Shovel-Ready Public Library Construction Projects as of February 25, 2009
Listed by County and Library (Alphabetically)
By County: Albany | Allegany | Bronx | Cattaraugus | Chautauqua | Chemung | Chenango | Clinton | Columbia | Cortland | Dutchess | Erie | Essex | Franklin | Fulton | Genesee | Greene | Herkimer | Jefferson |Kings (Brooklyn) | Livingston | Madison | Monroe | Nassau | New York (Manhattan) | Niagara | Oneida | Onondaga | Ontario | Orange | Orleans | Oswego | Otsego | Putnam | Queens | Rensselaer | Richmond (Staten Island) | Rockland | Saratoga | Schenectady | Seneca | St. Lawrence | Steuben | Suffolk | Sullivan | Tompkins | Ulster | Warren | Wayne | Westchester | Wyoming | Yates
| County | Library/Library Building | Branch Name | Description | Total Cost | CD | AD | SD | Construction Duration (in months) | Green Project | Energy Efficiency/ Cost Savings |
Albany |
Albany Public Library | Arbor Hill Branch | Construction of new 12,000 square foot branch library (including geothermal wells) | $5,715,745 | 21 | 104 | 46 | 36 | Y | Y |
| Delaware Branch | Total renovation/rehabilitation and major energy-efficiency upgrades | $4,728,074 | 21 | 104 | 46 | 36 | Y | Y | ||
| Howe Branch | Total renovation/rehabilitation and major energy-efficiency upgrades | $5,242,637 | 21 | 104 | 46 | 36 | Y | Y | ||
| New Scotland Branch | Total renovation/rehabilitation and major energy-efficiency upgrades | $4,048,580 | 21 | 104 | 46 | 36 | Y | Y | ||
| Pine Hills Branch | Total renovation/rehabilitation and major energy-efficiency upgrades | $4,784,437 | 21 | 104 | 46 | 36 | Y | Y | ||
| Altamont Free Library | Extensive renovations to Altamont Train Station for use as a library | $500,000 | 21 | 104 | 46 | 24 | Y | |||
| Bethlehem Public Library | Expansion and reconstruction of existing parking lot including rerouting of access to and egress from lot; new covered shelter for passenger dropoff and pickup; new walkways and crosswalks from parking to library building | $460,034 | 21 | 108 | 46 | 18 | ||||
| Cohoes Public Library | Replacement of lighting fixtures with energy-efficient units | $75,000 | 21 | 106 | 46 | 12 | Y | |||
| Guilderland Public Library | Reconfigure existing space to enlarge the Community Room and Children's area, relocate and enlarge the Technology Dept., and create a new community room/local history area; relocate all sewer lines | $1,100,000 | 21 | 104 | 46 | 24 | ||||
| Rensselaerville Public Library | Replacement of siding; rehabilitation of roof; reconfiguration of basement space to use as storage and work area | $37,850 | 21 | 102 | 42 | 15 | Y | |||
Allegany |
David A. Howe Public Library | Reconstruction of exterior stairway; replacement and restoration of building's original windows | $145,222 | 29 | 149 | 57 | 24 | Y | ||
Cattaraugus |
Allegany Public Library | Replacement of HVAC and lighting systems in historic building | $40,000 | 29 | 149 | 57 | 18 | Y | Y | |
| Olean Public Library | Construction of 11,000 square foot addition to existing building; extensive interior renovations to existing building including replacement of HVAC system and replacement of roof | $4,000,000 | 29 | 149 | 57 | 36 | Y | Y | ||
Chautauqua |
Ashville Free Library | Replacement of roof and windows; extensive renovations to second floor of existing building | $64,400 | 27 | 150 | 57 | 24 | Y | ||
| Falconer Public Library | Replacement of HVAC and lighting systems in historic building; renovations to make basement handicap accessible | $100,000 | 27 | 150 | 57 | 24 | Y | Y | ||
| James Prendergast Library Association | Construction of 6,615 square foot addition to existing building; replacement of HVAC system, windows and roof; installation of electric lines and computer cables in concrete slab foundation; removal and replacement of existing carpet and floor tiles including asbestos abatement | $4,422,027 | 27 | 150 | 57 | 36 | Y | |||
| Kennedy Free Library | Construction of new state of the art, energy-efficient "green" library building | $2,500,000 | 27 | 149 | 57 | 36 | Y | Y | ||
| Lakewood Memorial Library | Reconstruction/reconfiguration of existing space to create new Director's office and staff workroom, circulation area, computer area, and stacks; replacement of interior lights and windows; new ceiling; furnishings for newly configured area | $154,789 | 27 | 150 | 57 | 30 | Y | |||
Chemung |
Chemung County Library District | Big Flats Branch | Replacement of drywell and drainage in back parking lot | $5,000 | 29 | 137 | 53 | 12 | Y | |
| Main Library | Replacement of Bookmobile | $200,000 | 29 | 137 | 53 | |||||
| Steele Branch | Replacement of roof; complete rehabilitation of parking lot | $785,000 | 29 | 137 | 53 | 18 | Y | |||
Chenango |
Moore Memorial Library | Construction of 17,470 square foot state of the art, energy-efficient expansion | $3,500,000 | 24 | 107 | 52 | 36 | Y | Y | |
| New Berlin Library | Replacement of windows | $8,500 | 24 | 122 | 50 | 18 | Y | |||
| Oxford Memorial Library | Construction of 1,100 square foot addition including installation of a chair lift, bathroom, and full basement for storage | $419,240 | 24 | 107 | 52 | 30 | Y | |||
Clinton |
Clinton Essex Franklin Library System | Replacement of front steps and railing; reconstruction of collapsing driveway | $25,000 | 23 | 114 | 45 | 15 | |||
