Congressional
District |
Library/
Library Building |
Branch Name |
Description |
Total Cost |
County |
Construction Duration
(in months) |
Green Project |
Energy Efficiency/
Cost
Savings |
1 |
Suffolk Cooperative Library System |
|
Removal of existing flooring in shipping area and replacement with 1/4" floor system; replacement of lighting in main office area; installation of new HVAC ductwork in original part of building |
$150,000 |
Suffolk |
12 |
|
Y |
| Westhampton Free Library |
|
Construction of new LEED-certified 14,250 square foot library (including geothermal heating system and photovoltaic system) |
$7,827,820 |
Suffolk |
36 |
Y |
Y |
2 |
Brentwood Public Library |
|
Renovation of existing library building and construction of Arts Annex addition including self-service café, periodicals lounge, and art gallery to display works by local residents |
$1,507,610 |
Suffolk |
30 |
|
Y |
| Central Islip Public Library |
|
Construction of new 837 square foot storage building and renovation/reconfiguration of existing library building to create new Children's Activity Center, Quiet Study/Local History room, and Computer Lab |
$2,128,394 |
Suffolk |
36 |
|
Y |
| Elwood Public Library |
|
Extensive renovations of newly purchased building to transform into new library |
$600,000 |
Suffolk |
24 |
|
Y |
| Half Hollow Hills Community Library |
|
Replacement of boiler and air handler systems. |
$664,243 |
Suffolk |
12 |
|
Y |
| Sayville Library |
|
Construction of new 38,000 square foot building (including geothermal heating and cooling and solar panels) |
$14,432,711 |
Suffolk |
30 |
Y |
Y |
3 |
Bayville Free Library |
|
Construction of 1,750 square foot expansion to existing library; extensive renovations to 2nd floor of existing library |
$697,500 |
Nassau |
36 |
|
Y |
| Farmingdale Public Library |
|
Extensive building renovations including installation of new, energy efficient lighting fixtures and energy control dimming system and sensor system |
$2,100,000 |
Nassau |
24 |
|
Y |
| North Babylon Public Library |
|
Replacement of roof; installation of photovoltaic panels on roof |
$573,000 |
Suffolk |
24 |
Y |
Y |
| North Merrick Public Library |
|
Extensive renovations to existing library building; construction of addition to create community room; installation of photovoltaic panels |
$6,750,000 |
Nassau |
36 |
Y |
Y |
4 |
East Meadow Public Library |
|
Replacement of HVAC; installation of complete energy management system for entire building |
$129,400 |
Nassau |
12 |
|
Y |
| East Rockaway Public Library |
|
Installation of photovoltaic panels; rehabilitation of building exterior |
$250,000 |
Nassau |
24 |
|
Y |
| Freeport Memorial Library |
|
Asbestos removal, reconstruction and new flooring, shelving, and furniture for children's room; reconstruction of circulation desk including floor adjustments and new electrical system |
$219,025 |
Nassau |
24 |
|
Y |
| Lynbrook Public Library |
|
Rehabilitation of damaged flooring including replacement of carpet |
$98,000 |
Nassau |
9 |
|
|
| Nassau Library System |
|
Construction of new meeting rooms and computer center; renovations including new entrance and handicap accessible restrooms |
$700,000 |
Nassau |
18 |
|
Y |
| Peninsula Public Library |
|
Construction of single lane driveway on west side of library building; reconstruction of existing parking lot |
$177,000 |
Nassau |
15 |
|
|
| Roosevelt Public Library |
|
Excavation of building foundation and construction of new lower level and addition to existing building |
$8,500,000 |
Nassau |
36 |
|
N |
5 |
Queens Borough Public Library |
Auburndale |
Replacement of roof |
$425,000 |
Queens |
18 |
|
Y |
| Bay Terrace |
Replacement of roof |
$425,000 |
Queens |
18 |
|
Y |
| Douglaston |
Construction of new, state of the art energy-efficient silver LEED-certified facility |
$20,000,000 |
Queens |
36 |
Y |
Y |
| Elmhurst |
Construction of new, state of the art energy-efficient silver LEED-certified facility |
$26,000,000 |
Queens |
36 |
Y |
Y |
| Glen Oaks |
Construction of new, state of the art energy-efficient silver LEED-certified facility |
$15,000,000 |
Queens |
36 |
Y |
Y |
| North Hills |
Construction of new, state of the art energy-efficient silver LEED-certified building |
$20,000,000 |
Queens |
36 |
Y |
Y |
| North Hills |
Replacement of roof on existing building |
$330,000 |
Queens |
18 |
|
Y |
| Queensboro Hill |
Renovation to bring building into compliance with ADA; replacement of roof |
$1,480,000 |
Queens |
30 |
|
Y |
| Shelter Rock Public Library |
|
Replacement of 8 rooftop HVAC units |
$134,000 |
Nassau |
12 |
Y |
Y |
6 |
Queens Borough Public Library |
Arverne |
Extensive renovations to existing building |
$1,830,000 |
Queens |
24 |
|
Y |
| Briarwood |
Construction of state of the art, energy efficient silver LEED-certified expansion to existing library building; replacement of existing HVAC system |
$8,000,000 |
Queens |
36 |
Y |
Y |
| Central |
Extensive renovations to main floor of existing building; replacement of roof |
$37,300,000 |
