115 Renovations to make all areas of the library accessible to patrons in wheelchairs, plumbing  $50,000.00
Port Leydon Community Library 47 122 Addition $150,000.00
William H. Bush Memorial Library (MAR) 47 122 Addition, new roof, window treatments, new carpeting, energy efficient lighting, furnace/heating upgrades, and painting $150,000.00
Annie P.  Ainsworth Memorial Library (SCR) Oswego 48 122 solar panel/insulation $9,900.00
Central Square Library 48 115 New windows and doors $12,000.00
Cogswell Free Library (ORW) 48 122 New carpet and windows $50,000.00
Fulton Public Library 48 124 River-level basement finished off for community room, brick and stone work, new addition, new flooring, new windows $540,000.00
Hannibal Free Library 48 128 Central air with dehumidifier, renovations of interior to convert storage space into Genealogy Center, addition or expand library into other side of building, new windows and doors, parking $600,000.00
Mexico Public Library 48 124 New roof,  new furniture, new equipment, additional space for public access computers, second bathroom/handicap bathroom, new windows, renovations to the Community Room $240,000.00
Williamstown Library 48 115 Addition $125,000.00
Hammond Free Library St. Lawrence 48 118 Extensive renovations to basement of existing library to make space usable; replacement of roof; construction of exterior ramp to comply with ADA specifications; replacement of hot water heater $90,000.00
Hepburn Library of Colton 47 122 Restoring cornice, restoring columns, renovating upstairs bathroom $77,000.00
Hepburn Library of Edwards 48 122 Renovations to make all areas of the library accessible to patrons in wheelchairs (including restroom) $100,000.00
Hepburn Library of Hermon 48 122 New lighting, new electrical, create storage area in attic $100,000.00
Hepburn Library of Lisbon 48 118 Renovations to make all areas of the library accessible to patrons in wheelchairs (including restroom), new windows $140,000.00
Hepburn Library of Madrid 48 122 Mason work to exterior of building, renovations to make all areas of the library accessible to patrons in wheelchairs, energy efficiency, drainage issues $500,000.00
Hepburn Library of Norfolk 47 122 Renovations to make restroom wheelchair accessible, Renovating downstairs of library to make into usable shelving area/learning center and meeting room with efficiency kitchen, Restructuring new space upstairs into a Reading Center/Coffee Center $85,000.00
Hepburn Library of Waddington 48 118 Upgrades to air conditioning system,  replace radiators with baseboard heat, updating library interior $100,000.00
Heuvelton Free Library 48 122 New building (to allow for handicap accessibility) $1,000,000.00
Hopkinton Reading Center     New building $150,000.00
Massena Public Library 47 118 Renovation of the staff workroom  $35,000.00
Morley Library 47 118 Replacement of roof, windows and doors to increase energy-efficiency/energy conservation $30,000.00
Morristown Public Library 48 118 Convert attic to usable space $200,000.00
Ogdensburg Public Library 48 118 New elevator, new windows, new roof, new flooring, upgrades to electric and plumbing, new fire/security system, renovations to make all areas of the library accessible to patrons in wheelchairs, insulation, parking improvements $440,000.00
Potsdam Public Library 47 118 Installation of elevator in existing elevator shaft and additional floor stops; renovations to install ramps, walkways, fire doors, and walls to provide access to the second and third floors of the library $185,000.00
Reading Room Association of Gouverneur 48 122 New ceiling, new lights $30,000.00
Richville Free Library 48 122 Solar heat for addition, new porch, new exit $100,000.00

 

System

Library Name

County

Sen. Dist.

Asy. Dist.