| Dodge Memorial Library | Replacement of existing library's portico | $30,000 | 23 | 114 | 45 | 9 | ||||
| Mooers Free Library | Installation of insulation in attic of existing library building and replacement of 4 windows | $5,000 | 23 | 114 | 45 | 15 | Y | |||
| Peru Free Library | Replacement of furnace, front sidewalk, and roof; installation of solar panels | $134,582 | 23 | 114 | 45 | 24 | Y | Y | ||
| Plattsburgh Public Library | Conversion to electric heat and installation of solar panels | $375,000 | 23 | 114 | 45 | 24 | Y | Y | ||
Columbia |
Claverack Free Library | Construction of addition to double space of existing library; renovations to existing space to make building handicap accessible | $1,000,000 | 20 | 103 | 41 | 30 | Y | ||
| Hudson Area Association Library | Extensive renovations to historic building | $8,000,000 | 20 | 103 | 41 | 36 | Y | |||
| Kinderhook Memorial Library | Construction of addition to double space of existing library | $2,000,000 | 20 | 108 | 41 | 30 | Y | |||
| New Lebanon Library | Construction of 880 square foot addition including a kitchenette facility and purchase of furniture and equipment | $331,431 | 21 | 108 | 41 | 30 | Y | |||
| Roeliff Jansen Community Library | Construction of new, energy-efficient green 7,500 square foot library building with LEED certification | $2,078,500 | 20 | 103 | 41 | 30 | Y | Y | ||
| Valatie Free Library | Extensive renovations of newly purchased library building | $250,000 | 20 | 108 | 41 | 24 | Y | |||
Cortland |
Peck Memorial Library | Restoration of entire exterior of existing brick building; replacement of windows with energy-efficient units | $218,000 | 24 | 123 | 51 | 24 | Y | ||
Dutchess |
Amenia Free Library | Construction of addition to double space of existing library | $1,000,000 | 20 | 103 | 40 | 30 | Y | ||
| Beekman Library | Construction of addition to double space of existing library | $400,000 | 20 | 103 | 40 | 30 | Y | |||
| Greater Poughkeepsie Library District | Construction of a new 19,000 square foot four-floor expansion | $15,086,260 | 22 | 100 | 41 | 36 | Y | |||
| Howland Public Library (Beacon) | Construction of addition to double space of existing library | $10,000,000 | 19 | 100 | 41 | 36 | Y | |||
| Mid-Hudson Library System | Renovations to existing building to increase energy-efficiency including installation of solar panels | $500,000 | 22 | 100 | 41 | 24 | Y | |||
| Pine Plains Library | Construction of new library including installation of geothermal wells | $2,100,000 | 20 | 103 | 40 | 30 | Y | Y | ||
| Pleasant Valley Free Library | Construction of addition to double space of existing library | $2,500,000 | 20 | 103 | 41 | 30 | Y | |||
| Red Hook Public Library | Construction of three-story addition to rear of building | $210,000 | 20 | 103 | 41 | 24 | Y | |||
| Staatsburg Library | Construction of addition to double space of existing library | $500,000 | 20 | 102 | 41 | 30 | Y | |||
Erie |
Amherst Public Library | Main Branch | Replacement of roof over original part of building. | $295,000 | 26 | 148 | 61 | 18 | Y | |
| Angola Public Library | Construction of 1,138 square foot energy-efficient addition to provide public meeting and children's programming space | $275,769 | 27 | 146 | 59 | 30 | Y | |||
| Aurora Town Public Library | Replace lighting with new, state of the art, energy-efficient lighting system; replacement of front entry doors with energy-efficient, ADA compliant units | $18,000 | 27 | 123 | 54 | 12 | Y | |||
| Buffalo & Erie County Public Library | Central Library | Extensive renovations of library building including installation of elevators to replace energy inefficient escalators, asbestos abatement, modification of generators to allow alternative fuel use | $16,687,371 | 28 | 141 | 58 | 36 | Y | ||
| Buffalo & Erie County Public Library | Crane Branch | Replacement of lighting, windows, roof, and ceiling tiles with energy-efficiency upgrades | $140,000 | 27 | 141 | 58 | 24 | Y | ||
| Buffalo & Erie County Public Library | Dudley Branch | Replacement of lighting and windows with energy-efficiency upgrades; replacement of existing floor to incorporate new wiring and electrical for connectivity and computer terminals | $130,000 | 27 | 145 | 58 | 24 | Y | ||
| Buffalo & Erie County Public Library | East Clinton Branch | Replacement of lighting with new, energy-efficient lighting system; replacement of existing floor to incorporate new wiring and electrical for connectivity and computer terminals | $110,000 | 27 | 145 | 58 | 24 | Y | ||
| Buffalo & Erie County Public Library | East Delavan Branch | Replacement of lighting with energy-efficiency lighting system; installation of new, energy-efficient, ADA compliant front door | $37,000 | 28 | 141 | 60 | 15 | Y | ||
| Buffalo & Erie County Public Library | Niagara Branch | Replacement of lighting with energy-efficient lighting system; replacement of existing floor to incorporate wiring and electrical for connectivity and computer terminals; replacement of boiler with geothermal wells | $260,000 | 27 | 144 | 58 | 30 | Y | Y | |
| Buffalo & Erie County Public Library | Riverside Branch | Replacement of lighting with energy-efficient lighting system; replacement of roof and ceiling tiles to improve energy conservation | $70,000 | 27 | 144 | 60 | 18 | Y | ||
