By Public Library System: Brooklyn | Buffalo-Erie | Chautauqua-Cattaraugus | Clinton-Essex-Franklin | Finger Lakes | Four County | Mid-Hudson | Mid-York | Mohawk Valley | Monroe | Nassau | New York | Nioga | North Country | Onondaga | Pioneer | Queens | Ramapo Catskill | Southern Adirondack | Southern Tier | Suffolk | Upper Hudson | Westchester
By County: Albany | Allegany | Bronx | Broome | Cattaraugus | Cayuga | Chautauqua | Chemung | Chenango | Clinton | Columbia | Cortland | Delaware | Dutchess | Erie | Essex | Franklin | Fulton | Genesee | Greene | Hamilton | Herkimer | Jefferson |Kings (Brooklyn) | Lewis | Livingston | Madison | Monroe | Montgomery | Nassau |New York (Manhattan) | Niagara | Oneida | Onondaga | Ontario | Orange | Orleans | Oswego | Otsego | Putnam | Queens | Rensselaer |Richmond (Staten Island) | Rockland | Saratoga | Schenectady | Schoharie | Schuyler | Seneca | St. Lawrence | Steuben | Suffolk | Sullivan | Tioga | Tompkins | Ulster (Mid-Hudson LS, Ramapo Catskill LS) | Warren | Washington | Wayne | Westchester | Wyoming | Yates
820 Tonawanda St.
Buffalo, NY 14207Estimated construction need: $150,000
1st Senate District
1st Assembly District
Information collected 1/30/06The Riverside Branch was built in 1986 and has had no significant additions or renovations since. The library currently has enough space to house its collection, but does not have adequate space to accommodate 10 years' growth of the collection. An addition is needed at an estimated cost of $150,000.
Needs:
- Addition
- New roof
- 250 additional square feet of space to accommodate 10 years' growth of the collection
102 Buffalo St.
Hamburg, NY 1407558th Senate District
146th Assembly District
Information collected 3/13/06The Hamburg Public Library-Lake Shore Branch was built in 1966, and was last renovated in 2003. The library is currently in need of additional meeting space. Each year the library holds several programs that attract a large number of people. Due to the size of the meeting room, many patrons wanting to attend these programs are turned away.
Needs:
- Additional 1,500 square feet of meeting room space
- 3,000 square feet of additional space to accommodate 10 years' growth of the collection
4570 S. Buffalo St
Orchard Park, NY 14127Estimated construction need: $1,255,000
59th Senate District
145th Assembly District
Information collected 1/25/06The Orchard Park Public Library was built in 1970, and was last renovated in 1998. The library is in need of a new boiler and air conditioning system to increase energy efficiency. Currently, the library's energy costs are 4 times the average cost of other libraries in the Buffalo & Erie County Library System. Additional space is also needed for the collection and a program/meeting area. The estimated cost of building an addition and renovating the current building is $1,255,000.
Estimated Construction Costs:Addition: $970,000
Heating system: $125,000
Air conditioning system: $25,000
Lighting: $80,000
Doors: $8,000
Parking improvements: $15,000
Carpeting: $22,000
Total: $1,255,000Needs:
- Upgrades to heating, air conditioning, and doors to increase energy efficiency
- 8,000 square feet of additional space
- Addition
- New lighting
- Parking improvements
- New carpeting
- More space for public access computers
- Improved electrical wiring for telecommunications
- Additional program/meeting space
- Backup generator
90 W. Main St.
Allegany, NY 14706Estimated construction need: $83,000
57th Senate District
149th Assembly District
Information collected 2/7/06The Allegany Public Library was built in 1915, and was last renovated in 2005. The library is currently in need of an elevator and wheel-chair accessible restroom to better serve patrons with disabilities. The estimated cost of an addition, window replacement, elevator, and wheel-chair accessible restroom is $83,000. The library is planning to apply for construction aid through the New York state $14 Million public library construction grant program.