Project Description

Amount

System Total

Onondaga County Public Library

$22,855,132.00

  Baldwinsville Public Library Onondaga 50 124 2010 - Purchase and installation of solar/wind renewable energy systems based upon 2009 NYSERDA design study recommendation ($300,000) 2011 - Purchase and installation of geothermal renewable energy system based upon 2009 NYSERDA design study recommendation ($500,000) 2012 - Purchase/lease of adjacent land and construction of parking lot ($350,000) 2013 - Expansion of library into basement level ($1,500,000) 2014 - Purchase of reconfigurable auditorium for basement level ($300,000) $2,950,000.00
Beauchamp Branch Library 49 119 Replace doors for ADA compliance; ADA compliant restrooms;  energy efficient windows; new roof; Replace inefficient light fixtures; secondary exit  $628,708.00
Betts Branch 50 120 Fire alarm system; energy efficient lighting; energy efficient windows; replace heating and AC  $418,161.00
Central Library 49 120 Roof; Sorting room expansion; replace compact shelving; Level 5 HVAC; renovate restroom; Improve restroom accessibility; carpet; new exterior and interior signage; relocate bookdrop to inside; renovate street level entrance $603,013.00
Dewitt Community Library 49 119 New facility, including purchase of land $5,000,000.00
Fayetteville Free Library 49 121 Extend front porch, Install ADA compliant automatic doors at both front entrances, Continue development of existing unused interior spaces, parking lot expansion and repair $1,500,000.00
Hazard Branch Library 50 120 ADA compliant restrooms; ADA compliant elevator; ADA compliant lift in mezzanine; fire alarm system; roof; energy efficient lighting; energy efficient windows; HVAC, heating and AC $784,233.00
LaFayette Public Library 50 121 building expansion $300,000.00
Liverpool Public Library 50 119 Addition, thermal windows, interior ceiling tiles, electrical and plumbing upgrades, meeting room renovation $2,500,000.00
Maxwell Memorial Library 50 124 upgraded furnace ($12,000); upgraded lighting ($8,700); analysis of space efficiency and use ($8,000) $28,700.00
Mundy Branch Library 50 120 fire alarm system and site lighting; roof; energy efficient lighting $239,401.00
Paine Branch Library 50 120 fire alarm system; ADA compliant restrooms; roof; energy efficient lighting; energy efficient windows; replace heating and AC; wiring $349,865.00
Petit Branch Library 49 119 Replace doors for ADA compliance; ADA compliant restrooms; roof; energy efficient lighting; energy efficient windows; replace heating and AC; fire alarm system, wiring $372,329.00
Solvay Public Library 50 120 energy efficient window treatments (solar shades); energy efficient windows; attic insulation; geothermal energy                                                        $250,000.00
Soule Branch Library 49 119 ADA compliant elevator; ADA compliant lift; roof; energy efficient lighting; energy efficient windows; fire alarm system; wiring $540,076.00
White Branch Library 50 120 ADA compliant restrooms; ADA compliant elevator; fire alarm system; energy efficient lighting; dry well; replace heating (boiler and piping); wiring $564,541.00

 

System

Library Name

County

Sen. Dist.

Asy. Dist.

