| Assembly District |
Library/
Library Building |
Branch Name |
Description |
Total Cost |
County |
Construction Duration
(in months) |
Green Project |
Energy Efficiency/
Cost
Savings |
2 |
Westhampton Free Library |
|
Construction of new LEED-certified 14,250 square foot library (including geothermal heating system and photovoltaic system) |
$7,827,820 |
Suffolk |
36 |
Y |
Y |
3 |
Suffolk Cooperative Library System |
|
Removal of existing flooring in shipping area and replacement with 1/4" floor system; replacement of lighting in main office area; installation of new HVAC ductwork in original part of building |
$150,000 |
Suffolk |
12 |
|
Y |
5 |
Sayville Library |
|
Construction of new 38,000 square foot building (including geothermal heating and cooling and solar panels) |
$14,432,711 |
Suffolk |
30 |
Y |
Y |
6 |
Brentwood Public Library |
|
Renovation of existing library building and construction of Arts Annex addition including self-service café, periodicals lounge, and art gallery to display works by local residents |
$1,507,610 |
Suffolk |
30 |
|
Y |
| Central Islip Public Library |
|
Construction of new 837 square foot storage building and renovation/reconfiguration of existing library building to create new Children's Activity Center, Quiet Study/Local History room, and Computer Lab |
$2,128,394 |
Suffolk |
36 |
|
Y |
8 |
North Babylon Public Library |
|
Replacement of roof; installation of photovoltaic panels on roof |
$573,000 |
Suffolk |
24 |
Y |
Y |
9 |
Elwood Public Library |
|
Extensive renovations of newly purchased building to transform into new library |
$600,000 |
Suffolk |
24 |
|
Y |
12 |
Farmingdale Public Library |
|
Extensive building renovations including installation of new, energy efficient lighting fixtures and energy control dimming system and sensor system |
$2,100,000 |
Nassau |
24 |
|
Y |
13 |
Bayville Free Library |
|
Construction of 1,750 square foot expansion to existing library; extensive renovations to 2nd floor of existing library |
$697,500 |
Nassau |
36 |
|
Y |
14 |
Lynbrook Public Library |
|
Rehabilitation of damaged flooring including replacement of carpet |
$98,000 |
Nassau |
9 |
|
|
15 |
East Meadow Public Library |
|
Replacement of HVAC; installation of complete energy management system for entire building |
$129,400 |
Nassau |
12 |
|
Y |
16 |
Shelter Rock Public Library |
|
Replacement of 8 rooftop HVAC units |
$134,000 |
Nassau |
12 |
Y |
Y |
17 |
North Merrick Public Library |
|
Extensive renovations to existing library building; construction of addition to create community room; installation of photovoltaic panels |
$6,750,000 |
Nassau |
36 |
Y |
Y |
18 |
Nassau Library System |
|
Construction of new meeting rooms and computer center; renovations including new entrance and handicap accessible restrooms |
$700,000 |
Nassau |
18 |
|
Y |
| Roosevelt Public Library |
|
Excavation of building foundation and construction of new lower level and addition to existing building |
$8,500,000 |
Nassau |
36 |
|
N |
19 |
Freeport Memorial Library |
|
Asbestos removal, reconstruction and new flooring, shelving, and furniture for children's room; reconstruction of circulation desk including floor adjustments and new electrical system |
$219,025 |
Nassau |
24 |
|
Y |
20 |
East Rockaway Public Library |
|
Installation of photovoltaic panels; rehabilitation of building exterior |
$250,000 |
Nassau |
24 |
|
Y |
| Peninsula Public Library |
|
Construction of single lane driveway on west side of library building; reconstruction of existing parking lot |
$177,000 |
Nassau |
15 |
|
|
22 |
Queens Borough Public Library |
Queensboro Hill |
Renovation to bring building into compliance with ADA; replacement of roof |
$1,480,000 |
Queens |
30 |
|
Y |
24 |
Queens Borough Public Library |
Fresh Meadows |
Replacement of roof |
$525,000 |
Queens |
18 |
|
Y |
| Glen Oaks |
Construction of new, state of the art energy-efficient silver LEED-certified facility |
$15,000,000 |
Queens |
36 |
Y |
Y |
| Hollis |
Replacement of roof |
$350,000 |
Queens |
18 |
|
Y |
| North Hills |
Construction of new, state of the art energy-efficient silver LEED-certified building |
$20,000,000 |
Queens |
36 |
Y |
Y |
| North Hills |
Replacement of roof on existing building |
$330,000 |
Queens |
18 |
|
Y |
26 |
Queens Borough Public Library |
Auburndale |
Replacement of roof |
$425,000 |
Queens |
18 |
|
Y |
| Bay Terrace |
Replacement of roof |
$425,000 |
Queens |
18 |
|
Y |
| Douglaston |
Construction of new, state of the art energy-efficient silver LEED-certified facility |
$20,000,000 |
Queens |
36 |
Y |
Y |
| Elmhurst |
Construction of new, state of the art energy-efficient silver LEED-certified facility |
$26,000,000 |
Queens |
36 |
Y |
Y |
27 |
Queens Borough Public Library |
Briarwood |
Construction of state of the art, energy efficient silver LEED-certified expansion to existing library building; replacement of existing HVAC system |
$8,000,000 |
Queens |
36 |
Y |
Y |
| Kew Gardens Hills |
Extensive renovations and expansion of existing building including foundation work to support existing structure |