Queens |
36 |
|
Y |
| Central |
Construction of new energy-efficient silver LEED-certified Children's Library Discovery Center |
$40,700,000 |
Queens |
36 |
Y |
Y |
| Central Data Center |
Upgrading of electrical and technical capacities |
$1,300,000 |
Queens |
18 |
|
Y |
| Far Rockaway |
Construction of new, state of the art energy-efficient silver LEED-certified facility |
$19,200,000 |
Queens |
36 |
Y |
Y |
| Hollis |
Replacement of roof |
$350,000 |
Queens |
18 |
|
Y |
| Richmond Hill |
Extensive renovations to existing building including installation of elevator |
$5,000,000 |
Queens |
36 |
|
Y |
| Rochdale Village |
Extensive renovations to existing building and construction of new addition; replacement of roof |
$3,950,000 |
Queens |
30 |
|
Y |
| Rosedale |
Replacement of HVAC system |
$435,000 |
Queens |
15 |
|
Y |
| South Jamaica |
Purchase and installation of new, upgraded HVAC system and Building Management System |
$125,000 |
Queens |
18 |
|
Y |
7 |
Queens Borough Public Library |
East Elmhurst |
Construction of energy-efficient silver LEED-certified expansion to existing library building |
$3,200,000 |
Queens |
36 |
Y |
Y |
| Jackson Heights |
Construction of new, state of the art energy-efficient silver LEED-certified facility |
$52,500,000 |
Queens |
36 |
Y |
Y |
9 |
Queens Borough Public Library |
Fresh Meadows |
Replacement of roof |
$525,000 |
Queens |
18 |
|
Y |
| Glendale |
Extensive building renovations including installation of elevator |
$9,500,000 |
Queens |
36 |
|
|
| Kew Gardens Hills |
Extensive renovations and expansion of existing building including foundation work to support existing structure |
$8,600,000 |
Queens |
36 |
|
Y |
| Rego Park |
Construction of new, state of the art energy-efficient silver LEED-certified facility |
$23,300,000 |
Queens |
36 |
Y |
Y |
| Rego Park |
Purchase and installation of new, upgraded HVAC system and Building Management System |
$460,000 |
Queens |
36 |
|
Y |
11 |
Brooklyn Public Library |
Central |
Complete interior and exterior rehabilitation including replacement of windows, roof, HVAC, and electrical system |
$51,000,000 |
Kings |
48 |
|
Y |
| Kensington |
Construction of new state of the art, energy-efficient green library building |
$18,000,000 |
Kings |
36 |
Y |
Y |
| Park Slope |
Replacement of HVAC system |
$2,000,000 |
Kings |
18 |
|
Y |
12 |
Queens Borough Public Library |
Woodside |
Rehabilitation including waterproofing of building exterior |
$208,000 |
Queens |
24 |
|
Y |
14 |
Queens Borough Public Library |
Astoria |
Rehabilitation including waterproofing of building exterior |
$1,800,000 |
Queens |
24 |
|
Y |
| Broadway |
Replacement of HVAC system |
$403,000 |
Queens |
18 |
|
Y |
| Queens West |
Construction of new, state of the art energy-efficient silver LEED-certified facility |
$25,000,000 |
Queens |
36 |
Y |
Y |
| Steinway |
Replacement of HVAC system |
$159,000 |
Queens |
15 |
|
Y |
| New York Public Library |
Central Branch |
Complete transformation of Research Library at 5th Avenue and 42nd st. The scope of this project will include infrastructure replacement, façade restoration, incorporation of energy-efficient technologies and increased broadband accessibility. Expansion of public space will include a new circulating library including additional book storage |
$280,000,000 |
New York |
48 |
|
Y |
17 |
Nanuet Public Library |
|
Demolition of existing building; construction of new state of the art, energy-efficient 40,000 square foot building |
$19,500,000 |
Rockland |
48 |
|
Y |
| The Nyack Library |
|
Construction of new, state of the art energy-efficient 15,000 square foot addition; extensive renovations to existing building including installation of geothermal wells |
$9,627,500 |
Rockland |
36 |
Y |
Y |
| Valley Cottage Free Library |
|
Complete reconfiguration of space to expand circulation desk area including a new loft area which will be accessed by a new staircase and lift; construction of a 1,600 square foot addition to create a new children's department area; construction of new covered walkway and vestibule |
$1,350,000 |
Rockland |
36 |
Y |
Y |
| West Nyack Free Library |
|
Replacement of HVAC system |
$26,000 |
Rockland |
12 |
|
Y |
18 |
Ardsley Public Library |
|
Construction of 2,200 square foot addition to existing library |
$1,324,690 |
Westchester |
30 |
|
Y |
| Larchmont Public Library |
|
Reconstruction of 3,000 square foot children's room in library that will be LEED-certified (including upgraded energy-efficient HVAC and lighting) |
$2,500,000 |
Westchester |
30 |
Y |
Y |
| New City Library |
|
Replacement of HVAC system; installation of new circulation desk; renovations to lobby including replacement of flooring and lighting; new front entrance steps and handicap ramp; extensive renovations to meeting room including "green" lighting system |
$884,500 |
Rockland |
24 |
Y |
Y |
| New Rochelle Public Library |
|
Replacement of Cooling Tower and HVAC system |
$150,000 |
Westchester |
15 |
|
Y |
| White Plains Public Library |
|