| Cheektowaga Public Library | Anna M. Reinstein Memorial Library | Total rehabilitation of parking lot | $15,500 | 27 | 143 | 58 | 12 | |||
| Cheektowaga Public Library | Main Library | Total rehabilitation of parking lot | $4,055 | 27 | 148 | 58 | 12 | |||
| City of Tonawanda | Replacement of HVAC system; rehabilitation of the library's exterior walls | $165,000 | 28 | 140 | 61 | 24 | Y | |||
| Ewell Free Library | Replacement of HVAC system on upper floor of building with energy efficient equipment; installation of energy efficient air conditioning equipment in basement meeting area | $30,250 | 27 | 142 | 59 | 24 | Y | |||
| Lancaster Public Library | Resurfacing of existing concrete floor and replacement of deteriorated carpet | $34,144 | 26 | 143 | 59 | 15 | ||||
| Marilla Free Library | Reconfiguration of existing 3,400 square foot library to create more economical use of space including the expansion of the library's Employment/Education Resource Center | $12,000 | 27 | 142 | 59 | 18 | ||||
| Town of Collins Public Library | Installation of electric door openers to make front entry doors ADA compliant | $5,000 | 27 | 146 | 59 | 6 | ||||
Essex |
Elizabethtown Library Association | Replacement and reframing of door and replacement of building's historically significant windows | $11,250 | 20 | 113 | 45 | 30 | Y | ||
| White Plains Public Library | Renovation of all public bathrooms for more efficient plumbing and wheelchair accessibility | $275,000 | 18 | 88 | 37 | 24 | ||||
Franklin |
The Wead Library | Purchase and installation of 40 windows with e-4 insulated glass window | $40,000 | 23 | 114 | 45 | 15 | Y | ||
Fulton |
Northville Public Library | Installation of elevator lift; reconstruction of 2nd floor including structural modifications to create open meeting room and kitchenette; installation of new windows and zoned HVAC; Renovation of the basement including new lighting and electrical outlets, new ventilation, new interior stairs and painting | $316,591 | 23 | 117 | 44 | 30 | Y | ||
Genesee |
Byron-Bergen Free Library | Gillam-Grant Community Center | Replacement of windows with energy-efficient units | $28,000 | 26 | 139 | 61 | 12 | Y | |
| Byron-Bergen Free Library | Extensive interior renovations of library building | $100,000 | 26 | 139 | 61 | 24 | Y | |||
| Corfu Free Library | Renovation of interior of new addition | $18,800 | 26 | 139 | 61 | 18 | Y | |||
| Haxton Memorial Library | Replacement of windows with energy-efficient units | $29,000 | 26 | 139 | 61 | 15 | Y | |||
| Pavilion Public Library | Reconfiguration of current circulation area | $26,500 | 26 | 147 | 61 | 15 | ||||
| Richmond Memorial Library | Renovations to make existing building handicap accessible; replacement of sidewalk; renovation of storage building | $108,500 | 26 | 139 | 61 | 24 | ||||
| Woodward Memorial Library | Installation of central air conditioning throughout existing library building; installation of energy-efficient window coverings | $111,000 | 26 | 139 | 61 | 24 | Y | |||
Greene |
Cairo Public Library | Construction of new, state of the art, energy-efficient library building | $3,500,000 | 20 | 127 | 51 | 36 | Y | ||
| Haines Falls Free Library | Replacement of roof, doors, and windows in newly purchased building | $2,850,000 | 20 | 127 | 51 | 30 | Y | |||
Herkimer |
Ilion Free Public Library | Installation of new HVAC system and new electrical; reconstruction of existing space to create new circulation/reference area and new meeting room | $264,200 | 24 | 117 | 51 | 30 | Y | ||
Jefferson |
Cape Vincent Community Library | Replacement of roof; renovations to make front entrance handicap accessible | $25,000 | 23 | 118 | 48 | 18 | Y | ||
| Carthage Free Library | Renovations to make building fully accessible, including installation of an elevator; construction of building addition; expansion of parking lot | $300,000 | 23 | 122 | 48 | 30 | Y | |||
Kings |
Brooklyn Public Library | 45 Branch Libraries | Replacement of roof | $27,000,000 | Various | Various | Various | 48 | Y | |
| 45 Branch Libraries | Replacement of windows with energy-efficient units | $45,000,000 | Various | Various | Various | 48 | Y | |||
| 50 Branch Libraries | Replacement of HVAC, boiler, and distribution system | $60,000,000 | Various | Various | Various | 48 | Y | |||
| 53 Branch Libraries | Installation of complete fire and safety alarm systems | $26,500,000 | Various | Various | Various | 48 | ||||
| 59 Branch Libraries | Installation of complete building management system and lighting controls | $29,500,000 | Various | Various | Various | 48 | Y | |||
| Central | Complete interior and exterior rehabilitation including replacement of windows, roof, HVAC, and electrical system | $51,000,000 | 11 | 57 | 20 | 48 | Y | |||
| Kensington | Construction of new state of the art, energy-efficient green library building | $18,000,000 | 11 | 44 | 21 | 36 | Y | Y | ||
| Park Slope | Replacement of HVAC system | $2,000,000 | 11 | 44 | 18 | 18 | Y | |||
Livingston |
Dansville Public Library | Construction of new state of the art, energy-efficient 7,200 square foot addition to existing building | $2,800,000 | 26 | 147 | 57 | 18 | Y | ||
| Lima Public Library | Construction of 500 square foot addition. | $196,510 | 26 | 147 | 59 | 24 | Y | Y | ||