$8,600,000 |
Queens |
36 |
|
Y |
| Richmond Hill |
Extensive renovations to existing building including installation of elevator |
$5,000,000 |
Queens |
36 |
|
Y |
28 |
Queens Borough Public Library |
Rego Park |
Construction of new, state of the art energy-efficient silver LEED-certified facility |
$23,300,000 |
Queens |
36 |
Y |
Y |
| Rego Park |
Purchase and installation of new, upgraded HVAC system and Building Management System |
$460,000 |
Queens |
36 |
|
Y |
29 |
Queens Borough Public Library |
Central |
Extensive renovations to main floor of existing building; replacement of roof |
$37,300,000 |
Queens |
36 |
|
Y |
| Central |
Construction of new energy-efficient silver LEED-certified Children's Library Discovery Center |
$40,700,000 |
Queens |
36 |
Y |
Y |
| Central Data Center |
Upgrading of electrical and technical capacities |
$1,300,000 |
Queens |
18 |
|
Y |
| Rosedale |
Replacement of HVAC system |
$435,000 |
Queens |
15 |
|
Y |
30 |
Queens Borough Public Library |
Broadway |
Replacement of HVAC system |
$403,000 |
Queens |
18 |
|
Y |
| Woodside |
Rehabilitation including waterproofing of building exterior |
$208,000 |
Queens |
24 |
|
Y |
31 |
Queens Borough Public Library |
Arverne |
Extensive renovations to existing building |
$1,830,000 |
Queens |
24 |
|
Y |
| Rochdale Village |
Extensive renovations to existing building and construction of new addition; replacement of roof |
$3,950,000 |
Queens |
30 |
|
Y |
32 |
Queens Borough Public Library |
South Jamaica |
Purchase and installation of new, upgraded HVAC system and Building Management System |
$125,000 |
Queens |
18 |
|
Y |
34 |
Queens Borough Public Library |
Jackson Heights |
Construction of new, state of the art energy-efficient silver LEED-certified facility |
$52,500,000 |
Queens |
36 |
Y |
Y |
35 |
Queens Borough Public Library |
East Elmhurst |
Construction of energy-efficient silver LEED-certified expansion to existing library building |
$3,200,000 |
Queens |
36 |
Y |
Y |
| Far Rockaway |
Construction of new, state of the art energy-efficient silver LEED-certified facility |
$19,200,000 |
Queens |
36 |
Y |
Y |
36 |
Queens Borough Public Library |
Astoria |
Rehabilitation including waterproofing of building exterior |
$1,800,000 |
Queens |
24 |
|
Y |
| Steinway |
Replacement of HVAC system |
$159,000 |
Queens |
15 |
|
Y |
37 |
Queens Borough Public Library |
Queens West |
Construction of new, state of the art energy-efficient silver LEED-certified facility |
$25,000,000 |
Queens |
36 |
Y |
Y |
38 |
Queens Borough Public Library |
Glendale |
Extensive building renovations including installation of elevator |
$9,500,000 |
Queens |
36 |
|
|
44 |
Brooklyn Public Library |
Kensington |
Construction of new state of the art, energy-efficient green library building |
$18,000,000 |
Kings |
36 |
Y |
Y |
| Park Slope |
Replacement of HVAC system |
$2,000,000 |
Kings |
18 |
|
Y |
57 |
Brooklyn Public Library |
Central |
Complete interior and exterior rehabilitation including replacement of windows, roof, HVAC, and electrical system |
$51,000,000 |
Kings |
48 |
|
Y |
75 |
New York Public Library |
Central Branch |
Complete transformation of Research Library at 5th Avenue and 42nd st. The scope of this project will include infrastructure replacement, façade restoration, incorporation of energy-efficient technologies and increased broadband accessibility. Expansion of public space will include a new circulating library including additional book storage |
$280,000,000 |
New York |
48 |
|
Y |
88 |
White Plains Public Library |
|
Renovation of all public bathrooms for more efficient plumbing and wheelchair accessibility |
$275,000 |
Essex |
24 |
|
|
89 |
Katonah Village Library |
|
Renovation of 2 existing bathrooms to make them accessible; reconstruction of main floor including new electrical, lighting, ceiling, and flooring; purchase and installation of new shelving for newly reconstructed main floor; replacement of heating system boiler |
$673,826 |
Westchester |
30 |
|
Y |
| Mount Kisco Public Library |
|
Construction of new 18,500 square foot building (including energy-efficient lighting and geothermal HVAC system) |
$9,656,306 |
Westchester |
36 |
Y |
Y |
90 |
Alice Curtis Desmond and Hamilton Fish Library |
|
Renovations to existing building to increase energy-efficiency including installation of geothermal wells and solar panels |
$250,000 |
Putnam |
30 |
Y |
Y |
91 |
Larchmont Public Library |
|
Reconstruction of 3,000 square foot children's room in library that will be LEED-certified (including upgraded energy-efficient HVAC and lighting) |
$2,500,000 |
Westchester |
30 |
Y |
Y |
| New Rochelle Public Library |
|
Replacement of Cooling Tower and HVAC system |
$150,000 |
Westchester |
15 |
|
Y |
92 |
Ardsley Public Library |
|
Construction of 2,200 square foot addition to existing library |
$1,324,690 |
Westchester |
30 |
|
Y |
| Half Hollow Hills Community Library |
|
Replacement of boiler and air handler systems. |
$664,243 |
Suffolk |
12 |
|
Y |
94 |
Nanuet Public Library |
|