Renovation of all public bathrooms for more efficient plumbing and wheelchair accessibility |
$275,000 |
Essex |
24 |
|
|
19 |
Albert Wisner Public Library |
|
Construction of new 20,000 square foot library building (including geothermal heating system and solar glazed windows and doors) |
$8,950,000 |
Orange |
36 |
Y |
Y |
| Alice Curtis Desmond and Hamilton Fish Library |
|
Renovations to existing building to increase energy-efficiency including installation of geothermal wells and solar panels |
$250,000 |
Putnam |
30 |
Y |
Y |
| Howland Public Library (Beacon) |
|
Construction of addition to double space of existing library |
$10,000,000 |
Dutchess |
36 |
|
Y |
| Katonah Village Library |
|
Renovation of 2 existing bathrooms to make them accessible; reconstruction of main floor including new electrical, lighting, ceiling, and flooring; purchase and installation of new shelving for newly reconstructed main floor; replacement of heating system boiler |
$673,826 |
Westchester |
30 |
|
Y |
| Mount Kisco Public Library |
|
Construction of new 18,500 square foot building (including energy-efficient lighting and geothermal HVAC system) |
$9,656,306 |
Westchester |
36 |
Y |
Y |
| Patterson Library |
|
Construction of addition to existing library |
$400,000 |
Putnam |
24 |
|
Y |
| Port Jervis Free Library |
|
Replacement of mechanical and electrical systems |
$515,000 |
Orange |
24 |
|
Y |
| Somers Library |
|
Replacement of HVAC system |
$145,000 |
Westchester |
15 |
|
Y |
| Tuxedo Park Library |
|
Extensive renovations to existing building to increase energy-efficiency |
$49,000 |
Orange |
18 |
|
Y |
20 |
Amenia Free Library |
|
Construction of addition to double space of existing library |
$1,000,000 |
Dutchess |
30 |
|
Y |
| Beekman Library |
|
Construction of addition to double space of existing library |
$400,000 |
Dutchess |
30 |
|
Y |
| Brunswick Community Library |
|
Extensive renovations to interior and exterior of newly purchased building |
$135,000 |
Rensselaer |
30 |
Y |
Y |
| Cairo Public Library |
|
Construction of new, state of the art, energy-efficient library building |
$3,500,000 |
Greene |
36 |
|
Y |
| Claverack Free Library |
|
Construction of addition to double space of existing library; renovations to existing space to make building handicap accessible |
$1,000,000 |
Columbia |
30 |
|
Y |
| Elizabethtown Library Association |
|
Replacement and reframing of door and replacement of building's historically significant windows |
$11,250 |
Essex |
30 |
|
Y |
| Haines Falls Free Library |
|
Replacement of roof, doors, and windows in newly purchased building |
$2,850,000 |
Greene |
30 |
|
Y |
| Hudson Area Association Library |
|
Extensive renovations to historic building |
$8,000,000 |
Columbia |
36 |
|
Y |
| Kinderhook Memorial Library |
|
Construction of addition to double space of existing library |
$2,000,000 |
Columbia |
30 |
|
Y |
| Pine Plains Library |
|
Construction of new library including installation of geothermal wells |
$2,100,000 |
Dutchess |
30 |
Y |
Y |
| Pleasant Valley Free Library |
|
Construction of addition to double space of existing library |
$2,500,000 |
Dutchess |
30 |
|
Y |
| Red Hook Public Library |
|
Construction of three-story addition to rear of building |
$210,000 |
Dutchess |
24 |
|
Y |
| Roeliff Jansen Community Library |
|
Construction of new, energy-efficient green 7,500 square foot library building with LEED certification |
$2,078,500 |
Columbia |
30 |
Y |
Y |
| Southern Adirondack Library System |
|
Replacement of roof |
$140,000 |
Saratoga |
15 |
Y |
Y |
| Staatsburg Library |
|
Construction of addition to double space of existing library |
$500,000 |
Dutchess |
30 |
|
Y |
| Stephentown Memorial Library |
|
Construction of handicapped accessible deck area for community use; reconfiguration of existing building to create staff area |
$22,000 |
Rensselaer |
15 |
|
|
| Stony Creek Free Library |
|
Extensive renovations to existing library building and expansion into neighboring building including fully green building materials and LEED certification |
$800,000 |
Warren |
30 |
Y |
Y |
| Town of Ballston Community Library |
|
Upgrade thermostats, replace weatherstripping in doors; replace track lights and install motion sensor lights in closets and bathrooms |
$7,900 |
Saratoga |
6 |
|
Y |
| Valatie Free Library |
|
Extensive renovations of newly purchased library building |
$250,000 |
Columbia |
24 |
|
Y |
| Woman's Round Lake Improvement Society |
Malta |
Construction of new state of the art, energy-efficient 5,130 square foot branch library fully furnished with green materials |
$1,420,148 |
Saratoga |
30 |
Y |
Y |
21 |
Albany Public Library |
Arbor Hill Branch |
Construction of new 12,000 square foot branch library (including geothermal wells) |
$5,715,745 |
Albany |
36 |
Y |
Y |
| Delaware Branch |
Total renovation/rehabilitation and major energy-efficiency upgrades |
$4,728,074 |
Albany |
36 |
Y |
Y |
| Howe Branch |
Total renovation/rehabilitation and major energy-efficiency upgrades |