Madison |
DeRuyter Free Library | Asbestos abatement in basement; construction of addition to house elevator and egress stairs; installation of elevator | $235,343 | 23 | 111 | 49 | 30 | Y | ||
Monroe |
Farmers Library Company of Ogden | Construction of energy-efficient addition to existing library | $2,000,000 | 26 | 134 | 62 | 30 | Y | ||
| Gates Public Library | Construction of energy-efficient addition to existing library; extensive renovations to existing library space | $6,600,000 | 29 | 133 | 62 | 36 | Y | |||
| Rochester Public Library | 10 Branches | Comprehensive branch upgrade package including construction of building additions, upgrades to HVAC, replacement of windows and roofs, and creation of teen centers | $2,000,000 | 28 | Various | Various | 30 | Y | ||
| Rochester Public Library | Replacement of HVAC system; extensive restoration of infrastructure and entire exterior of existing building | $10,500,000 | 28 | 133 | 56 | 36 | Y | |||
| Town of Mendon Public Library | Construction of new 6,840 square foot library incorporating green technology | $1,865,541 | 29 | 130 | 55 | 36 | Y | Y | ||
Nassau |
Bayville Free Library | Construction of 1,750 square foot expansion to existing library; extensive renovations to 2nd floor of existing library | $697,500 | 3 | 13 | 5 | 36 | Y | ||
| East Meadow Public Library | Replacement of HVAC; installation of complete energy management system for entire building | $129,400 | 4 | 15 | 6 | 12 | Y | |||
| East Rockaway Public Library | Installation of photovoltaic panels; rehabilitation of building exterior | $250,000 | 4 | 20 | 9 | 24 | Y | |||
| Farmingdale Public Library | Extensive building renovations including installation of new, energy efficient lighting fixtures and energy control dimming system and sensor system | $2,100,000 | 3 | 12 | 6 | 24 | Y | |||
| Freeport Memorial Library | Asbestos removal, reconstruction and new flooring, shelving, and furniture for children's room; reconstruction of circulation desk including floor adjustments and new electrical system | $219,025 | 4 | 19 | 8 | 24 | Y | |||
| Lynbrook Public Library | Rehabilitation of damaged flooring including replacement of carpet | $98,000 | 4 | 14 | 9 | 9 | ||||
| Nassau Library System | Construction of new meeting rooms and computer center; renovations including new entrance and handicap accessible restrooms | $700,000 | 4 | 18 | 6 | 18 | Y | |||
| North Merrick Public Library | Extensive renovations to existing library building; construction of addition to create community room; installation of photovoltaic panels | $6,750,000 | 3 | 17 | 8 | 36 | Y | Y | ||
| Peninsula Public Library | Construction of single lane driveway on west side of library building; reconstruction of existing parking lot | $177,000 | 4 | 20 | 9 | 15 | ||||
| Roosevelt Public Library | Excavation of building foundation and construction of new lower level and addition to existing building | $8,500,000 | 4 | 18 | 8 | 36 | N | |||
| Shelter Rock Public Library | Replacement of 8 rooftop HVAC units | $134,000 | 5 | 16 | 7 | 12 | Y | Y | ||
New York |
New York Public Library | Central Branch | Complete transformation of Research Library at 5th Avenue and 42nd st. The scope of this project will include infrastructure replacement, façade restoration, incorporation of energy-efficient technologies and increased broadband accessibility. Expansion of public space will include a new circulating library including additional book storage | $280,000,000 | 14 | 75 | 26 | 48 | Y | |
New York, Bronx, Richmond |
New York Public Library | Battery Park City, Highbridge, Kingsbridge, Mariners Harbor, 125th Street, 96th Street, Aguilar, Bloomingdale, Chatham Square, Epiphany, Fort Washington, George Bruce, Hamilton Fish Park, Hamilton Grange, Hudson Park, Kips Bay, Muhlenberg, Ottendorfer, Tompkins Square, Yorkville, Stapleton, St Agnes | Extensive renovations to branch libraries, and the installation of new fire alarms (upgrades when appropriate), sprinklers, emergency lighting, public address systems or panic bar installation on doors |
$6,950,000 | Various | Various | Various | 36 | Y | |
| Chatham Sq, New Amsterdam, Kips Bay, Tompkins Sq, Muhlenberg, Heiskell, Jefferson Market, Yorkville, 67th St, Hamilton Grange, Inwood, Riverdale,Spuyten Duyvil, East Chester, Edenwald, Wakefield, Allerton, Throgsneck, Van Nest, Westchester Sq, Belmont, Tremont, St George, Port Richmond, West New Brighton, Todt Hill, Richmond Town | Purchase and installation of new HVAC system | $31,830,000 | Various | Various | Various | 36 | Y | |||
| Epiphany, Jefferson Market, 125th st, Westchester Sq, St George, West New Brighton, Kips Bay,Tottenville, East Chester, Huguenot | Substantial renovations to existing branch library buildings. | $80,600,000 | Various | Various | Various | 36 | Y | |||
| Inwood, Port Richmond, St George, Huguenot | Installation of ADA-compliant elevators | $1,200,000 | Various | Various | Various | 24 | ||||
| Ottendorfer, Hudson Park, 96th St, Countee Cullen, Fort Washington, Washington Hts, Wakefield, Allerton, Throgs Neck, Grand Concourse, Hamilton Fish, Francis Martin, Belmont, West Farms, Hunts Pt, Melrose, Soundview, Port Richmond, Dongan Hills, Todt Hill, Richmondtown | Substantial renovations to existing branch library buildings | $97,100,000 | Various | Various | Various | 36 | Y | |||