Needs:
- Addition: $50,000
- Window replacement: $10,000
- Wheel-chair accessible restroom: $3,000
- Elevator: $20,000
- More space for public access computers
- Improve wiring for electrical equipment and telecommunications
- Increase public access Internet connection speed from Cable (512 Kbps to 20 Mbps) to T1
1 Washington Street, PO Box 1226
Ellicottville, NY 14731Planned construction project: $910,000
57th Senate District
149th Assembly District
Information collected 3/29/06The Ellicottville Public Library began construction of a new facility in November 2005. Currently, the library is located in an old, historic school building that lacks sufficient space, parking, and amenities. The total cost of construction is $910,000, and the library has secured bridge funding via bank debt service until it can raise the additional funds needed to pay for this capital project. The library plans to raise additional funds through a construction grant and philanthropic venues. The library is planning to apply for construction aid through the New York state $14 Million public library construction grant program.
Needs:
- New facility
- 5,500 square feet space to adequately serve library patrons
37 West Main Street
Brocton, NY 14716Estimated construction need $1,200,000
57th Senate District
150th Assembly District
Information collected 1/30/06The Ahira Hall Memorial Library was built in 1903 and has not had any significant renovations or additions since. At this time, the library is in need of a new 4,500 square foot building at an estimated cost of $1,200,000. This new facility is in the early planning and fundraising stages.
Needs:
- New 4,500 square foot building (2,625 square feet larger than existing building)
- Make all areas of the library accessible to patrons in wheelchairs, including restrooms
- Additional space for adult, young adult, and children's collections, reading areas
- Space for additional public access computers and other equipment
- Up-to-date wiring for electrical equipment and telecommunications
- Building to be energy efficient: upgrades to heating, cooling, and light sources
- Additional workroom, storage room, and staff room space
- Additional space for meeting room, conference room, programs, and exhibits
3532 Fluvanna Ave ext.
Jamestown, NY 14701Estimated construction need: $50,000
57th Senate District
150th Assembly District
Information collected 2/7/06The Fluvanna Free Library was built in 1954, and has had no significant additions or renovations since. At this time, the library's most pressing need is additional space. 1,000 additional square feet of space is needed to accommodate 10 years' growth of the collection. The estimated cost of an addition is $50,000.
Needs:
- Addition
- 1,000 additional square feet of space to accommodate 10 years' growth of the collection
- Increase public access Internet connection speed from Cable (512 Kbps to 20 Mbps) to T1
40 S. Portage St
Westfield, NY 14787Estimated construction need: $125,000
57th Senate District
150th Assembly District
Information collected 1/30/06The Patterson Library was originally built in 1908. The building was last expanded in 1994 and last renovated in 2005. Currently the library is need of improved lighting and an air conditioning system for the main floor. Lighting in the library is dark and inefficient. Each time a light bulb needs to be changed, the staff must set up a scaffold.
Construction Costs:Air conditioning: $100,000
Lighting: $25,000
TOTAL: $125,000Needs:
- Improve poor lighting in reading rooms and at circulation desk
- Air conditioning system for main floor
- Increase public access Internet connection speed from DSL (128 Kbps to 8 Mbps) to T1
|
Lighting difficulties |
2430 Rte 11
Mooers, NY 12958Estimated construction need: $3,000
45th Senate District
114th Assembly District
Information collected 1/31/06The Mooers Free Library was built in 1932, and the last major repair done to the building was a new roof in August 2005. The library is in need of new lighting. Currently the lighting is poor and deters groups from using the facility as a meeting space. The estimated cost for new lighting and plumbing repairs is $3,000.
Needs:
19 Oak Street
Plattsburgh, NY 12901Estimated construction project: $50,000
45th Senate District
114th Assembly District
Information provided 1/30/06The Plattsburgh Public Library was originally constructed around 1904. The building was last expanded in 1973 and was last renovated in 2003. The library is in need of a new heating system, which dates back to 1939, and an air conditioning system in the older portion of the building. A construction project is planned to begin in October to replace the boilers oil burner with a gas burner, repair leaks, and replace the furnace door. The estimated cost of this construction project is $50,000.
Needs:
- Replace boilers oil burner with a gas burner
- Air conditioning in older part of building
- Repair furnace door
- Fix leaks
- Increase public access Internet connection speed from DSL (128 Kbps to 8 Mbps) to T1
|
Outdated furnace |
library exterior |
20 Church St.
Port Henry, NY 12974Estimated construction need: $11,000
45th Senate District
113th Assembly District
Information collected 2/1/06The Sherman free Library was built in 1887, and the last addition was built in 1907. The building is over one hundred years old and is not wheel-chair accessible. By building a wheel-chair ramp and making the restroom wheel-chair accessible, the library could be more easily accessed by patrons with disabilities. The library is also in need of new lighting. Currently, the library is pursuing new lighting through the New York State Energy Development Agency.