$5,242,637 |
Albany |
36 |
Y |
Y |
| New Scotland Branch |
Total renovation/rehabilitation and major energy-efficiency upgrades |
$4,048,580 |
Albany |
36 |
Y |
Y |
| Pine Hills Branch |
Total renovation/rehabilitation and major energy-efficiency upgrades |
$4,784,437 |
Albany |
36 |
Y |
Y |
| Altamont Free Library |
|
Extensive renovations to Altamont Train Station for use as a library |
$500,000 |
Albany |
24 |
|
Y |
| Bethlehem Public Library |
|
Expansion and reconstruction of existing parking lot including rerouting of access to and egress from lot; new covered shelter for passenger dropoff and pickup; new walkways and crosswalks from parking to library building |
$460,034 |
Albany |
18 |
|
|
| Cohoes Public Library |
|
Replacement of lighting fixtures with energy-efficient units |
$75,000 |
Albany |
12 |
|
Y |
| Guilderland Public Library |
|
Reconfigure existing space to enlarge the Community Room and Children's area, relocate and enlarge the Technology Dept., and create a new community room/local history area; relocate all sewer lines |
$1,100,000 |
Albany |
24 |
|
|
| Mohawk Valley Library System |
|
Replacement of roof |
$105,725 |
Schenectady |
18 |
|
Y |
| New Lebanon Library |
|
Construction of 880 square foot addition including a kitchenette facility and purchase of furniture and equipment |
$331,431 |
Columbia |
30 |
|
Y |
| Rensselaer Public Library |
|
Renovation (general construction components) of newly purchased library building (including upgraded energy-efficient electrical, plumbing, and heating/cooling systems) |
$1,000,000 |
Rensselaer |
24 |
|
Y |
| Rensselaerville Public Library |
|
Replacement of siding; rehabilitation of roof; reconfiguration of basement space to use as storage and work area |
$37,850 |
Albany |
15 |
|
Y |
22 |
Cragsmoor Free Library |
|
Replacement of HVAC system; rehabilitation work on exterior of building including sealing and insulation upgrades for energy-efficiency; installation of energy-efficient lighting; rehabilitation work on 8 ft. windows in reading room (historic building) |
$44,200 |
Ulster |
24 |
|
Y |
| Daniel Pierce Public Library |
|
Construction of 23,500 square foot state of the art, energy-efficient addition; extensive renovation of existing library building including installation of geothermal units |
$5,044,500 |
Sullivan |
36 |
Y |
Y |
| Greater Poughkeepsie Library District |
|
Construction of a new 19,000 square foot four-floor expansion |
$15,086,260 |
Dutchess |
36 |
|
Y |
| Highland Public Library |
|
Construction of new, state of the art, energy-efficient library building |
$3,000,000 |
Ulster |
36 |
Y |
Y |
| Marlboro Free Library |
|
Construction of addition to double space of existing library |
$4,400,000 |
Ulster |
36 |
|
Y |
| Mid-Hudson Library System |
|
Renovations to existing building to increase energy-efficiency including installation of solar panels |
$500,000 |
Dutchess |
24 |
|
Y |
| Phoenicia Library |
|
Construction of addition to double space of existing library |
$900,000 |
Ulster |
24 |
|
Y |
| Pine Bush Area Public Library |
|
Replacement of HVAC system; replacement of roof; construction of new, state of the art energy-efficient 300 square foot addition |
$175,000 |
Orange |
30 |
|
Y |
| Ramapo Catskill Library System |
|
Demolition of building adjacent to system headquarters including asbestos abatement; construction of new parking lot |
$173,504 |
Orange |
18 |
|
|
| Rosendale Library |
|
Construction of addition to double space of existing library |
$2,000,000 |
Ulster |
30 |
|
Y |
| Saugerties Public Library |
|
Construction of 8,000 square foot addition to historic library building and renovation of existing building |
$7,437,608 |
Ulster |
36 |
Y |
Y |
| Stone Ridge Library |
|
Construction of addition to double space of existing historic building |
$3,500,000 |
Ulster |
30 |
|
Y |
| The Gardiner Library |
|
Construction of new 4,900 square foot library (including cupola monitor to increase natural lighting, economizers on heating and cooling elements to maximize efficiency, automatic light control, and high insulation factors on walls, windows, and entries) |
$2,174,266 |
Ulster |
36 |
Y |
Y |
| Western Sullivan Public Library |
Delware Free Branch |
Restoration of windows to increase energy-efficiency in historic building |
$19,500 |
Sullivan |
18 |
|
Y |
| Jeffersonville Branch |
Replacement of HVAC system |
$16,000 |
Sullivan |
12 |
|
Y |
| Tusten Cochecton Branch |
Replacement of roof; replacement of front door; renovations to increase storage space |
$30,575 |
Sullivan |
18 |
|
Y |
| Woodstock Public Library District |
|
Construction of addition to double space of existing library |
$5,200,000 |
Ulster |
36 |
|
Y |
23 |
Canton Free Library |
Morley Branch |
Replacement of roof, windows and doors to increase energy-efficiency/energy conservation |
$30,000 |
St. Lawrence |
18 |
|
Y |
| Cape Vincent Community Library |
|
Replacement of roof; renovations to make front entrance handicap accessible |
$25,000 |
Jefferson |
18 |
|
Y |
| Carthage Free Library |