| Spuyten Duyvil, Edenwald, Van Nest, Westchester, Melrose, West New Brighton, Huguenot | Purchase and installation of new upgraded fire alarm systems | $2,060,000 | Various | Various | Various | 24 | ||||
Niagara |
Barker Free Library | Extensive rehabilitation of interior and exterior of existing building | $20,000 | 28 | 139 | 62 | 18 | Y | ||
| Lewiston Public Library | Replacement of doors with energy-efficient units; installation of energy-efficient window films; installation of energy-efficient motion sensor lighting | $19,500 | 28 | 138 | 62 | 18 | Y | |||
| Lockport Public Library | Replacement of lighting with energy-efficient units; replacement of HVAC; installation of security gates with people counters; replacement of 21 windows; expansion to meeting room, children's room and storage area | $44,500 | 26 | 142 | 62 | 24 | Y | |||
| Middleport Public Library | Extensive renovations to interior of existing building | $28,000 | 26 | 142 | 62 | 18 | Y | |||
| Newfane Free Library | Replacement of windows and doors with energy-efficient units; replacement of siding; rehabilitation of parking lot | $24,000 | 28 | 138 | 62 | 24 | Y | |||
| Niagara Falls Public Library | LaSalle Branch | Rehabilitation of historic windows throughout building; installation of new exterior storm windows; installation of ductless air conditioning units | $264,756 | 28 | 138 | 60 | 30 | Y | ||
| Replacement of 54 windows; upgrade to air conditioning | $318,000 | 28 | 138 | 60 | 30 | Y | ||||
| Nioga Library System | Replacement of 3 air conditioning units; replacement of rooft; installation of 8 wind turbines; construction of 400 square foot addition to house computer equipment; rehabilitation of parking lot; repairs to exterior of original building; construction of handicap accessible entrance | $852,500 | 26 | 138 | 62 | 36 | Y | Y | ||
| North Tonawanda Public Library | Reconstruction of existing space to create new floor plan in library; purchase of furniture and carpeting for newly renovated space; rehabilitation of parking lot; upgrade to HVAC | $155,116 | 26 | 140 | 62 | 30 | ||||
| Ransomville Free Library | Construction of new 480 square foot building to store and preserve historical items | $125,000 | 28 | 138 | 62 | 30 | Y | |||
| Sanborn - Pekin Free Library | Renovations to interior of existing building; construction of new meeting room | $250,000 | 28 | 138 | 62 | 30 | Y | |||
| Wilson Free Library | Replacement of roof; installation of new drainage system; replacement of concrete flooring | $70,500 | 28 | 138 | 62 | 24 | Y | |||
| Youngstown Free Library | Construction of expansion to existing library | $451,000 | 28 | 138 | 62 | 30 | Y | |||
Oneida |
C. W. Clark Memorial Library | Construction of an 1,100 square foot 2 story addition to existing library; purchase of new shelving. | $153,008 | 24 | 111 | 49 | 24 | Y | ||
| Jervis Public Library | Reconstruction of 4 chimneys and adjacent roof slates on historic library building | $145,020 | 23 | 116 | 47 | 24 | ||||
Onondaga |
Fayetteville Free Library | Renovations to existing building to create Business Center, Café, and Performance Space | $841,057 | 25 | 121 | 49 | 30 | Y | ||
| Onondaga County Public Library | Beauchamp Branch | Replacement of roof | $134,195 | 25 | 119 | 49 | 15 | Y | ||
| Betts Branch | Replacement of HVAC | $122,714 | 25 | 120 | 50 | 15 | Y | |||
| Hazard Branch | Replacement of HVAC system including asbestos removal | $255,000 | 25 | 120 | 50 | 18 | Y | |||
| Mundy Branch | Replacement of roof | $115,025 | 25 | 120 | 50 | 15 | Y | |||
| Paine Branch | Replacement of HVAC system including asbestos removal | $115,000 | 25 | 120 | 50 | 18 | Y | |||
| Soule Branch | Replacement of HVAC | $154,271 | 25 | 119 | 49 | 15 | Y | |||
| Onondaga Free Library | Construction of 20,000 square foot state of the art, energy-efficient expansion and extensive renovations to existing building | $3,200,000 | 25 | 119 | 50 | 36 | Y | |||
Ontario |
Geneva Public Library | Renovation of 2nd floor in existing library building; replacement of BAC evaporative cooling tower | $83,274 | 27 | 129 | 54 | 4 | Y | ||
| Wood Library Association | Construction of 7,500 square foot state of the art, energy-efficient addition and extensive renovations to existing library building | $4,000,000 | 29 | 129 | 59 | 18 | Y | |||
Orange |
Albert Wisner Public Library | Construction of new 20,000 square foot library building (including geothermal heating system and solar glazed windows and doors) | $8,950,000 | 19 | 97 | 38 | 36 | Y | Y | |
| Pine Bush Area Public Library | Replacement of HVAC system; replacement of roof; construction of new, state of the art energy-efficient 300 square foot addition | $175,000 | 22 | 96 | 39 | 30 | Y | |||
| Port Jervis Free Library | Replacement of mechanical and electrical systems | $515,000 | 19 | 98 | 42 | 24 | Y | |||
| Ramapo Catskill Library System | Demolition of building adjacent to system headquarters including asbestos abatement; construction of new parking lot | $173,504 | 22 | 97 | 39 | 18 | ||||
| Tuxedo Park Library | Extensive renovations to existing building to increase energy-efficiency | $49,000 | 19 | 97 | 38 | 18 | Y | |||
Orleans |