Project Description

Amount

System Total

Pioneer Library System

$32,157,795.00

   Avon Free Library  Livingston 59 147  Renovate the old kitchen into a workroom. Improved lighting  $38,000.00
 Bell Memorial Library  57 147  Furnace, windows, doors, parking   $40,000.00
 Caledonia Library Association  59 147  Addition (includes additional meeting space, additional space for public access computers), new wiring for electrical equipment and telecommunications, renovations to make all areas of the library accessible to patrons in wheelchairs (including restroom)   $500,000.00
 Dansville Public Library   57 147  New addition (including additional meeting room space, study/reading area, additional space for public access computers) .   Renovations to existing building including new windows, column repair, remodeling and refurbishing for re-use of historic National Register building for children's collection and services; including story stage area, smaller meeting rooms. Electrical upgrades. Installation of elevator. New construction will be joined to historic building at the first floor level.   $3,250,000.00
 Lima Public Library  59 147   New Community Room expansion requires equipment for 50 chairs and a chair storage cart, locking bookcase, movable folding displays and 2 tables, 8 wireless laptops, PC projector, video/sound recording equipment, PC projector, and gamining package. If space permits, a counter, sink, faucet and base cabinet for beverage area  $22,000.00
 Livonia Public Library  59 130  HVAC upgrades and renovations to existing building, new addition  Adding to the current project description is a need for an elevator, ADA accessible bathroom, energy efficient windows and HVAC system, and the purchasing of the adjacent property for the anticipated addition.   $3,000,000.00
 Mount Morris Library  57 147  Site acquisition, new parking, new addition, improved accessibility, renovation of current space  $550,000.00
 Wadsworth Library  59 147  Replace lighting in 1995 addition with more energy efficient fixtures. Install elevator.  $200,000.00
 Bloomfield Public Library  Ontario 59 130  Install ramp to sidewalk from handicapped parking space. Additional meeting space. New roof. Additional space for public access computers. Replace carpeting. Renovations  to parking lot  $90,000.00
 Bristol Library  59 129  Upgrade electrical service, replacement windows and front door, ADA compliant shelving, replace carpeting.  $29,795.00
 Clifton Springs Library  54 129 Additional space to accommodate 10 year growth of the collection, additional public access computer space   $90,000.00
 Geneva Public Library  54 129  Cooling tower, café and reading room construction, energy audit & HVAC upgrades,heat pump replacements--may be annual need, storm windows, interior & exterior painting, entrance renovations, bathroom addition, carpet replacement; addition of mobile branch (bookmobile)*  $300,000.00
 Honeoye Public Library  59 130  New roof, replace front entryway stairs, renovation of room on lower level, new lighting on lower level, restroom/kitchen on lower level, lighting & parking behind the building, renovation of entryway to lower level, window replacement on main level.  $100,000.00
 Naples Library  59 130  New roof, exterior renovation, new carpeting  $30,000.00
 Phelps Community Memorial Library  54 129  Update 1950s plumbing & fixtures  $10,000.00
 Pioneer Library System  61 139  Interior renovations  $15,000.00
 Red Jacket Community Library  54 129 Purchase of a new facility (commercial real estate) and furnishings.  $5,000,000.00
 Victor Free Library  54 130  Replace HVAC to increase energy efficiency and distribution. Upgrade lighting. Replace restroom fixtures. Increase space for public access computers.  $100,000.00
 Wood Library Association  59 129  Addition (including additional meeting space and additional space for public access computers, creation of teen area and enlarging of Children's library), renovations to make all areas of the library accessible to patrons in wheelchairs including new handicapped accessible elevator.   $5,000,000.00
 Clyde-Savannah Public Library  Wayne 54 128  Improved lighting   $15,000.00
 Lyons Public Library  54 128  While the library moved into a new/renovated facility in 2008, it still needs an elevator to make the basement (future expansion space) handicapped accessible.  $70,000.00
 Macedon Public Library  54 128  Putting an addition onto the present facility  $500,000.00
 Marion Public Library  54 128  New outdoor lighting, additional space for public access computers  $20,000.00
 Newark Public Library  54 128  Roof, elevator, renovation to expand teen & children's areas   $183,000.00
 Ontario Public Library  54 128  New facility  $5,000,000.00
 Palmyra Kings Daughters Free Library  54 128  Renovations to recently purchased building for new library   $2,000,000.00
 Red Creek Free Library  54 128  Add space by renovating the second floor (new drop ceiling, drywall, a new floor, heating and air conditioning ductwork, updated electrical for both lighting and computers, new bathroom fixtures), renovate existing kitchen; install lift of some type to make the second floor accessible   $90,000.00
 Rose Free Library  54 128 Renovations to make all areas of the library accessible to patrons in wheelchairs  $60,000.00
 Walworth-Seely Public Library  54 128   New building   $4,500,000.00
 Arcade Free Library  Wyoming 59 147  Move handicap accessible restroom. Also, move handicap accessible entrance. Front steps and railings need renovation  $25,000.00
 Cordelia A. Greene Library  59 147  New entryway/roof/facade to lift for improved accessibility; parking lot upgrades for improved accessibility  $70,000.00
 Stevens Memorial Community Library  59 147  Part 1 - The library needs to update handicapped ramp and entrance at the rear of the library which will become main entrance off the parking lot and meet ADA standards. The present entrance 80 feet along the driveway will be closed and a new porch and roof structure will give access at the front of the building. Part 2 - Moving the circulation desk with new books, magazines and DVDs to the rear entrance, opening adult shelving to be handicapped accessible. Creating new storage area for the materials at the back of the library while creating better meeting spaces where the present circulation desk is situated. Enlarging the children's area into a present office area with room for staff desks near the new circulation area.  $750,000.00
 Warsaw Public Library  59 147  Automatic doors  $10,000.00
 Wyoming Free Circulating Library Association  59 147  We will need to replace all of the siding on the building in the next 5 years and replace rotting boards underneath and around the foundation. We would like to add a community room with a kichen for teen and adult programs. We will need new shelves and replace old current ones. We need new carpet in the whole library. It is at least 15 years old. Our lights on the ceiling of the main room will need replacing in the next 5 years. The inside walls need refacing and the whole library needs painting which hasn't been done for at least 8 years. Install a security system. Upgrade handicapped accessible ramp and entrance to include an automatic opening door.  $500,000.00

 

System

Library Name

County

Sen. Dist.

Asy. Dist.