Demolition of existing building; construction of new state of the art, energy-efficient 40,000 square foot building |
$19,500,000 |
Rockland |
48 |
|
Y |
| New City Library |
|
Replacement of HVAC system; installation of new circulation desk; renovations to lobby including replacement of flooring and lighting; new front entrance steps and handicap ramp; extensive renovations to meeting room including "green" lighting system |
$884,500 |
Rockland |
24 |
Y |
Y |
| Valley Cottage Free Library |
|
Complete reconfiguration of space to expand circulation desk area including a new loft area which will be accessed by a new staircase and lift; construction of a 1,600 square foot addition to create a new children's department area; construction of new covered walkway and vestibule |
$1,350,000 |
Rockland |
36 |
Y |
Y |
| West Nyack Free Library |
|
Replacement of HVAC system |
$26,000 |
Rockland |
12 |
|
Y |
95 |
The Nyack Library |
|
Construction of new, state of the art energy-efficient 15,000 square foot addition; extensive renovations to existing building including installation of geothermal wells |
$9,627,500 |
Rockland |
36 |
Y |
Y |
96 |
Pine Bush Area Public Library |
|
Replacement of HVAC system; replacement of roof; construction of new, state of the art energy-efficient 300 square foot addition |
$175,000 |
Orange |
30 |
|
Y |
97 |
Albert Wisner Public Library |
|
Construction of new 20,000 square foot library building (including geothermal heating system and solar glazed windows and doors) |
$8,950,000 |
Orange |
36 |
Y |
Y |
| Ramapo Catskill Library System |
|
Demolition of building adjacent to system headquarters including asbestos abatement; construction of new parking lot |
$173,504 |
Orange |
18 |
|
|
| Tuxedo Park Library |
|
Extensive renovations to existing building to increase energy-efficiency |
$49,000 |
Orange |
18 |
|
Y |
98 |
Daniel Pierce Public Library |
|
Construction of 23,500 square foot state of the art, energy-efficient addition; extensive renovation of existing library building including installation of geothermal units |
$5,044,500 |
Sullivan |
36 |
Y |
Y |
| Port Jervis Free Library |
|
Replacement of mechanical and electrical systems |
$515,000 |
Orange |
24 |
|
Y |
| Western Sullivan Public Library |
Delware Free Branch |
Restoration of windows to increase energy-efficiency in historic building |
$19,500 |
Sullivan |
18 |
|
Y |
| Jeffersonville Branch |
Replacement of HVAC system |
$16,000 |
Sullivan |
12 |
|
Y |
| Tusten Cochecton Branch |
Replacement of roof; replacement of front door; renovations to increase storage space |
$30,575 |
Sullivan |
18 |
|
Y |
99 |
Somers Library |
|
Replacement of HVAC system |
$145,000 |
Westchester |
15 |
|
Y |
100 |
Greater Poughkeepsie Library District |
|
Construction of a new 19,000 square foot four-floor expansion |
$15,086,260 |
Dutchess |
36 |
|
Y |
| Highland Public Library |
|
Construction of new, state of the art, energy-efficient library building |
$3,000,000 |
Ulster |
36 |
Y |
Y |
| Howland Public Library (Beacon) |
|
Construction of addition to double space of existing library |
$10,000,000 |
Dutchess |
36 |
|
Y |
| Marlboro Free Library |
|
Construction of addition to double space of existing library |
$4,400,000 |
Ulster |
36 |
|
Y |
| Mid-Hudson Library System |
|
Renovations to existing building to increase energy-efficiency including installation of solar panels |
$500,000 |
Dutchess |
24 |
|
Y |
101 |
Cragsmoor Free Library |
|
Replacement of HVAC system; rehabilitation work on exterior of building including sealing and insulation upgrades for energy-efficiency; installation of energy-efficient lighting; rehabilitation work on 8 ft. windows in reading room (historic building) |
$44,200 |
Ulster |
24 |
|
Y |
| Phoenicia Library |
|
Construction of addition to double space of existing library |
$900,000 |
Ulster |
24 |
|
Y |
| Rosendale Library |
|
Construction of addition to double space of existing library |
$2,000,000 |
Ulster |
30 |
|
Y |
| Stone Ridge Library |
|
Construction of addition to double space of existing historic building |
$3,500,000 |
Ulster |
30 |
|
Y |
| The Gardiner Library |
|
Construction of new 4,900 square foot library (including cupola monitor to increase natural lighting, economizers on heating and cooling elements to maximize efficiency, automatic light control, and high insulation factors on walls, windows, and entries) |
$2,174,266 |
Ulster |
36 |
Y |
Y |
| Wallkill Public Library |
|
Construction of new state of the art, energy-efficient 8,700 square foot addition to existing library building |
$6,500,000 |
Ulster |
36 |
|
Y |
| Woodstock Public Library District |
|
Construction of addition to double space of existing library |
$5,200,000 |
Ulster |
36 |
|
Y |
102 |
Rensselaerville Public Library |
|
Replacement of siding; rehabilitation of roof; reconfiguration of basement space to use as storage and work area |
$37,850 |
Albany |
15 |
|
Y |
| Staatsburg Library |
|
Construction of addition to double space of existing library |
$500,000 |
Dutchess |
30 |
|
Y |
103 |
Amenia Free Library |
|