Estimated cost of upgrades:
- Ramp: $3,000
- Wheel-chair accessible bathroom: $3,000
- Lighting: $5,000
- Total: $11,000
Needs:
- New lighting
- Wheel-chair ramp
- 700 square feet of additional space to accommodate 10 years' growth of the collection
- Make all areas of the library accessible to people in wheelchairs
- Wheelchair-accessible restrooms
- More space for public access computers
- Increase public access Internet connection speed from Cable (512 Kbps to 20 Mbps) to T1
191 E. Main Street, PO Box 10
Chateaugay, NY 12920Planned construction project: $350,000
45th Senate District
114th Assembly District
Information collected 1/30/06The Chateaugay Memorial Library was incorporated into the Chateaugay town hall in 1946, and was last renovated in 2002. The library is currently 800 square feet and lacks the space to meet the needs of patrons. A project, to rehabilitate an old highway garage into a new library, is planned to begin in spring 2007. The new building is one level and will be wheel-chair accessible throughout. Included in the plan are a new meeting space, kitchenette, larger children's area, archival room, and an exhibit space. The total construction cost for this project is $350,000.
Needs:
- Additional space to house the current collection
- 2,700 square feet of additional space
- Wheelchair-accessible restrooms
- More space for public access computers
- Improved wiring for telecommunications
- Improved parking
- Wireless internet
- Increase public access Internet connection speed from Cable (512 Kbps to 20 Mbps) to T1
24 Main Street
Marathon, NYEstimated construction need: $610,000
51st Senate District
123rd Assembly District
Information provided 3/29/06The Peck Memorial Library was built in 1893. The library is located in a historical building that needs renovation and a new heating system. Renovation of the building would allow the library to use the adjacent Opera House for community services. The total estimated cost of renovations and a new heating system is $610,000. The library is planning to apply for construction aid through the New York state $14 Million Public library construction grant program.
Needs:
- $600,000 for a new addition and renovation
- $10,000 for a new heating system that will make the building more energy efficient
- Removal of asbestos
- Make all areas of the library accessible to patrons in wheel-chairs
- Wheel-chair accessible restrooms
- Expansion to house 10 year's growth of the library collection
- Expansion to provide an adequate public meeting space
- More space for public access computers
- Renovation to provide adequate electrical wiring for computers and other equipment
1062 Chenango St
Binghamton, NY 13901Estimated construction need: $100,000
52nd Senate District
107th Assembly District
Information collected 1/4/06The Fenton Free Library was originally constructed as a home in 1820. The building was last expanded in 1971 and renovated in 2001. Currently, the library is in need of more space for public access computers. Due to space constraints and lack of funds, there are no public access computers for patrons. The library needs an addition at an estimated cost of $100,000.
Needs:
- Addition
- 400 square feet of additional meeting space
- Make meeting room accessible to people in wheelchairs
- 900 additional square feet of space to accommodate the library's current collection
- More space for public access computers
- Public access computers
1001 Park St.
Endicott, NY 13760Planned construction project: $195,000
52nd Senate District
126th Assembly District
Information collected 1/14/06The George F. Johnson Memorial Library was built in 1966, and was last renovated in 1995. Currently, the library's meeting room is not wheelchair accessible. The library is in need of two elevators, at an estimated cost of $180,000, so patrons with disabilities can access the basement and second floor. The library utilized a state construction grant during the 2005-06 grant cycle to replace its exterior doors. The new doors are more energy efficient and secure, and added to the appearance of the library. One of the new doors also has an automatic opener to assist our patrons with accessibility issues. The library, built in 1966, also needs to update the décor of the basement and second floor meeting rooms, and update main floor and exterior seating. The library is considering applying for construction aid through the New York state $14 Million public library construction grant program. Architectural studies have already been completed.