|
Renovations to make building fully accessible, including installation of an elevator; construction of building addition; expansion of parking lot |
$300,000 |
Jefferson |
30 |
|
Y |
| Clinton Essex Franklin Library System |
|
Replacement of front steps and railing; reconstruction of collapsing driveway |
$25,000 |
Clinton |
15 |
|
|
| DeRuyter Free Library |
|
Asbestos abatement in basement; construction of addition to house elevator and egress stairs; installation of elevator |
$235,343 |
Madison |
30 |
|
Y |
| Dodge Memorial Library |
|
Replacement of existing library's portico |
$30,000 |
Clinton |
9 |
|
|
| Fulton Public Library |
|
Reconstruction of sub-basement area to protect elevator and heating mechanicals room; construction of new staircase from sub-basement to basement. |
$120,840 |
Oswego |
24 |
|
Y |
| Hammond Library |
|
Extensive renovations to basement of existing library to make space usable; replacement of roof; construction of exterior ramp to comply with ADA specifications; replacement of hot water heater |
$90,000 |
St. Lawrence |
24 |
|
Y |
| Hepburn Library of Norfolk |
|
Renovations to make restroom wheelchair accessible |
$20,000 |
St. Lawrence |
12 |
|
|
| Hepburn Library of Waddington |
|
Restoration of building including new electrical and lighting systems; rehabilitation of exterior brick, stone, wood and windows; installation of insulation and ventilation in attic |
$327,200 |
St. Lawrence |
30 |
|
Y |
| Jervis Public Library |
|
Reconstruction of 4 chimneys and adjacent roof slates on historic library building |
$145,020 |
Oneida |
24 |
|
|
| Mooers Free Library |
|
Installation of insulation in attic of existing library building and replacement of 4 windows |
$5,000 |
Clinton |
15 |
|
Y |
| Northville Public Library |
|
Installation of elevator lift; reconstruction of 2nd floor including structural modifications to create open meeting room and kitchenette; installation of new windows and zoned HVAC; Renovation of the basement including new lighting and electrical outlets, new ventilation, new interior stairs and painting |
$316,591 |
Fulton |
30 |
|
Y |
| Peru Free Library |
|
Replacement of furnace, front sidewalk, and roof; installation of solar panels |
$134,582 |
Clinton |
24 |
Y |
Y |
| Plattsburgh Public Library |
|
Conversion to electric heat and installation of solar panels |
$375,000 |
Clinton |
24 |
Y |
Y |
| Potsdam Public Library |
|
Installation of elevator in existing elevator shaft and additional floor stops; renovations to install ramps, walkways, fire doors, and walls to provide access to the second and third floors of the library |
$185,000 |
St. Lawrence |
24 |
|
|
| The Wead Library |
|
Purchase and installation of 40 windows with e-4 insulated glass window |
$40,000 |
Franklin |
15 |
|
Y |
24 |
C. W. Clark Memorial Library |
|
Construction of an 1,100 square foot 2 story addition to existing library; purchase of new shelving. |
$153,008 |
Oneida |
24 |
|
Y |
| Groton Public Library |
|
Replacement of air conditioning system |
$15,000 |
Tompkins |
6 |
|
Y |
| Ilion Free Public Library |
|
Installation of new HVAC system and new electrical; reconstruction of existing space to create new circulation/reference area and new meeting room |
$264,200 |
Herkimer |
30 |
|
Y |
| Moore Memorial Library |
|
Construction of 17,470 square foot state of the art, energy-efficient expansion |
$3,500,000 |
Chenango |
36 |
Y |
Y |
| New Berlin Library |
|
Replacement of windows |
$8,500 |
Chenango |
18 |
|
Y |
| Oxford Memorial Library |
|
Construction of 1,100 square foot addition including installation of a chair lift, bathroom, and full basement for storage |
$419,240 |
Chenango |
30 |
|
Y |
| Peck Memorial Library |
|
Restoration of entire exterior of existing brick building; replacement of windows with energy-efficient units |
$218,000 |
Cortland |
24 |
|
Y |
| Richfield Springs Public Library |
|
Construction of 2nd floor addition to existing building. |
$100,333 |
Otsego |
24 |
|
Y |
| Waterloo Library and Historical Society |
|
Construction of handicapped access ramp; restoration of brick and limestone exterior walls |
$144,888 |
Seneca |
24 |
|
|
25 |
Fayetteville Free Library |
|
Renovations to existing building to create Business Center, Café, and Performance Space |
$841,057 |
Onondaga |
30 |
|
Y |
| Onondaga County Public Library |
Beauchamp Branch |
Replacement of roof |
$134,195 |
Onondaga |
15 |
|
Y |
| Betts Branch |
Replacement of HVAC |
$122,714 |
Onondaga |
15 |
|
Y |
| Hazard Branch |
Replacement of HVAC system including asbestos removal |
$255,000 |
Onondaga |
18 |
|
Y |
| Mundy Branch |
Replacement of roof |
$115,025 |
Onondaga |
15 |
|
Y |
| Paine Branch |
Replacement of HVAC system including asbestos removal |
$115,000 |
Onondaga |
18 |
|
Y |
| Soule Branch |
Replacement of HVAC |
$154,271 |
Onondaga |
15 |
|
Y |
| Onondaga Free Library |
|
Construction of 20,000 square foot state of the art, energy-efficient expansion and extensive renovations to existing building |