Community Free Library | Merging of newly purchased building with adjacent existing library; demolition of common non-bearing walls; reconstruction and renovation of new "addition." | $111,800 | 26 | 139 | 62 | 24 | Y | ||
| Lee Whedon Memorial Library | Acquisition of site and construction of new, state of the art, energy-efficient library building | $920,000 | 26 | 139 | 62 | 30 | Y | Y | ||
| Swan Library | Acquisition of site and construction of new 28,000 square foot state of the art energy-efficient library building | $4,000,000 | 26 | 139 | 62 | 36 | Y | |||
| Yates Community Free Library | Parking lot expansion | $10,000 | 28 | 139 | 62 | 12 | ||||
Oswego |
Fulton Public Library | Reconstruction of sub-basement area to protect elevator and heating mechanicals room; construction of new staircase from sub-basement to basement. | $120,840 | 23 | 124 | 48 | 24 | Y | ||
Otsego |
Richfield Springs Public Library | Construction of 2nd floor addition to existing building. | $100,333 | 24 | 111 | 51 | 24 | Y | ||
Putnam |
Alice Curtis Desmond and Hamilton Fish Library | Renovations to existing building to increase energy-efficiency including installation of geothermal wells and solar panels | $250,000 | 19 | 90 | 40 | 30 | Y | Y | |
| Patterson Library | Construction of addition to existing library | $400,000 | 19 | 150 | 57 | 24 | Y | |||
Queens |
Queens Borough Public Library | Arverne | Extensive renovations to existing building | $1,830,000 | 6 | 31 | 14 | 24 | Y | |
| Astoria | Rehabilitation including waterproofing of building exterior | $1,800,000 | 14 | 36 | 12 | 24 | Y | |||
| Auburndale | Replacement of roof | $425,000 | 5 | 26 | 11 | 18 | Y | |||
| Bay Terrace | Replacement of roof | $425,000 | 5 | 26 | 16 | 18 | Y | |||
| Briarwood | Construction of state of the art, energy efficient silver LEED-certified expansion to existing library building; replacement of existing HVAC system | $8,000,000 | 6 | 27 | 14 | 36 | Y | Y | ||
| Broadway | Replacement of HVAC system | $403,000 | 14 | 30 | 12 | 18 | Y | |||
| Central | Extensive renovations to main floor of existing building; replacement of roof | $37,300,000 | 6 | 29 | 14 | 36 | Y | |||
| Central | Construction of new energy-efficient silver LEED-certified Children's Library Discovery Center | $40,700,000 | 6 | 29 | 14 | 36 | Y | Y | ||
| Central Data Center | Upgrading of electrical and technical capacities | $1,300,000 | 6 | 29 | 14 | 18 | Y | |||
| Corona, Glendale, Queens Village, Ridgewood, Maspeth | Renovations to existing buildings to bring into compliance with ADA | $885,000 | Various | Various | Various | 36 | ||||
| Douglaston | Construction of new, state of the art energy-efficient silver LEED-certified facility | $20,000,000 | 5 | 26 | 11 | 36 | Y | Y | ||
| East Elmhurst | Construction of energy-efficient silver LEED-certified expansion to existing library building | $3,200,000 | 7 | 35 | 13 | 36 | Y | Y | ||
| Elmhurst | Construction of new, state of the art energy-efficient silver LEED-certified facility | $26,000,000 | 5 | 26 | 11 | 36 | Y | Y | ||
| Far Rockaway | Construction of new, state of the art energy-efficient silver LEED-certified facility | $19,200,000 | 6 | 35 | 16 | 36 | Y | Y | ||
| Fresh Meadows | Replacement of roof | $525,000 | 9 | 24 | 16 | 18 | Y | |||
| Glen Oaks | Construction of new, state of the art energy-efficient silver LEED-certified facility | $15,000,000 | 5 | 24 | 11 | 36 | Y | Y | ||
| Glendale | Extensive building renovations including installation of elevator | $9,500,000 | 9 | 38 | 15 | 36 | ||||
| Hollis | Replacement of roof | $350,000 | 6 | 24 | 11 | 18 | Y | |||
| Jackson Heights | Construction of new, state of the art energy-efficient silver LEED-certified facility | $52,500,000 | 7 | 34 | 13 | 36 | Y | Y | ||
| Kew Gardens Hills | Extensive renovations and expansion of existing building including foundation work to support existing structure | $8,600,000 | 9 | 27 | 16 | 36 | Y | |||
| North Hills | Construction of new, state of the art energy-efficient silver LEED-certified building | $20,000,000 | 5 | 24 | 11 | 36 | Y | Y | ||
| North Hills | Replacement of roof on existing building | $330,000 | 5 | 24 | 11 | 18 | Y | |||
| Queens West | Construction of new, state of the art energy-efficient silver LEED-certified facility | $25,000,000 | 14 | 37 | 12 | 36 | Y | Y | ||
| Queensboro Hill | Renovation to bring building into compliance with ADA; replacement of roof | $1,480,000 | 5 | 22 | 16 | 30 | Y | |||
| Rego Park | Construction of new, state of the art energy-efficient silver LEED-certified facility | $23,300,000 | 9 | 28 | 16 | 36 | Y | Y | ||
| Rego Park | Purchase and installation of new, upgraded HVAC system and Building Management System | $460,000 | 9 | 28 | 16 | 36 | Y | |||
| Richmond Hill | Extensive renovations to existing building including installation of elevator | $5,000,000 | 6 | 27 | 10 | 36 | Y | |||
| Rochdale Village | Extensive renovations to existing building and construction of new addition; replacement of roof | $3,950,000 | 6 | 31 | 10 | 30 | Y | |||
| Rosedale | Replacement of HVAC system | $435,000 | 6 | 29 | 14 | 15 | Y | |||
| South Jamaica | Purchase and installation of new, upgraded HVAC system and Building Management System | $125,000 | 6 | 32 | 10 | 18 | Y | |||