Needs met by planned construction project:
- New furnishings
- New elevators
- Make basement and second floor meeting room accessible to people in wheelchairs
Needs not met by planned construction project:
- 5,000 square feet of additional space
- Improve wiring for electrical equipment and computers
- Increase public access Internet connection speed from Cable (512 Kbps to 20 Mbps) to T1
107 Main Street
Johnson City, NYEstimated construction need: $165,000
52nd Senate District
126th Assembly District
Information collected 1/4/06The Your Home Public Library was built in 1885. The building was last expanded in 1920 and last renovated in 1982. Currently, the library is only able to use 2/3 of the buildings square footage due to the lack of ADA compliance for the basement and second floor. By opening up access to the unused space, the library would be able to conduct more community programs and open up a computer lab.
Estimated construction Costs:Wiring (electrical): $2,000
Lighting: $21,000
Window replacement: $25,000
Doors: $4,000
Wheelchair-accessible restroom: $30,000
Wheelchair ramp: $15,000
Other accessibility needs: $3,000
Replace exterior masonry: $10,000
Lighting Fixtures: $5,000
Elevator: $50,000
Total: $165,000Needs:
- 5,000 square feet of additional space
- Make all areas of the library accessible to people in wheelchairs
- Wheelchair-accessible restrooms
- More space for public access computers
- Improved wiring for electrical equipment and telecommunications
- Open up access to unused library space
- Replace deteriorating masonry on building exterior
- Replace inefficient interior lighting fixtures
- Install elevator for accessibility to all floors
3 Court Street
Norwich, NY 13815Planned construction project: $760,000
Estimated construction need: $3,000,00052nd Senate District
107th Assembly District
Information collected 1/11/06The Guernsey Memorial Library was built in 1969. The library is currently planning a construction project that will address the needs of a new boiler, air conditioner, and roof. In February 2006, the library was successful in getting a $760,000 referendum passed to pay for these needs. The library is also in need of additional space, new windows, and new doors. The estimated cost of a new addition is $3,000,000.
Needs met by construction project:
- New boiler
- Air conditioner
- Roof repairs
Needs not met by construction project:
- Addition
- 14,000 square feet of additional space
- Additional meeting space
- Increase public access Internet connection speed from DSL (128 Kbps to 8 Mbps) to T1
59 Genesee St
Greene, NY 13778Planned construction project: $3,500,000
52nd Senate District
107th Assembly District
Information collected 3/30/06The Moore Memorial Library was built in 1904, and was last renovated in 1978. The library's most pressing need at this time is additional space. Originally the library was built to house 7,500 volumes and now houses over 35,000. The library is currently in the middle of a construction project that will address the needs of a new addition, furnishings, and renovation of the existing building. Phase 1 of the project, to build the connector that will link the existing building with the new addition, began in August 2006 and will conclude approximately June of 2007. Also, being built at this time will be a new handicapped accessible entrance and amphitheater for programming. HVAC systems will be upgraded throughout the building and a computer lab will be installed. This phase is expected to cost approximately $550,000. The second phase will be to build the shell of the addition. The total cost of construction is $3,500,000.
Needs:
- 24,000 square feet of additional space
- Make all areas of the library accessible to people in wheelchairs
- Additional meeting space
- Upgrades to Heating and air conditioning systems
- Plumbing upgrades
- Parking improvements
- More space for public access computers
- Improve electrical wiring for telecommunications
- Increase public access Internet connection speed from Cable (512 Kbps to 20 Mbps) to T1
- Increase number of public access computers
|
Insufficient young adult area |
Overcrowded children's area |
Overcrowded picture book shelves |
8 Fort Hill Park
Oxford, NY 13830Planned construction project: $1,000,000
52nd Senate District
107th Assembly District
Information collected 1/10/06The Oxford Memorial Library was originally constructed in 1811, and was last renovated in 1998. Handicapped accessibility is a key issue for the library. Currently, the library is in need of a handicapped accessible restroom and meeting room. The meeting room is on the second floor of the building and cannot be accessed by patrons in wheel-chairs. A $1,000,000 expansion and renovation project was scheduled to begin in May 2006.
Needs:
- Addition
- 1,590 square feet of additional space
- Additional meeting space
- Community/program room
- Make all areas of the library accessible to people in wheelchairs
- Wheelchair-accessible restroom
- Improved electrical wiring for computers and other equipment
- Increase public access Internet connection speed from Cable (512 Kbps to 20 Mbps) to T1
152 Main Street
Morris, NYEstimated construction need: $200,000
51st Senate District
127th Assembly District
Information provided 3/15/06The Village Library of Morris was built in 1834, and was last renovated in 1970. An addition to the current building would allow the library to accommodate patrons with disabilities and create new space for computers and other technology. The Village Library of Morris has postponed automation of its collections and patron data because they lack the space to install the required computer work station. Because the library is a historic building, the library has contracted for a property survey to see if it is possible to build an addition. The estimated cost of an addition is $200,000.