$3,200,000 |
Onondaga |
36 |
|
Y |
| Palmyra Kings Daughters Free Library |
|
Extensive renovations to existing 12,000 square foot library building including installation of elevator and construction of addition to rear entry |
$2,939,100 |
Wayne |
36 |
|
Y |
| Wallkill Public Library |
|
Construction of new state of the art, energy-efficient 8,700 square foot addition to existing library building |
$6,500,000 |
Ulster |
36 |
|
Y |
26 |
Amherst Public Library |
Main Branch |
Replacement of roof over original part of building. |
$295,000 |
Erie |
18 |
|
Y |
| Byron-Bergen Free Library |
Gillam-Grant Community Center |
Replacement of windows with energy-efficient units |
$28,000 |
Genesee |
12 |
|
Y |
| Byron-Bergen Free Library |
|
Extensive interior renovations of library building |
$100,000 |
Genesee |
24 |
|
Y |
| Community Free Library |
|
Merging of newly purchased building with adjacent existing library; demolition of common non-bearing walls; reconstruction and renovation of new "addition." |
$111,800 |
Orleans |
24 |
|
Y |
| Corfu Free Library |
|
Renovation of interior of new addition |
$18,800 |
Genesee |
18 |
|
Y |
| Dansville Public Library |
|
Construction of new state of the art, energy-efficient 7,200 square foot addition to existing building |
$2,800,000 |
Livingston |
18 |
|
Y |
| Farmers Library Company of Ogden |
|
Construction of energy-efficient addition to existing library |
$2,000,000 |
Monroe |
30 |
|
Y |
| Haxton Memorial Library |
|
Replacement of windows with energy-efficient units |
$29,000 |
Genesee |
15 |
|
Y |
| Lancaster Public Library |
|
Resurfacing of existing concrete floor and replacement of deteriorated carpet |
$34,144 |
Erie |
15 |
|
|
| Lee Whedon Memorial Library |
|
Acquisition of site and construction of new, state of the art, energy-efficient library building |
$920,000 |
Orleans |
30 |
Y |
Y |
| Lima Public Library |
|
Construction of 500 square foot addition. |
$196,510 |
Livingston |
24 |
Y |
Y |
| Lockport Public Library |
|
Replacement of lighting with energy-efficient units; replacement of HVAC; installation of security gates with people counters; replacement of 21 windows; expansion to meeting room, children's room and storage area |
$44,500 |
Niagara |
24 |
|
Y |
| Middleport Public Library |
|
Extensive renovations to interior of existing building |
$28,000 |
Niagara |
18 |
|
Y |
| Nioga Library System |
|
Replacement of 3 air conditioning units; replacement of rooft; installation of 8 wind turbines; construction of 400 square foot addition to house computer equipment; rehabilitation of parking lot; repairs to exterior of original building; construction of handicap accessible entrance |
$852,500 |
Niagara |
36 |
Y |
Y |
| North Tonawanda Public Library |
|
Reconstruction of existing space to create new floor plan in library; purchase of furniture and carpeting for newly renovated space; rehabilitation of parking lot; upgrade to HVAC |
$155,116 |
Niagara |
30 |
|
|
| Pavilion Public Library |
|
Reconfiguration of current circulation area |
$26,500 |
Genesee |
15 |
|
|
| Richmond Memorial Library |
|
Renovations to make existing building handicap accessible; replacement of sidewalk; renovation of storage building |
$108,500 |
Genesee |
24 |
|
|
| Stevens Memorial Community Library |
|
Construction of new rear entrance including passive solar windows and solar panels; replacement of windows with energy-efficient units; replacement of siding and roof; reconfiguration of interior layout |
$500,000 |
Wyoming |
30 |
Y |
Y |
| Swan Library |
|
Acquisition of site and construction of new 28,000 square foot state of the art energy-efficient library building |
$4,000,000 |
Orleans |
36 |
|
Y |
| Woodward Memorial Library |
|
Installation of central air conditioning throughout existing library building; installation of energy-efficient window coverings |
$111,000 |
Genesee |
24 |
|
Y |
27 |
Angola Public Library |
|
Construction of 1,138 square foot energy-efficient addition to provide public meeting and children's programming space |
$275,769 |
Erie |
30 |
|
Y |
| Ashville Free Library |
|
Replacement of roof and windows; extensive renovations to second floor of existing building |
$64,400 |
Chautauqua |
24 |
|
Y |
| Aurora Town Public Library |
|
Replace lighting with new, state of the art, energy-efficient lighting system; replacement of front entry doors with energy-efficient, ADA compliant units |
$18,000 |
Erie |
12 |
|
Y |
| Buffalo & Erie County Public Library |
Crane Branch |
Replacement of lighting, windows, roof, and ceiling tiles with energy-efficiency upgrades |
$140,000 |
Erie |
24 |
|
Y |
| Dudley Branch |
Replacement of lighting and windows with energy-efficiency upgrades; replacement of existing floor to incorporate new wiring and electrical for connectivity and computer terminals |
$130,000 |
Erie |
24 |
|
Y |
| East Clinton Branch |
Replacement of lighting with new, energy-efficient lighting system; replacement of existing floor to incorporate new wiring and electrical for connectivity and computer terminals |