| Steinway | Replacement of HVAC system | $159,000 | 14 | 36 | 12 | 15 | Y | |||
| Woodside | Rehabilitation including waterproofing of building exterior | $208,000 | 12 | 30 | 12 | 24 | Y | |||
Rensselaer |
Brunswick Community Library | Extensive renovations to interior and exterior of newly purchased building | $135,000 | 20 | 108 | 43 | 30 | Y | Y | |
| Rensselaer Public Library | Renovation (general construction components) of newly purchased library building (including upgraded energy-efficient electrical, plumbing, and heating/cooling systems) | $1,000,000 | 21 | 106 | 43 | 24 | Y | |||
| Stephentown Memorial Library | Construction of handicapped accessible deck area for community use; reconfiguration of existing building to create staff area | $22,000 | 20 | 112 | 43 | 15 | ||||
Rockland |
Nanuet Public Library | Demolition of existing building; construction of new state of the art, energy-efficient 40,000 square foot building | $19,500,000 | 17 | 94 | 38 | 48 | Y | ||
| New City Library | Replacement of HVAC system; installation of new circulation desk; renovations to lobby including replacement of flooring and lighting; new front entrance steps and handicap ramp; extensive renovations to meeting room including "green" lighting system | $884,500 | 18 | 94 | 38 | 24 | Y | Y | ||
| The Nyack Library | Construction of new, state of the art energy-efficient 15,000 square foot addition; extensive renovations to existing building including installation of geothermal wells | $9,627,500 | 17 | 95 | 38 | 36 | Y | Y | ||
| Valley Cottage Free Library | Complete reconfiguration of space to expand circulation desk area including a new loft area which will be accessed by a new staircase and lift; construction of a 1,600 square foot addition to create a new children's department area; construction of new covered walkway and vestibule | $1,350,000 | 17 | 94 | 38 | 36 | Y | Y | ||
| West Nyack Free Library | Replacement of HVAC system | $26,000 | 17 | 94 | 38 | 12 | Y | |||
Saratoga |
Southern Adirondack Library System | Replacement of roof | $140,000 | 20 | 110 | 43 | 15 | Y | Y | |
| Town of Ballston Community Library | Upgrade thermostats, replace weatherstripping in doors; replace track lights and install motion sensor lights in closets and bathrooms | $7,900 | 20 | 110 | 44 | 6 | Y | |||
| Womens Round Lake Improvement Society | Malta | Construction of new state of the art, energy-efficient 5,130 square foot branch library fully furnished with green materials | $1,420,148 | 20 | 112 | 43 | 30 | Y | Y | |
Schenectady |
Mohawk Valley Library System | Replacement of roof | $105,725 | 21 | 105 | 44 | 18 | Y | ||
Seneca |
Waterloo Library and Historical Society | Construction of handicapped access ramp; restoration of brick and limestone exterior walls | $144,888 | 24 | 129 | 54 | 24 | |||
St. Lawrence |
Canton Free Library | Morley Branch | Replacement of roof, windows and doors to increase energy-efficiency/energy conservation | $30,000 | 23 | 118 | 48 | 18 | Y | |
| Hammond Library | Extensive renovations to basement of existing library to make space usable; replacement of roof; construction of exterior ramp to comply with ADA specifications; replacement of hot water heater | $90,000 | 23 | 113 | 45 | 24 | Y | |||
| Hepburn Library of Norfolk | Renovations to make restroom wheelchair accessible | $20,000 | 23 | 122 | 47 | 12 | ||||
| Hepburn Library of Waddington | Restoration of building including new electrical and lighting systems; rehabilitation of exterior brick, stone, wood and windows; installation of insulation and ventilation in attic | $327,200 | 23 | 118 | 48 | 30 | Y | |||
| Potsdam Public Library | Installation of elevator in existing elevator shaft and additional floor stops; renovations to install ramps, walkways, fire doors, and walls to provide access to the second and third floors of the library | $185,000 | 23 | 118 | 47 | 24 | ||||
Steuben |
Dormann Library | Relocation of utilities, including sewer, water, and plumbing lines; expansion of parking lot. | $193,519 | 29 | 136 | 53 | 30 | Y | ||
| Southern Tier Library System | Installation of solar heating system including photovoltaic panels | $75,000 | 29 | 136 | 53 | 18 | Y | Y | ||
Suffolk |
Brentwood Public Library | Renovation of existing library building and construction of Arts Annex addition including self-service café, periodicals lounge, and art gallery to display works by local residents | $1,507,610 | 2 | 6 | 3 | 30 | Y | ||
| Central Islip Public Library | Construction of new 837 square foot storage building and renovation/reconfiguration of existing library building to create new Children's Activity Center, Quiet Study/Local History room, and Computer Lab | $2,128,394 | 2 | 6 | 3 | 36 | Y | |||
| Elwood Public Library | Extensive renovations of newly purchased building to transform into new library | $600,000 | 2 | 9 | 5 | 24 | Y | |||
| Half Hollow Hills Community Library | Replacement of boiler and air handler systems. | $664,243 | 2 | 92 | 35 | 12 | Y | |||
| North Babylon Public Library | Replacement of roof; installation of photovoltaic panels on roof | $573,000 | 3 | 8 | 4 | 24 | Y | Y | ||
| Sayville Library | Construction of new 38,000 square foot building (including geothermal heating and cooling and solar panels) | $14,432,711 | 2 | 5 | 3 | 30 | Y | Y | ||