Construction of addition to double space of existing library |
$1,000,000 |
Dutchess |
30 |
|
Y |
| Beekman Library |
|
Construction of addition to double space of existing library |
$400,000 |
Dutchess |
30 |
|
Y |
| Claverack Free Library |
|
Construction of addition to double space of existing library; renovations to existing space to make building handicap accessible |
$1,000,000 |
Columbia |
30 |
|
Y |
| Hudson Area Association Library |
|
Extensive renovations to historic building |
$8,000,000 |
Columbia |
36 |
|
Y |
| Pine Plains Library |
|
Construction of new library including installation of geothermal wells |
$2,100,000 |
Dutchess |
30 |
Y |
Y |
| Pleasant Valley Free Library |
|
Construction of addition to double space of existing library |
$2,500,000 |
Dutchess |
30 |
|
Y |
| Red Hook Public Library |
|
Construction of three-story addition to rear of building |
$210,000 |
Dutchess |
24 |
|
Y |
| Roeliff Jansen Community Library |
|
Construction of new, energy-efficient green 7,500 square foot library building with LEED certification |
$2,078,500 |
Columbia |
30 |
Y |
Y |
104 |
Albany Public Library |
Arbor Hill Branch |
Construction of new 12,000 square foot branch library (including geothermal wells) |
$5,715,745 |
Albany |
36 |
Y |
Y |
| Delaware Branch |
Total renovation/rehabilitation and major energy-efficiency upgrades |
$4,728,074 |
Albany |
36 |
Y |
Y |
| Howe Branch |
Total renovation/rehabilitation and major energy-efficiency upgrades |
$5,242,637 |
Albany |
36 |
Y |
Y |
| New Scotland Branch |
Total renovation/rehabilitation and major energy-efficiency upgrades |
$4,048,580 |
Albany |
36 |
Y |
Y |
| Pine Hills Branch |
Total renovation/rehabilitation and major energy-efficiency upgrades |
$4,784,437 |
Albany |
36 |
Y |
Y |
| Altamont Free Library |
|
Extensive renovations to Altamont Train Station for use as a library |
$500,000 |
Albany |
24 |
|
Y |
| Guilderland Public Library |
|
Reconfigure existing space to enlarge the Community Room and Children's area, relocate and enlarge the Technology Dept., and create a new community room/local history area; relocate all sewer lines |
$1,100,000 |
Albany |
24 |
|
|
105 |
Mohawk Valley Library System |
|
Replacement of roof |
$105,725 |
Schenectady |
18 |
|
Y |
106 |
Cohoes Public Library |
|
Replacement of lighting fixtures with energy-efficient units |
$75,000 |
Albany |
12 |
|
Y |
| Rensselaer Public Library |
|
Renovation (general construction components) of newly purchased library building (including upgraded energy-efficient electrical, plumbing, and heating/cooling systems) |
$1,000,000 |
Rensselaer |
24 |
|
Y |
107 |
Moore Memorial Library |
|
Construction of 17,470 square foot state of the art, energy-efficient expansion |
$3,500,000 |
Chenango |
36 |
Y |
Y |
| Oxford Memorial Library |
|
Construction of 1,100 square foot addition including installation of a chair lift, bathroom, and full basement for storage |
$419,240 |
Chenango |
30 |
|
Y |
108 |
Bethlehem Public Library |
|
Expansion and reconstruction of existing parking lot including rerouting of access to and egress from lot; new covered shelter for passenger dropoff and pickup; new walkways and crosswalks from parking to library building |
$460,034 |
Albany |
18 |
|
|
| Brunswick Community Library |
|
Extensive renovations to interior and exterior of newly purchased building |
$135,000 |
Rensselaer |
30 |
Y |
Y |
| Kinderhook Memorial Library |
|
Construction of addition to double space of existing library |
$2,000,000 |
Columbia |
30 |
|
Y |
| New Lebanon Library |
|
Construction of 880 square foot addition including a kitchenette facility and purchase of furniture and equipment |
$331,431 |
Columbia |
30 |
|
Y |
| Valatie Free Library |
|
Extensive renovations of newly purchased library building |
$250,000 |
Columbia |
24 |
|
Y |
110 |
Southern Adirondack Library System |
|
Replacement of roof |
$140,000 |
Saratoga |
15 |
Y |
Y |
| Town of Ballston Community Library |
|
Upgrade thermostats, replace weatherstripping in doors; replace track lights and install motion sensor lights in closets and bathrooms |
$7,900 |
Saratoga |
6 |
|
Y |
111 |
C. W. Clark Memorial Library |
|
Construction of an 1,100 square foot 2 story addition to existing library; purchase of new shelving. |
$153,008 |
Oneida |
24 |
|
Y |
| DeRuyter Free Library |
|
Asbestos abatement in basement; construction of addition to house elevator and egress stairs; installation of elevator |
$235,343 |
Madison |
30 |
|
Y |
| Richfield Springs Public Library |
|
Construction of 2nd floor addition to existing building. |
$100,333 |
Otsego |
24 |
|
Y |
112 |
Stephentown Memorial Library |
|
Construction of handicapped accessible deck area for community use; reconfiguration of existing building to create staff area |
$22,000 |
Rensselaer |
15 |
|
|
| Woman's Round Lake Improvement Society Library |
Malta |
Construction of new state of the art, energy-efficient 5,130 square foot branch library fully furnished with green materials |
$1,420,148 |
Saratoga |
30 |
Y |
Y |
113 |
Elizabethtown Library Association |