$110,000 |
Erie |
24 |
|
Y |
| Niagara Branch |
Replacement of lighting with energy-efficient lighting system; replacement of existing floor to incorporate wiring and electrical for connectivity and computer terminals; replacement of boiler with geothermal wells |
$260,000 |
Erie |
30 |
Y |
Y |
| Riverside Branch |
Replacement of lighting with energy-efficient lighting system; replacement of roof and ceiling tiles to improve energy conservation |
$70,000 |
Erie |
18 |
|
Y |
| Cheektowaga Public Library |
Anna M. Reinstein Memorial Library |
Total rehabilitation of parking lot |
$15,500 |
Erie |
12 |
|
|
| Main Library |
Total rehabilitation of parking lot |
$4,055 |
Erie |
12 |
|
|
| Ewell Free Library |
|
Replacement of HVAC system on upper floor of building with energy efficient equipment; installation of energy efficient air conditioning equipment in basement meeting area |
$30,250 |
Erie |
24 |
|
Y |
| Falconer Public Library |
|
Replacement of HVAC and lighting systems in historic building; renovations to make basement handicap accessible |
$100,000 |
Chautauqua |
24 |
Y |
Y |
| Geneva Public Library |
|
Renovation of 2nd floor in existing library building; replacement of BAC evaporative cooling tower |
$83,274 |
Ontario |
4 |
|
Y |
| James Prendergast Library Association |
|
Construction of 6,615 square foot addition to existing building; replacement of HVAC system, windows and roof; installation of electric lines and computer cables in concrete slab foundation; removal and replacement of existing carpet and floor tiles including asbestos abatement |
$4,422,027 |
Chautauqua |
36 |
|
Y |
| Kennedy Free Library |
|
Construction of new state of the art, energy-efficient "green" library building |
$2,500,000 |
Chautauqua |
36 |
Y |
Y |
| Lakewood Memorial Library |
|
Reconstruction/reconfiguration of existing space to create new Director's office and staff workroom, circulation area, computer area, and stacks; replacement of interior lights and windows; new ceiling; furnishings for newly configured area |
$154,789 |
Chautauqua |
30 |
|
Y |
| Marilla Free Library |
|
Reconfiguration of existing 3,400 square foot library to create more economical use of space including the expansion of the library's Employment/Education Resource Center |
$12,000 |
Erie |
18 |
|
|
| Town of Collins Public Library |
|
Installation of electric door openers to make front entry doors ADA compliant |
$5,000 |
Erie |
6 |
|
|
28 |
Barker Free Library |
|
Extensive rehabilitation of interior and exterior of existing building |
$20,000 |
Niagara |
18 |
|
Y |
| Buffalo & Erie County Public Library |
Central Library |
Extensive renovations of library building including installation of elevators to replace energy inefficient escalators, asbestos abatement, modification of generators to allow alternative fuel use |
$16,687,371 |
Erie |
36 |
|
Y |
| East Delavan Branch |
Replacement of lighting with energy-efficiency lighting system; installation of new, energy-efficient, ADA compliant front door |
$37,000 |
Erie |
15 |
|
Y |
| City of Tonawanda |
|
Replacement of HVAC system; rehabilitation of the library's exterior walls |
$165,000 |
Erie |
24 |
|
Y |
| Lewiston Public Library |
|
Replacement of doors with energy-efficient units; installation of energy-efficient window films; installation of energy-efficient motion sensor lighting |
$19,500 |
Niagara |
18 |
|
Y |
| Newfane Free Library |
|
Replacement of windows and doors with energy-efficient units; replacement of siding; rehabilitation of parking lot |
$24,000 |
Niagara |
24 |
|
Y |
| Niagara Falls Public Library |
LaSalle Branch |
Rehabilitation of historic windows throughout building; installation of new exterior storm windows; installation of ductless air conditioning units |
$264,756 |
Niagara |
30 |
|
Y |
|
Replacement of 54 windows; upgrade to air conditioning |
$318,000 |
Niagara |
30 |
|
Y |
| Ransomville Free Library |
|
Construction of new 480 square foot building to store and preserve historical items |
$125,000 |
Niagara |
30 |
|
Y |
| Rochester Public Library |
10 Branches |
Comprehensive branch upgrade package including construction of building additions, upgrades to HVAC, replacement of windows and roofs, and creation of teen centers |
$2,000,000 |
Monroe |
30 |
|
Y |
| Rochester Public Library |
|
Replacement of HVAC system; extensive restoration of infrastructure and entire exterior of existing building |
$10,500,000 |
Monroe |
36 |
|
Y |
| Sanborn - Pekin Free Library |
|
Renovations to interior of existing building; construction of new meeting room |
$250,000 |
Niagara |
30 |
|
Y |
| Wilson Free Library |
|
Replacement of roof; installation of new drainage system; replacement of concrete flooring |
$70,500 |
Niagara |
24 |
|
Y |
| Yates Community Free Library |
|
Parking lot expansion |
$10,000 |
Orleans |
12 |
|
|
| Youngstown Free Library |
|
Construction of expansion to existing library |
$451,000 |
Niagara |
30 |
|
Y |
29 |
Allegany Public Library |
|