| Suffolk Cooperative Library System | Removal of existing flooring in shipping area and replacement with 1/4" floor system; replacement of lighting in main office area; installation of new HVAC ductwork in original part of building | $150,000 | 1 | 3 | 7 | 12 | Y | |||
| Westhampton Free Library | Construction of new LEED-certified 14,250 square foot library (including geothermal heating system and photovoltaic system) | $7,827,820 | 1 | 2 | 1 | 36 | Y | Y | ||
Sullivan |
Daniel Pierce Public Library | Construction of 23,500 square foot state of the art, energy-efficient addition; extensive renovation of existing library building including installation of geothermal units | $5,044,500 | 22 | 98 | 42 | 36 | Y | Y | |
| Western Sullivan Public Library | Delware Free Branch | Restoration of windows to increase energy-efficiency in historic building | $19,500 | 22 | 98 | 42 | 18 | Y | ||
| Jeffersonville Branch | Replacement of HVAC system | $16,000 | 22 | 98 | 42 | 12 | Y | |||
| Tusten Cochecton Branch | Replacement of roof; replacement of front door; renovations to increase storage space | $30,575 | 22 | 98 | 42 | 18 | Y | |||
Tompkins |
Groton Public Library | Replacement of air conditioning system | $15,000 | 24 | 125 | 51 | 6 | Y | ||
Ulster |
Cragsmoor Free Library | Replacement of HVAC system; rehabilitation work on exterior of building including sealing and insulation upgrades for energy-efficiency; installation of energy-efficient lighting; rehabilitation work on 8 ft. windows in reading room (historic building) | $44,200 | 22 | 101 | 42 | 24 | Y | ||
| Highland Public Library | Construction of new, state of the art, energy-efficient library building | $3,000,000 | 22 | 100 | 39 | 36 | Y | Y | ||
| Marlboro Free Library | Construction of addition to double space of existing library | $4,400,000 | 22 | 100 | 39 | 36 | Y | |||
| Phoenicia Library | Construction of addition to double space of existing library | $900,000 | 22 | 101 | 42 | 24 | Y | |||
| Rosendale Library | Construction of addition to double space of existing library | $2,000,000 | 22 | 101 | 42 | 30 | Y | |||
| Saugerties Public Library | Construction of 8,000 square foot addition to historic library building and renovation of existing building | $7,437,608 | 22 | 127 | 42 | 36 | Y | Y | ||
| Stone Ridge Library | Construction of addition to double space of existing historic building | $3,500,000 | 22 | 101 | 42 | 30 | Y | |||
| The Gardiner Library | Construction of new 4,900 square foot library (including cupola monitor to increase natural lighting, economizers on heating and cooling elements to maximize efficiency, automatic light control, and high insulation factors on walls, windows, and entries) | $2,174,266 | 22 | 101 | 42 | 36 | Y | Y | ||
| Wallkill Public Library | Construction of new state of the art, energy-efficient 8,700 square foot addition to existing library building | $6,500,000 | 25 | 101 | 39 | 36 | Y | |||
| Woodstock Public Library District | Construction of addition to double space of existing library | $5,200,000 | 22 | 101 | 42 | 36 | Y | |||
Warren |
Stony Creek Free Library | Extensive renovations to existing library building and expansion into neighboring building including fully green building materials and LEED certification | $800,000 | 20 | 113 | 45 | 30 | Y | Y | |
Wayne |
Palmyra Kings Daughters Free Library | Extensive renovations to existing 12,000 square foot library building including installation of elevator and construction of addition to rear entry | $2,939,100 | 25 | 128 | 54 | 36 | Y | ||
Westchester |
Ardsley Public Library | Construction of 2,200 square foot addition to existing library | $1,324,690 | 18 | 92 | 35 | 30 | Y | ||
| Katonah Village Library | Renovation of 2 existing bathrooms to make them accessible; reconstruction of main floor including new electrical, lighting, ceiling, and flooring; purchase and installation of new shelving for newly reconstructed main floor; replacement of heating system boiler | $673,826 | 19 | 89 | 40 | 30 | Y | |||
| Larchmont Public Library | Reconstruction of 3,000 square foot children's room in library that will be LEED-certified (including upgraded energy-efficient HVAC and lighting) | $2,500,000 | 18 | 91 | 37 | 30 | Y | Y | ||
| Mount Kisco Public Library | Construction of new 18,500 square foot building (including energy-efficient lighting and geothermal HVAC system) | $9,656,306 | 19 | 89 | 40 | 36 | Y | Y | ||
| New Rochelle Public Library | Replacement of Cooling Tower and HVAC system | $150,000 | 18 | 91 | 37 | 15 | Y | |||
| Somers Library | Replacement of HVAC system | $145,000 | 19 | 99 | 40 | 15 | Y | |||
Wyoming |
Stevens Memorial Community Library | Construction of new rear entrance including passive solar windows and solar panels; replacement of windows with energy-efficient units; replacement of siding and roof; reconfiguration of interior layout | $500,000 | 26 | 147 | 59 | 30 | Y | Y | |
Yates |
Penn Yan Public Library | Construction of new, accessible vestibule and sidewalk from vestibule to existing sidewalk; sealing off of secondary entrance; reconfiguration of space to create new program room; renovation of 2 bathrooms to make them accessible | $173,717 | 29 | 136 | 53 | 24 | Y | ||
Total: |
$1,399,184,916 |
|||||||||