Project Description

Amount

System Total

Queens Borough Public Library

$646,660,000.00

Arverne Queens 14 23 RENOVATION OUTFITTING / CUSTOMER SERVICE MODEL (CSM) / SELF CHECK BOOKDROPS (RFID) TECHNOLOGY $550,000.00
Astoria 12 36 ELEVATOR / ADA / CUSTOMER SERVIVE MODEL / SELF CHECK  $1,805,000.00
Astoria 12 36 INTERIOR RENOVATION $2,320,000.00
Auburndale 11 26 ROOF REPLACEMENT $325,000.00
Baisley Park 10 32 ELEVATOR / ADA, HVAC, FIRE ALARM / CO DETECTORS, MASONRY REPAIR / SELF CHECK $5,305,000.00
Bay Terrace 16 26 HVAC / BMS $460,000.00
Bellerose 11 33 HVAC, FIRE ALARM / CO DETECTORS, ADA, SELF CHECK $1,300,000.00
Bellerose 11 33 INTERIOR RENOVATION $2,320,000.00
Breezy Point     PROPOSED NEW FACILITY $21,200,000.00
Briarwood 14 27 ROOF REPLACEMENT, BUILDING EXPANSION / RENOVATION / SELF CHECK $3,130,000.00
Broad Channel 10 23 SITE / ADA / SELF CHECK  $700,000.00
Broadway 12 30 RENOVATION - PHASE II / CSM / SELF CHECK $4,150,000.00
Cambria Heights 14 33 SELF CHECK $100,000.00
Central 14 29 FIRE ALARM / CO DETECTORS, AIR CONDITIONING, DATA CENTER / UPS, ROOF, CEILING / LIGHTING, DUCTWORK $10,525,000.00
Central 14 29 RENOVATION / MODERNIZATION $75,000,000.00
CLDC 14 29 CHILDREN'S LIBRARY DISCOVERY CENTER - SELF CHECK $1,500,000.00
Corona 13 39 ROOF REPLACEMENT / WATERPROOFING / SELF CHECK $565,000.00
Corona 13 39 ADJACENT SITES ACQUISITION / BUILDING EXPANSION $5,610,000.00
Corona Heights     PROPOSED NEW FACILITY $21,200,000.00
Douglaston 11 26 SELF CHECK $420,000.00
Douglaston 11 26 REPLACEMENT FACILITY $21,190,000.00
East Elmhurst 13 35 SELF CHECK $90,000.00
East Flushing 11 25 HVAC / BMS, MASONRY REPAIR, WINDOWS & DOORS, SELF CHECK $1,710,000.00
East Howard Beach     PROPOSED NEW FACILITY $21,200,000.00
Elmhurst 11 26 REPLACEMENT FACILITY - SUPPLEMENTAL CONSTRUCTION / OUTFITTING  $7,650,000.00
Flushing 16 22 ELEVATOR, INTERIOR RENOVATION, SELF CHECK $5,035,000.00
Forest Hills 10 28 SELF CHECK $300,000.00
Fresh Meadows 16 24 ROOF REPLACEMENT, FIRE ALARM / CO DETECTORS, ADA, SELF CHECK  $1,110,000.00
Glen Oaks 11 24 REPLACEMENT FACILITY - SUPPLEMENTAL CONSTRUCTION, OUTFITTING, SWING SPACE, SELF CHECK $5,540,000.00
Glendale 15 38 PHASE II & PHASE III RENOVATION / ELEVATOR / ADA, GARDEN, MAIN FLOOR, MEZZANINE, SELF CHECK $4,170,000.00
Hollis 11 24 HVAC / BMS, ROOF REPLACEMENT, FIRE ALARM / CO DETECTORS, ADA, SELF CHECK $1,910,000.00
Hollis 11 24 INTERIOR RENOVATION $2,320,000.00
Howard Beach 15 23 ROOF REPLACEMENT, SELF CHECK $700,000.00
Jackson Heights 13 34 SELF CHECK $300,000.00
Jackson Heights 13 34 NEW REPLACEMENT FACILITY $52,600,000.00
Kew Gardens 16 27 PROPOSED NEW FACILITY $21,200,000.00
Kew Gardens Hills 16 27 BUILDING EXPANSION / RENOVATION - SCOPE IN DEVELOPMENT; SUPPLEMENTAL FUNDING REQUIRED $8,250,000.00
Langston Hughes 16 27 SELF CHECK $95,000.00