Replacement of HVAC and lighting systems in historic building |
$40,000 |
Cattaraugus |
18 |
Y |
Y |
| Chemung County Library District |
Big Flats Branch |
Replacement of drywell and drainage in back parking lot |
$5,000 |
Chemung |
12 |
|
Y |
| Chemung County Library District |
Main Library |
Replacement of Bookmobile |
$200,000 |
Chemung |
|
|
|
| Chemung County Library District |
Steele Branch |
Replacement of roof; complete rehabilitation of parking lot |
$785,000 |
Chemung |
18 |
|
Y |
| David A. Howe Public Library |
|
Reconstruction of exterior stairway; replacement and restoration of building's original windows |
$145,222 |
Allegany |
24 |
|
Y |
| Dormann Library |
|
Relocation of utilities, including sewer, water, and plumbing lines; expansion of parking lot. |
$193,519 |
Steuben |
30 |
|
Y |
| Gates Public Library |
|
Construction of energy-efficient addition to existing library; extensive renovations to existing library space |
$6,600,000 |
Monroe |
36 |
|
Y |
| Olean Public Library |
|
Construction of 11,000 square foot addition to existing building; extensive interior renovations to existing building including replacement of HVAC system and replacement of roof |
$4,000,000 |
Cattaraugus |
36 |
Y |
Y |
| Penn Yan Public Library |
|
Construction of new, accessible vestibule and sidewalk from vestibule to existing sidewalk; sealing off of secondary entrance; reconfiguration of space to create new program room; renovation of 2 bathrooms to make them accessible |
$173,717 |
Yates |
24 |
|
Y |
| Southern Tier Library System |
|
Installation of solar heating system including photovoltaic panels |
$75,000 |
Steuben |
18 |
Y |
Y |
| Town of Mendon Public Library |
|
Construction of new 6,840 square foot library incorporating green technology |
$1,865,541 |
Monroe |
36 |
Y |
Y |
| Wood Library Association |
|
Construction of 7,500 square foot state of the art, energy-efficient addition and extensive renovations to existing library building |
$4,000,000 |
Ontario |
18 |
|
Y |
| Multiple Districts: |
Brooklyn Public Library |
45 Branch Libraries |
Replacement of roof |
$27,000,000 |
Kings |
48 |
|
Y |
| 45 Branch Libraries |
Replacement of windows with energy-efficient units |
$45,000,000 |
Kings |
48 |
|
Y |
| 50 Branch Libraries |
Replacement of HVAC, boiler, and distribution system |
$60,000,000 |
Kings |
48 |
|
Y |
| 53 Branch Libraries |
Installation of complete fire and safety alarm systems |
$26,500,000 |
Kings |
48 |
|
|
| 59 Branch Libraries |
Installation of complete building management system and lighting controls |
$29,500,000 |
Kings |
48 |
|
Y |
New York Public Library |
Battery Park City, Highbridge, Kingsbridge, Mariners Harbor, 125th Street, 96th Street, Aguilar, Bloomingdale, Chatham Square, Epiphany, Fort Washington, George Bruce, Hamilton Fish Park, Hamilton Grange, Hudson Park, Kips Bay, Muhlenberg, Ottendorfer, Tompkins Square, Yorkville, Stapleton, St Agnes |
Extensive renovations to branch libraries, and the installation of new fire alarms (upgrades when appropriate), sprinklers, emergency lighting,
public address systems or panic bar installation on doors |
$6,950,000 |
New York, Bronx, Richmond |
36 |
|
Y |
| Chatham Sq, New Amsterdam, Kips Bay, Tompkins Sq, Muhlenberg, Heiskell, Jefferson Market, Yorkville, 67th St, Hamilton Grange, Inwood, Riverdale,Spuyten Duyvil, East Chester, Edenwald, Wakefield, Allerton, Throgsneck, Van Nest, Westchester Sq, Belmont, Tremont, St George, Port Richmond, West New Brighton, Todt Hill, Richmond Town |
Purchase and installation of new HVAC system |
$31,830,000 |
New York, Bronx, Richmond |
36 |
|
Y |
| Epiphany, Jefferson Market, 125th st, Westchester Sq, St George, West New Brighton, Kips Bay,Tottenville, East Chester, Huguenot |
Substantial renovations to existing branch library buildings. |
$80,600,000 |
New York, Bronx, Richmond |
36 |
|
Y |
| Inwood, Port Richmond, St George, Huguenot |
Installation of ADA-compliant elevators |
$1,200,000 |
New York, Bronx, Richmond |
24 |
|
|
| Ottendorfer, Hudson Park, 96th St, Countee Cullen, Fort Washington, Washington Hts, Wakefield, Allerton, Throgs Neck, Grand Concourse, Hamilton Fish, Francis Martin, Belmont, West Farms, Hunts Pt, Melrose, Soundview, Port Richmond, Dongan Hills, Todt Hill, Richmondtown |
Substantial renovations to existing branch library buildings |
$97,100,000 |
New York, Bronx, Richmond |
36 |
|
Y |
| Spuyten Duyvil, Edenwald, Van Nest, Westchester, Melrose, West New Brighton, Huguenot |
Purchase and installation of new upgraded fire alarm systems |
$2,060,000 |
New York, Bronx, Richmond |
24 |
|
|
Queens Borough Public Library |
Corona, Glendale, Queens Village, Ridgewood, Maspeth |
Renovations to existing buildings to bring into compliance with ADA |
$885,000 |
Queens |
36 |
|
|
Rochester Public Library |
10 Branches |
Comprehensive branch upgrade package including construction of building additions, upgrades to HVAC, replacement of windows and roofs, and creation of teen centers |
$2,000,000 |
Monroe |
30 |
|
Y |
Total: |
$1,399,184,916 |