|
Replacement and reframing of door and replacement of building's historically significant windows |
$11,250 |
Essex |
30 |
|
Y |
| Hammond Library |
|
Extensive renovations to basement of existing library to make space usable; replacement of roof; construction of exterior ramp to comply with ADA specifications; replacement of hot water heater |
$90,000 |
St. Lawrence |
24 |
|
Y |
| Stony Creek Free Library |
|
Extensive renovations to existing library building and expansion into neighboring building including fully green building materials and LEED certification |
$800,000 |
Warren |
30 |
Y |
Y |
114 |
Clinton Essex Franklin Library System |
|
Replacement of front steps and railing; reconstruction of collapsing driveway |
$25,000 |
Clinton |
15 |
|
|
| Dodge Memorial Library |
|
Replacement of existing library's portico |
$30,000 |
Clinton |
9 |
|
|
| Mooers Free Library |
|
Installation of insulation in attic of existing library building and replacement of 4 windows |
$5,000 |
Clinton |
15 |
|
Y |
| Peru Free Library |
|
Replacement of furnace, front sidewalk, and roof; installation of solar panels |
$134,582 |
Clinton |
24 |
Y |
Y |
| Plattsburgh Public Library |
|
Conversion to electric heat and installation of solar panels |
$375,000 |
Clinton |
24 |
Y |
Y |
| The Wead Library |
|
Purchase and installation of 40 windows with e-4 insulated glass window |
$40,000 |
Franklin |
15 |
|
Y |
116 |
Jervis Public Library |
|
Reconstruction of 4 chimneys and adjacent roof slates on historic library building |
$145,020 |
Oneida |
24 |
|
|
117 |
Ilion Free Public Library |
|
Installation of new HVAC system and new electrical; reconstruction of existing space to create new circulation/reference area and new meeting room |
$264,200 |
Herkimer |
30 |
|
Y |
| Northville Public Library |
|
Installation of elevator lift; reconstruction of 2nd floor including structural modifications to create open meeting room and kitchenette; installation of new windows and zoned HVAC; Renovation of the basement including new lighting and electrical outlets, new ventilation, new interior stairs and painting |
$316,591 |
Fulton |
30 |
|
Y |
118 |
Canton Free Library |
Morley Branch |
Replacement of roof, windows and doors to increase energy-efficiency/energy conservation |
$30,000 |
St. Lawrence |
18 |
|
Y |
| Cape Vincent Community Library |
|
Replacement of roof; renovations to make front entrance handicap accessible |
$25,000 |
Jefferson |
18 |
|
Y |
| Hepburn Library of Waddington |
|
Restoration of building including new electrical and lighting systems; rehabilitation of exterior brick, stone, wood and windows; installation of insulation and ventilation in attic |
$327,200 |
St. Lawrence |
30 |
|
Y |
| Potsdam Public Library |
|
Installation of elevator in existing elevator shaft and additional floor stops; renovations to install ramps, walkways, fire doors, and walls to provide access to the second and third floors of the library |
$185,000 |
St. Lawrence |
24 |
|
|
119 |
Onondaga County Public Library |
Beauchamp Branch |
Replacement of roof |
$134,195 |
Onondaga |
15 |
|
Y |
| Soule Branch |
Replacement of HVAC |
$154,271 |
Onondaga |
15 |
|
Y |
| Onondaga Free Library |
|
Construction of 20,000 square foot state of the art, energy-efficient expansion and extensive renovations to existing building |
$3,200,000 |
Onondaga |
36 |
|
Y |
120 |
Onondaga County Public Library |
Betts Branch |
Replacement of HVAC |
$122,714 |
Onondaga |
15 |
|
Y |
| Hazard Branch |
Replacement of HVAC system including asbestos removal |
$255,000 |
Onondaga |
18 |
|
Y |
| Mundy Branch |
Replacement of roof |
$115,025 |
Onondaga |
15 |
|
Y |
| Paine Branch |
Replacement of HVAC system including asbestos removal |
$115,000 |
Onondaga |
18 |
|
Y |
121 |
Fayetteville Free Library |
|
Renovations to existing building to create Business Center, Café, and Performance Space |
$841,057 |
Onondaga |
30 |
|
Y |
122 |
Carthage Free Library |
|
Renovations to make building fully accessible, including installation of an elevator; construction of building addition; expansion of parking lot |
$300,000 |
Jefferson |
30 |
|
Y |
| Hepburn Library of Norfolk |
|
Renovations to make restroom wheelchair accessible |
$20,000 |
St. Lawrence |
12 |
|
|
| New Berlin Library |
|
Replacement of windows |
$8,500 |
Chenango |
18 |
|
Y |
123 |
Aurora Town Public Library |
|
Replace lighting with new, state of the art, energy-efficient lighting system; replacement of front entry doors with energy-efficient, ADA compliant units |
$18,000 |
Erie |
12 |
|
Y |
| Peck Memorial Library |
|
Restoration of entire exterior of existing brick building; replacement of windows with energy-efficient units |
$218,000 |
Cortland |
24 |
|
Y |
124 |
Fulton Public Library |
|
Reconstruction of sub-basement area to protect elevator and heating mechanicals room; construction of new staircase from sub-basement to basement. |
$120,840 |
Oswego |
24 |
|
Y |
125 |
Groton Public Library |
|
Replacement of air conditioning system |
$15,000 |
Tompkins |
6 |
|
Y |
127 |
Cairo Public Library |