Laurelton 10 31 HVAC / BMS, FIRE ALARM / CO DETECTORS, SELF CHECK $935,000.00
Lefferts 10 25 ROOF REPLACEMENT, SELF CHECK $700,000.00
Lefrak City 13 35 SELF CHECK $550,000.00
Long Island City 12 37 SECURITY LIGHTING, SELF CHECK $300,000.00
Maspeth 15 30 FIRE ALARM / CO DETECTORS, SELF CHECK  $375,000.00
McGoldrick 11 22 ROOF REPLACEMENT, HVAC / BMS, SELF CHECK  $885,000.00
McGoldrick 11 22 INTERIOR RENOVATION 2.320,000
Middle Village 15 28 FIRE ALARM / CO DETECTORS, SELF CHECK $525,000.00
Mitchell-Linden 16 26 MASONRY / WATERPROOFING, SELF CHECK $735,000.00
Mitchell-Linden 16 26 REPLACE RENTAL FACILITY $21,190,000.00
North Forest Park 15 28 SELF CHECK, SUPPLEMENTAL INTERIOR RENOVATION $2,030,000.00
North Hills 11 24 ROOF, ADA SITE WORK / FIRE ALARM / CO DETECTORS, SELF CHECK  $1,330,000.00
North Hills 11 24 INTERIOR RENOVATION $1,855,000.00
North Jackson Heights 13 34 PROPOSED NEW FACILITY $21,200,000.00
Ozone Park 15 38 HVAC / BMS, SELF CHECK  $845,000.00
Peninsula 14 23 ROOF REPLACEMENT, SELF CHECK  $850,000.00
Pomonok 16 27 SELF CHECK $200,000.00
Poppenhusen 11 27 SELF CHECK  $550,000.00
Queens Village 11 23 HVAC / BMS, ELEVATOR / ADA / RENOVATION, FIRE ALARM / CO DETECTORS, SELF CHECK $5,670,000.00
Queens West     NEW FACILITY CONSTRUCTION & OUTFITTING (Partially funded) $21,350,000.00
Queensboro Hill 16 22 ROOF REPLACEMENT, FIRE ALARM / CO DETECTORS, SELF CHECK $1,035,000.00
Queensboro Hill 16 22 INTERIOR RENOVATION $2,320,000.00
Regional Libraries Various Various ESTABLISH (6) NEW REGIONAL LIBRARIES ($30.0 M each): $180,000,000.00
Rego Park 16 28 MASONRY / RE-POINTING $350,000.00
Rego Park 16 28 NEW REPLACEMENT FACILITY (Partially funded) $20,120,000.00
Richmond Hill 10 27 ELEVATOR / ADA, HVAC / BMS, WINDOWS & DOORS, MASONRY REPAIRS, FIRE ALARM / CO DET., SELF CHECK $3,565,000.00
Richmond Hill 10 27 INTERIOR RENOVATION $2,320,000.00
Ridgewood 15 37 BUILDING RENOVATION PHASE II, SELF CHECK  $565,000.00
Rochdale Village 10 32 SUPPLEMENTAL EXPANSION, HVAC / BMS, ROOF, FIRE ALARM / CO DETECTORS, SELF CHECK $2,835,000.00
Rosedale 14 29 SELF CHECK $200,000.00
Rosedale 14 29 REPLACE RENTAL FACILITY $21,200,000.00
Seaside 14 23 ROOF REPLACEMENT, WINDOWS & DOORS, SELF CHECK $1,300,000.00
South Jamaica 10 32 SELF CHECK  $100,000.00
South Ozone Park 10 31 ROOF SECURITY FENCING, FIRE ALARM / CO DETECTORS, SELF CHECK $875,000.00
St. Albans 10 33 ROOF REPLACEMENT, SELF CHECK  $500,000.00
Steinway 12 36 ROOF / MASONRY, ELEVATOR / ADA, INTERIOR RENOVATION $5,205,000.00
Whitestone 11 26 WINDOWS & DOORS, SELF CHECK  $1,125,000.00
Windsor Park 11 24 SELF CHECK  $235,000.00
Woodhaven 15 38 ELEVATOR / ADA, HVAC / BMS, FIRE ALARM / CO DETECTORS, WINDOWS & DOORS, SELF CHECK   $3,680,000.00
Woodhaven 15 38 INTERIOR RENOVATION $2,900,000.00
Woodside 12 30 SELF CHECK  $300,000.00