|
Construction of new, state of the art, energy-efficient library building |
$3,500,000 |
Greene |
36 |
|
Y |
| Haines Falls Free Library |
|
Replacement of roof, doors, and windows in newly purchased building |
$2,850,000 |
Greene |
30 |
|
Y |
| Saugerties Public Library |
|
Construction of 8,000 square foot addition to historic library building and renovation of existing building |
$7,437,608 |
Ulster |
36 |
Y |
Y |
128 |
Palmyra Kings Daughters Free Library |
|
Extensive renovations to existing 12,000 square foot library building including installation of elevator and construction of addition to rear entry |
$2,939,100 |
Wayne |
36 |
|
Y |
129 |
Geneva Public Library |
|
Renovation of 2nd floor in existing library building; replacement of BAC evaporative cooling tower |
$83,274 |
Ontario |
4 |
|
Y |
| Waterloo Library and Historical Society |
|
Construction of handicapped access ramp; restoration of brick and limestone exterior walls |
$144,888 |
Seneca |
24 |
|
|
| Wood Library Association |
|
Construction of 7,500 square foot state of the art, energy-efficient addition and extensive renovations to existing library building |
$4,000,000 |
Ontario |
18 |
|
Y |
130 |
Town of Mendon Public Library |
|
Construction of new 6,840 square foot library incorporating green technology |
$1,865,541 |
Monroe |
36 |
Y |
Y |
133 |
Gates Public Library |
|
Construction of energy-efficient addition to existing library; extensive renovations to existing library space |
$6,600,000 |
Monroe |
36 |
|
Y |
| Rochester Public Library |
|
Replacement of HVAC system; extensive restoration of infrastructure and entire exterior of existing building |
$10,500,000 |
Monroe |
36 |
|
Y |
134 |
Farmers Library Company of Ogden |
|
Construction of energy-efficient addition to existing library |
$2,000,000 |
Monroe |
30 |
|
Y |
136 |
Dormann Library |
|
Relocation of utilities, including sewer, water, and plumbing lines; expansion of parking lot. |
$193,519 |
Steuben |
30 |
|
Y |
| Penn Yan Public Library |
|
Construction of new, accessible vestibule and sidewalk from vestibule to existing sidewalk; sealing off of secondary entrance; reconfiguration of space to create new program room; renovation of 2 bathrooms to make them accessible |
$173,717 |
Yates |
24 |
|
Y |
| Southern Tier Library System |
|
Installation of solar heating system including photovoltaic panels |
$75,000 |
Steuben |
18 |
Y |
Y |
137 |
Chemung County Library District |
Big Flats Branch |
Replacement of drywell and drainage in back parking lot |
$5,000 |
Chemung |
12 |
|
Y |
| Main Library |
Replacement of Bookmobile |
$200,000 |
Chemung |
|
|
|
| Steele Branch |
Replacement of roof; complete rehabilitation of parking lot |
$785,000 |
Chemung |
18 |
|
Y |
138 |
Lewiston Public Library |
|
Replacement of doors with energy-efficient units; installation of energy-efficient window films; installation of energy-efficient motion sensor lighting |
$19,500 |
Niagara |
18 |
|
Y |
| Newfane Free Library |
|
Replacement of windows and doors with energy-efficient units; replacement of siding; rehabilitation of parking lot |
$24,000 |
Niagara |
24 |
|
Y |
| Niagara Falls Public Library |
LaSalle Branch |
Rehabilitation of historic windows throughout building; installation of new exterior storm windows; installation of ductless air conditioning units |
$264,756 |
Niagara |
30 |
|
Y |
| Niagara Falls Public Library |
|
Replacement of 54 windows; upgrade to air conditioning |
$318,000 |
Niagara |
30 |
|
Y |
| Nioga Library System |
|
Replacement of 3 air conditioning units; replacement of rooft; installation of 8 wind turbines; construction of 400 square foot addition to house computer equipment; rehabilitation of parking lot; repairs to exterior of original building; construction of handicap accessible entrance |
$852,500 |
Niagara |
36 |
Y |
Y |
| Ransomville Free Library |
|
Construction of new 480 square foot building to store and preserve historical items |
$125,000 |
Niagara |
30 |
|
Y |
| Sanborn - Pekin Free Library |
|
Renovations to interior of existing building; construction of new meeting room |
$250,000 |
Niagara |
30 |
|
Y |
| Wilson Free Library |
|
Replacement of roof; installation of new drainage system; replacement of concrete flooring |
$70,500 |
Niagara |
24 |
|
Y |
| Youngstown Free Library |
|
Construction of expansion to existing library |
$451,000 |
Niagara |
30 |
|
Y |
139 |
Barker Free Library |
|
Extensive rehabilitation of interior and exterior of existing building |
$20,000 |
Niagara |
18 |
|
Y |
| Byron-Bergen Free Library |
Gillam-Grant Community Center |
Replacement of windows with energy-efficient units |
$28,000 |
Genesee |
12 |
|
Y |
| Byron-Bergen Free Library |
|
Extensive interior renovations of library building |
$100,000 |
Genesee |
24 |
|
Y |
| Community Free Library |
|
Merging of newly purchased building with adjacent existing library; demolition of common non-bearing walls; reconstruction and renovation of new "addition." |
$111,800 |
Orleans |
24 |
|
Y |
| Corfu Free Library |
|
Renovation of interior of new addition |