 

System

Library Name

County

Sen. Dist.

Asy. Dist.

Project Description

Amount

System Total

Ramapo-Catskill Library System

$134,313,200.00

  Cornwall Public Library Orange 39 96 Addition to existing building $12,500,000.00
Florida Public Library 38 97  Expansion/addition $250,000.00
Goshen Public Library and Historical Society 39 97  New building $15,000,000.00
Monroe Free Library 39 97  Expansion/addition and renovation $10,000,000.00
Newburgh Free Library 39 100 Renovation $10,000,000.00
Pine Bush Area Public Library 39 96 Replacement of HVAC system; replacement of roof; construction of new, state of the art energy-efficient 300 square foot addition $175,000.00
Port Jervis Free Library 42 98 Replace mechanical, plumbing and electrical systems and install new sprinkler system in the existing building.  Replace roof, north chimney and custom-fabricated ornate cornice.  New addition and interior renovations of existing building. $4,300,000.00
Thrall Public Library District of Middletown and Wallkill 42 98 20,000 sq. ft. addition plus parking lot expansion $11,000,000.00
Tuxedo Park Library 38 97 Replace HVAC system $100,000.00
Nanuet Public Library Rockland 38 94 Demolition of existing building; construction of new state of the art, energy-efficient 40,000 square foot building $19,500,000.00
New City Free Library 38 94  Expansion/addition and renovation, including Replacement of HVAC system; installation of new circulation desk; renovations to lobby including replacement of flooring and lighting; new front entrance steps and handicap ramp; extensive renovations to meeting room including "green" lighting system $16,000,000.00
Nyack Library 38 95 Replace of the roof on old part of the building $75,000.00
Rose Memorial Library Association 38 96  HVAC replacement, construction of a new ramp and accessible entrance and sewer line replacement (short term) & a new building (long term) $10,085,000.00
Tappan Library 38 95  Expansion/addition and renovation $2,000,000.00
Tomkins Cove Public Library 38 96 Replace windows; install energy efficient lighting; install air conditioning unit; remove and replace exterior cladding to improve energy efficiency; install solar panels   $279,000.00
Valley Cottage Free Library 38 94 Expansion of parking lot $400,000.00
Daniel Pierce Library Sullivan 42 98 Complete new 23,500 square foot; demolition of old extension and building new structure; renovation of of original historic property.  $5,000,000.00
Ethelbert B. Crawford Public Library 42 98  Expansion/addition $9,000,000.00
Liberty Public Library 42 98  Repairs, renovation and addition $1,700,000.00
Western Sullivan Public Library 42 98 Narrowsburg branch - Replace oil burner, install hot water heater and chimney (solar ready);   install solar panels and and roofs supports.
Calicoon branch - Install handicapped railing around front patio, reset or replace stones as needed;  restoration of facade on back of bldg.
$105,000.00
Cragsmoor Free Library Ulster (see also Mid-Hudson) 42 101  ADA compliance & Replacement of HVAC system; rehabilitation work on exterior of building including sealing and insulation upgrades for energy-efficiency; installation of energy-efficient lighting; rehabilitation work on 8 ft. windows in reading room (historic building) $344,200.00
Wallkill Public Library 39 101 Construction of new state of the art, energy-efficient 8,700 square foot addition to existing library building $6,500,000.00

 

System

Library Name

County

Sen. Dist.

Asy. Dist.

Project Description

Amount

System Total

Southern Adirondack Library System

$7,668,000.00

Galway Public Library Saratoga 44 110 expand or build new library $2,000,000.00
Saratoga Springs Public Library 43 109 Renovations $1,000,000.00
Stillwater Free Library 43 110 Renovations $500,000.00
Town of Ballston Community Library 43 112 interior renovation $18,000.00
Women's Round Lake Improvement Society Library 44 110 Build a new library or expnasion $1,400,000.00
Stony Creek Free Library Warren 45 113 New facility (facility will include additional meeting space, improved handicapped access, additional shelving space, new office/work area, quiet reading/study area, young adult/teen area, school room with furnishings, and additional space for public access computers) $750,000.00
Pember Library and Museum Washington 45 112 Addition (additional meeting space), elevator, New HVAC system, renovations to make all areas of the library accessible to people in wheelchairs (including restrooms) $2,000,000.00

 

System

Library Name

County

Sen. Dist.

Asy. Dist.

Project Description

Amount

System Total

Southern Tier Library System

$17,506,473.00

Alfred Box of Books Library Allegany 57 147 Renovation $100,000
Belfast Public Library 57 149 New roof $25,000
Belmont Literary & Historical Society Free Library 57 147 New front steps and railing, new door, elevator $65,000
David A. Howe Public Library 57 149 Complete restoration, hot-water heating, air conditioning, elevator; reconstruction of exterior stairway; replacement and restoration of building's original windows $5,145,000
Wide Awake Club Library 57 147 buying, building or renovating $725,000
Chemung County Public Library – Big Flats Chemung 53 137 Handicapped restroom, fire detection, windows, other. Replacement of drywell and drainage in back parking lot $171,554
Chemung County Public Library – Horseheads 53 137 Roof and other renovation, window replacement, parking lot repairs $314,813
Chemung County Public Library – Steele 53 137 Replacement of roof; complete rehabilitation of parking lot. Replacement of bookmobile $985,000
Chemung County Public Library – West Elmira 53 137 Handicapped restroom & interior alterations, windows, other $180,106
Dutton S. Peterson Memorial Library Schuyler 53 137  Grading and foundation for addition , wiring, roof, windows, foundation, furniture,

$100,000
Cohocton Public Library Steuben 53 136 Renovation and addition $100,000
Howard Public Library 53 136 Elevator, renovation $90,000
Prattsburgh Library 53 136 Restoration second floor $75,000
Southeast Steuben County Library 53 136 New library building $1,500,000
Wimodaughsian Free Library 53 136 renovation - second floor $100,000
Middlesex Reading Center Yates 53 136 Addition $30,000
Penn Yan Public Library 53 136 Renovate & expand existing building $7,800,000

 

System

Library Name

County

Sen. Dist.

Asy. Dist.