$18,800 |
Genesee |
18 |
|
Y |
| Haxton Memorial Library |
|
Replacement of windows with energy-efficient units |
$29,000 |
Genesee |
15 |
|
Y |
| Lee Whedon Memorial Library |
|
Acquisition of site and construction of new, state of the art, energy-efficient library building |
$920,000 |
Orleans |
30 |
Y |
Y |
| Richmond Memorial Library |
|
Renovations to make existing building handicap accessible; replacement of sidewalk; renovation of storage building |
$108,500 |
Genesee |
24 |
|
|
| Swan Library |
|
Acquisition of site and construction of new 28,000 square foot state of the art energy-efficient library building |
$4,000,000 |
Orleans |
36 |
|
Y |
| Woodward Memorial Library |
|
Installation of central air conditioning throughout existing library building; installation of energy-efficient window coverings |
$111,000 |
Genesee |
24 |
|
Y |
| Yates Community Free Library |
|
Parking lot expansion |
$10,000 |
Orleans |
12 |
|
|
140 |
City of Tonawanda |
|
Replacement of HVAC system; rehabilitation of the library's exterior walls |
$165,000 |
Erie |
24 |
|
Y |
| North Tonawanda Public Library |
|
Reconstruction of existing space to create new floor plan in library; purchase of furniture and carpeting for newly renovated space; rehabilitation of parking lot; upgrade to HVAC |
$155,116 |
Niagara |
30 |
|
|
141 |
Buffalo & Erie County Public Library |
Central Library |
Extensive renovations of library building including installation of elevators to replace energy inefficient escalators, asbestos abatement, modification of generators to allow alternative fuel use |
$16,687,371 |
Erie |
36 |
|
Y |
| Crane Branch |
Replacement of lighting, windows, roof, and ceiling tiles with energy-efficiency upgrades |
$140,000 |
Erie |
24 |
|
Y |
| East Delavan Branch |
Replacement of lighting with energy-efficiency lighting system; installation of new, energy-efficient, ADA compliant front door |
$37,000 |
Erie |
15 |
|
Y |
142 |
Ewell Free Library |
|
Replacement of HVAC system on upper floor of building with energy efficient equipment; installation of energy efficient air conditioning equipment in basement meeting area |
$30,250 |
Erie |
24 |
|
Y |
| Lockport Public Library |
|
Replacement of lighting with energy-efficient units; replacement of HVAC; installation of security gates with people counters; replacement of 21 windows; expansion to meeting room, children's room and storage area |
$44,500 |
Niagara |
24 |
|
Y |
| Marilla Free Library |
|
Reconfiguration of existing 3,400 square foot library to create more economical use of space including the expansion of the library's Employment/Education Resource Center |
$12,000 |
Erie |
18 |
|
|
| Middleport Public Library |
|
Extensive renovations to interior of existing building |
$28,000 |
Niagara |
18 |
|
Y |
143 |
Cheektowaga Public Library |
Anna M. Reinstein Memorial Library |
Total rehabilitation of parking lot |
$15,500 |
Erie |
12 |
|
|
| Lancaster Public Library |
|
Resurfacing of existing concrete floor and replacement of deteriorated carpet |
$34,144 |
Erie |
15 |
|
|
144 |
Buffalo & Erie County Public Library |
Niagara Branch |
Replacement of lighting with energy-efficient lighting system; replacement of existing floor to incorporate wiring and electrical for connectivity and computer terminals; replacement of boiler with geothermal wells |
$260,000 |
Erie |
30 |
Y |
Y |
| Riverside Branch |
Replacement of lighting with energy-efficient lighting system; replacement of roof and ceiling tiles to improve energy conservation |
$70,000 |
Erie |
18 |
|
Y |
145 |
Buffalo & Erie County Public Library |
Dudley Branch |
Replacement of lighting and windows with energy-efficiency upgrades; replacement of existing floor to incorporate new wiring and electrical for connectivity and computer terminals |
$130,000 |
Erie |
24 |
|
Y |
| East Clinton Branch |
Replacement of lighting with new, energy-efficient lighting system; replacement of existing floor to incorporate new wiring and electrical for connectivity and computer terminals |
$110,000 |
Erie |
24 |
|
Y |
146 |
Angola Public Library |
|
Construction of 1,138 square foot energy-efficient addition to provide public meeting and children's programming space |
$275,769 |
Erie |
30 |
|
Y |
| Town of Collins Public Library |
|
Installation of electric door openers to make front entry doors ADA compliant |
$5,000 |
Erie |
6 |
|
|
147 |
Dansville Public Library |
|
Construction of new state of the art, energy-efficient 7,200 square foot addition to existing building |
$2,800,000 |
Livingston |
18 |
|
Y |
| Lima Public Library |
|
Construction of 500 square foot addition. |
$196,510 |
Livingston |
24 |
Y |
Y |
| Pavilion Public Library |
|
Reconfiguration of current circulation area |
$26,500 |
Genesee |
15 |
|
|
| Stevens Memorial Community Library |
|
Construction of new rear entrance including passive solar windows and solar panels; replacement of windows with energy-efficient units; replacement of siding and roof; reconfiguration of interior layout |
$500,000 |
Wyoming |
30 |
Y |
Y |
148 |