Project Description

Amount

System Total

Suffolk Cooperative Library System

$135,800,000.00

  Amityville Public Library Suffolk 8 11 Renovation
$400,000.00
Bayport-Blue Pt Public Library 3 3 New Building
$10,000,000.00
Central Islip Public Library 3 6 Renovation
$700,000.00
East Hampton Library 2 9 New Building
$5,000,000.00
Elwood Public Library 1 2 New Building
$10,000,000.00
Hampton Bays Public Library 5 9 Renovation
$300,000.00
Hampton Memorial Library 1 2 New Building
$4,000,000.00
Hauppauge Public Library 1 2 New Building
$10,000,000.00
John Jermain Memorial Library 3 7 New Building
$8,000,000.00
Lindenhurst Memorial Library 1 2 New Building
$10,000,000.00
Longwood Public Library 4 11 New Building
$11,000,000.00
Mastics-Moriches-Shirley Community Library 1 1 New Building
$6,000,000.00
Sayville Library 3 2 New Building
$10,000,000.00
The Smithtown Library - Commack 3 7 New Building
$9,000,000.00
Smithtown Special Library District 2 7 New Building
$21,000,000.00
South Huntington Public Library 5 10 Renovation
$400,000.00
Southold Free Library 1 1 New Building
$7,000,000.00
Westhampton Free Library 1 2 New Building
$5,000,000.00
Wyandanch Public Library 4 10 New Building
$8,000,000.00

 

System

Library Name

County

Sen. Dist.

Asy. Dist.

Project Description

Amount

System Total

Upper Hudson Library System

$112,272,323.00

  Albany Public Library - Main Albany 46 106 Construct a new Main Library building  $50,000,000
Albany Public Library - Arbor Hill/WestHill  46 104 Construct a new 12,000 square foot branch library, including geothermal wells $5,715,745
Albany Public Library - Delaware 46 106 Total renovation/rehabilitation and major energy-efficiency upgrades $4,728,074
Albany Public Library - Howe 46 106 Total renovation/rehabilitation and major energy-efficiency upgrades $5,242,637
Albany Public Library - New Scotland 46 104 Construct a new building and name it the John J. Bach Branch Library $4,048,580
Albany Public Library - Pine Hills 46 104 Total renovation/rehabilitation and major energy-efficiency upgrades $4,784,437
Altamont Free Library 46 104 Extensive renovations of the Altamont Train Station: Re-do interior of new building, build rest rooms, build meeting rooms, construct proper entrances, build parking lot, landscaping, and purchase new library furniture $500,000
Berne Public Library 46 104 Renovate existing Hilltown Senior Center building to become a library or purchase land and build a new library. $400,000
Bethlehem Public Library 46 108 Expansion of existing building to increase storage, staff and public service areas. $1,500,000
Cohoes Public Library 46 106 Renovate and reconstruct existing building  $200,000
Guilderland Public Library 46 104 Renovate existing building and expand it by 20,000 square feet $12,300,000
RCS Community Library 46 108 Expand the current building by 3,000 square feet $1,200,000
Rensselaerville Public Library 46 104 Replacement of siding; rehabilitation of roof; reconfiguration of basement space to use as storage and work area $37,850
Town of Westerlo Public Library 46 104 Expand existing library into adjacent museum space with new furnishings and equipment $100,000
Voorheesville Public Library 46 104 Construct a new 20,000 square foot library building $8,000,000
Wm. K. Sanford Public Library 46 109 Expand the current building by 15,000 square feet $6,000,000
Brunswick Community Library Rensselaer 43 108 Extensive renovations to interior and exterior of newly purchased building $135,000
East Greenbush Community Library 43 106 Repair and rehabilitate tile work on front of building; repair around windows and sheet rock inside $100,000
Grafton Community Library 43 112 Expand existing building $150,000
Poestenkill Library 43 108 Expand existing building and install an elevator $500,000
Rensselaer Public Library 43 106 Renovation (general construction components) of newly purchased library building (including upgraded energy-efficient electrical, plumbing, and heating/cooling systems) $1,000,000
Sand Lake Town Library 43 108 Renovate adult, teen, and circulation/staff areas of the library $95,000
Stephentown Memorial Library 43 112 Construction of handicapped accessible deck area for community use; reconfiguration of existing building to create staff work area and Director's office; new carpeting in original library space; replace old roof; create a teen area in original library space; expand children's area in existing building. $35,000
Troy Public Library 43 106 Renovate existing Main Library building $3,000,000
Troy Public Library - Lansingburgh 43 106 Renovate existing building $500,000
Troy Public Library- Sycaway 43 106 Construct a new building $1,500,000
Valley Falls Free Library 43 112 Expand existing building $500,000

 

System

Library Name

County

Sen. Dist.