Amherst Public Library |
Main Branch |
Replacement of roof over original part of building. |
$295,000 |
Erie |
18 |
|
Y |
| Cheektowaga Public Library |
Main Library |
Total rehabilitation of parking lot |
$4,055 |
Erie |
12 |
|
|
149 |
Allegany Public Library |
|
Replacement of HVAC and lighting systems in historic building |
$40,000 |
Cattaraugus |
18 |
Y |
Y |
| David A. Howe Public Library |
|
Reconstruction of exterior stairway; replacement and restoration of building's original windows |
$145,222 |
Allegany |
24 |
|
Y |
| Kennedy Free Library |
|
Construction of new state of the art, energy-efficient "green" library building |
$2,500,000 |
Chautauqua |
36 |
Y |
Y |
| Olean Public Library |
|
Construction of 11,000 square foot addition to existing building; extensive interior renovations to existing building including replacement of HVAC system and replacement of roof |
$4,000,000 |
Cattaraugus |
36 |
Y |
Y |
150 |
Ashville Free Library |
|
Replacement of roof and windows; extensive renovations to second floor of existing building |
$64,400 |
Chautauqua |
24 |
|
Y |
| Falconer Public Library |
|
Replacement of HVAC and lighting systems in historic building; renovations to make basement handicap accessible |
$100,000 |
Chautauqua |
24 |
Y |
Y |
| James Prendergast Library Association |
|
Construction of 6,615 square foot addition to existing building; replacement of HVAC system, windows and roof; installation of electric lines and computer cables in concrete slab foundation; removal and replacement of existing carpet and floor tiles including asbestos abatement |
$4,422,027 |
Chautauqua |
36 |
|
Y |
| Lakewood Memorial Library |
|
Reconstruction/reconfiguration of existing space to create new Director's office and staff workroom, circulation area, computer area, and stacks; replacement of interior lights and windows; new ceiling; furnishings for newly configured area |
$154,789 |
Chautauqua |
30 |
|
Y |
| Patterson Library |
|
Construction of addition to existing library |
$400,000 |
Putnam |
24 |
|
Y |
| Multiple Districts: |
Brooklyn Public Library |
45 Branch Libraries |
Replacement of roof |
$27,000,000 |
Kings |
48 |
|
Y |
| 45 Branch Libraries |
Replacement of windows with energy-efficient units |
$45,000,000 |
Kings |
48 |
|
Y |
| 50 Branch Libraries |
Replacement of HVAC, boiler, and distribution system |
$60,000,000 |
Kings |
48 |
|
Y |
| 53 Branch Libraries |
Installation of complete fire and safety alarm systems |
$26,500,000 |
Kings |
48 |
|
|
| 59 Branch Libraries |
Installation of complete building management system and lighting controls |
$29,500,000 |
Kings |
48 |
|
Y |
New York Public Library |
Battery Park City, Highbridge, Kingsbridge, Mariners Harbor, 125th Street, 96th Street, Aguilar, Bloomingdale, Chatham Square, Epiphany, Fort Washington, George Bruce, Hamilton Fish Park, Hamilton Grange, Hudson Park, Kips Bay, Muhlenberg, Ottendorfer, Tompkins Square, Yorkville, Stapleton, St Agnes |
Extensive renovations to branch libraries, and the installation of new fire alarms (upgrades when appropriate), sprinklers, emergency lighting,
public address systems or panic bar installation on doors |
$6,950,000 |
New York, Bronx, Richmond |
36 |
|
Y |
| Chatham Sq, New Amsterdam, Kips Bay, Tompkins Sq, Muhlenberg, Heiskell, Jefferson Market, Yorkville, 67th St, Hamilton Grange, Inwood, Riverdale,Spuyten Duyvil, East Chester, Edenwald, Wakefield, Allerton, Throgsneck, Van Nest, Westchester Sq, Belmont, Tremont, St George, Port Richmond, West New Brighton, Todt Hill, Richmond Town |
Purchase and installation of new HVAC system |
$31,830,000 |
New York, Bronx, Richmond |
36 |
|
Y |
| Epiphany, Jefferson Market, 125th st, Westchester Sq, St George, West New Brighton, Kips Bay,Tottenville, East Chester, Huguenot |
Substantial renovations to existing branch library buildings. |
$80,600,000 |
New York, Bronx, Richmond |
36 |
|
Y |
| Inwood, Port Richmond, St George, Huguenot |
Installation of ADA-compliant elevators |
$1,200,000 |
New York, Bronx, Richmond |
24 |
|
|
| Ottendorfer, Hudson Park, 96th St, Countee Cullen, Fort Washington, Washington Hts, Wakefield, Allerton, Throgs Neck, Grand Concourse, Hamilton Fish, Francis Martin, Belmont, West Farms, Hunts Pt, Melrose, Soundview, Port Richmond, Dongan Hills, Todt Hill, Richmondtown |
Substantial renovations to existing branch library buildings |
$97,100,000 |
New York, Bronx, Richmond |
36 |
|
Y |
| Spuyten Duyvil, Edenwald, Van Nest, Westchester, Melrose, West New Brighton, Huguenot |
Purchase and installation of new upgraded fire alarm systems |
$2,060,000 |
New York, Bronx, Richmond |
24 |
|
|
Queens Borough Public Library |
Corona, Glendale, Queens Village, Ridgewood, Maspeth |
Renovations to existing buildings to bring into compliance with ADA |
$885,000 |
Queens |
36 |
|
|
Rochester Public Library |
10 Branches |
Comprehensive branch upgrade package including construction of building additions, upgrades to HVAC, replacement of windows and roofs, and creation of teen centers |
$2,000,000 |
Monroe |
30 |
|
Y |
Total: |
$1,399,184,916 |