Asy. Dist.

Project Description

Amount

System Total

Westchester Library System

$129,142,773.00

  Ardsley Public Library Westchester 35 92 Expansion and Renovation of existing building $1,500,000
Briarcliff Manor Public Library 35 92 Renovation and furnishing of existing 2,300 sq. ft. portion of building. $1,000,000
Bronxville Public Library 34 88 New flooring, improved electrical wiring $8,000
Chappaqua Library 37 89 Emergency exit window for Children's program room; Renovate public restrooms to improve ADA access and energy efficiency; expand Children's Area; expand parking.  New roof for 2,200 square foot expansion to the Children's Room. $7,010,000
Croton Free Library 40 90 Renovations to circulation area, meeting room, telecommunications wiring $175,000
Dobbs Ferry Public Library 35 92 Replacing front doors with automatic ones $50,000
Eastchester Public Library 34 88 ADA accessibility; HVAC repair $500,000
Harrison Public Library 37 89 New addition $6,250,000
Hendrick Hudson Free Library 37 89 Renovation of existing building with expansion as a possibility to accommodate growing needs:  HVAC and electric upgrades as proposed by energy audit report including replacement of current HVAC system with more efficient one, and changing all exit signs to LED; converting computer room to visible study room, addition of stacks; expand Children's Area; create area for Literacy program; expand Children's office space. $2,000,000
Hiram Halle Memorial Library 40 90 Expansion and Renovation of existing building $2,900,000
John C. Hart Memorial Library 40 89 22,000 square foot addition (including additional study room space, an additional community room, a young adult area, additional space for public access computers); replacement of HVAC system. $12,000,000
Larchmont Public Library 40 99 Renovation of Children's Room including: new handicapped accessible bathrooms, elevator, energy efficient windows and lighting, new electrical wiring, etc.  In 1926 portion of building:  energy efficient lighting and windows. $3,200,000
Lewisboro Library
(formerly South Salem Library)
37 91 Construction of new 15,000 sq. ft. building incorporating meeting space, expanded collection and expanded children's room $6,000,000
Mamaroneck Public Library District 40 89 New construction/building expansion/renovation and rehabilitation of the existing library. $21,744,381
Mt. Pleasant Public Library 37 91 New roof, install solar panels on roof, renovate community room, repave parking lot, new young adult area, new local history center, renovations to staff working areas $600,000
North Castle Public Library 37 91 Refurbish the circulation area, and make all areas handicapped accessible $200,000
Port Chester Public Library 37 89 Expansion of library building by 5,000 sq. ft. to double size of Children's Room and add a meeting room, 2 offices, and additional parking $3,000,000
Ruth Keeler Memorial Library 37 91 Addition of a young adult area, storage area, quiet reading rooms; drainage work $1,500,000
Rye Free Reading Room 40 99 Renovation, including restoration of the reading rooms; addition of teen space and staff workrooms; adding access to our lower level entrance;  sprinklers and fire alarm; window replacement, insulation and other energy-saving initiatives. $2,000,000
Scarsdale Public Library 37 91 New windows, new lighting, renovations to make all areas of the library accessible to patrons in wheelchairs $307,892
Somers Library 37 88 7,000 sq. ft. addition (meeting room space, computers, enclosed children's room, teen section), new heating-air, efficient windows, efficient lighting, better outdoor lighting, new roof, repair septic system, new carpeting. $9,500,000
The Field Library 40 99 Replace existing building $25,000,000
Town of Pelham Library 40 90 Furnish and install sump pumps, back-up generator, and dehumidifiers.  Regrade, clean and install vapor barrier, concrete pour and rat slab for crawl space. $27,500
Tuckahoe Public Library 34 88 Alarm; upgrade electric $10,000
West Harrison Branch Library [Harrison PL] 34 88 Additional meeting space, additional space for public access computers, elevator, additional space to house the current collection, upgrades to wiring for electrical equipment and telecommunications $5,500,000
White Plains Public Library 37 88 New roof, new windows, new lighting, new HVAC system, wheelchair accessible restroom, young adult area, renovation of meeting rooms, reconfiguration of main lobby $3,000,000
  Yonkers Public Library - Crestwood Branch 35 93 ADA accessibility; HVAC/energy conservation improvements $725,000
  Yonkers Public Library - Grinton I. Will Branch Library 35 93 Renovation/Intrastructure improvements & parking lot expansion $12,700,000
  Yonkers Public Library - Riverfront Library 35 93 Teen Room remodeling/expansion.  Replace automatic doors.  Upgrade security system.  Finish shell space in basement. $735,000

Total Construction Costs, All Systems: $2,529,241,400.28