Needs:
- More space to accommodate computers and other new technology
- Make all areas of the building wheel-chair accessible
- More space would allow the library to install a computer work station to transfer collection and patron data to computers
- More space to house the library collection
- Expansion to accommodate a public meeting space
- Improved electrical wiring to accommodate computers and other technologies
- Increase public access Internet connection speed from Cable (512 Kbps to 20 Mbps) to T1
101 Main Street
Philmont, NY 12565Planned construction project: $250,000
41st Senate District
99th Assembly District
Information collected 2/7/06The Philmont Public Library was purchased in 2003 and the building has not had any significant additions or renovations since it was purchased. Currently, the library's public meeting space holds ten people. The library is planning to construct a $250,000 addition that will house the local history collection and serve as a program area. The project is scheduled to begin in April 2007, dependent on grant funds.
Needs:
- 800 additional square feet of space to be used for programming, community events, and public meetings, including civic groups
- Parking lot resurfaced
- Construction of inside stairs to make the second floor available for storage and a local history section
- New entry way providing space for gathering and display of the talent of local artists and the accomplishments of local civic groups
313 Main Street
Beacon, NY 12508Estimated construction needs: $9,900,000
41st Senate District
100th Assembly District
Information collected 1/10/06The Howland Public Library was built in 1948, and was last renovated in 2003. The library is in need of an additional 21,000 square feet of space to adequately serve the population. In 2005, a $9,900,000 bond was voted down 3-1 that would have funded construction of a new library. The need for a new or dramatically improved facility remains.
Needs:
- Upgrades to heating, air conditioning, windows, and doors to achieve greater energy efficiency
- 21,000 square feet of additional space
- Make all areas of the library accessible to people in wheelchairs
- Wheelchair-accessible restrooms
- More space for public access computers
- Improved wiring for electrical equipment and telecommunications
- Increase public access Internet connection speed from Cable (512 Kbps to 20 Mbps) to T1
GED class squeezed into local history room
Children's area in middle of library
Alley behind library (occasional source of flooding)
488 Freedom Plains Rd
Poughkeepsie, NY 12603Estimated construction need: $7,000,000.
41st Senate District
102nd Assembly District
Information collected 1/9/06The LaGrange Association Library is 5,791 square feet and was last renovated in 1996. The building is part of a rented facility and does not have adequate room to house the current collection. The estimated cost of constructing a new building is $7,000,000.
Needs:
93 Market Street
Poughkeepsie, NY 1260141st Senate District
100th Assembly District
Information collected 2/7/06The Poughkeepsie Public Library was built in 1898. The building's last addition and renovation were completed in 1923. Two key problems facing the library are wheel chair accessibility and space constraints. The library has an expansion project planned to begin in June 2006. The cost or extent of the project is unknown. The library is considering applying for construction aid through the New York state $14 Million Public library construction grant program.
Needs:
- Net 37,000 square feet of additional space
- Make all areas of the library accessible to people in wheelchairs
- 10,000 additional square feet of space to house the library's current collection, and 15,000 additional square feet to accommodate 10 years' growth of the collection
- 2,000 square feet of additional public meeting space
- More space for public access computers
- Improved wiring for electrical equipment and telecommunications
52 North Lake Road
Haines Falls, NY 12436Estimated construction need: $2,000,000
18th Senate District
51st Assembly District
Information provided 1/10/06The Haines Falls Free Library was built in 1915, and has not been significantly expanded or renovated since. The library is small and far away from the population center. Currently the library has construction plans to build a new library at an estimated cost of $2,000,000. Construction plans will be put into effect once land can be secured for the new library.
Needs:
- Make public areas of the library accessible to people using wheelchairs
- Wheelchair-accessible restrooms
- 2,500 square feet of additional space to house the current collection
- 2,000 additional square feet of space to accommodate 10 years' growth of the collection
- Meeting space
- Archival center
- Additional space for public access computers
- Increase public access Internet connection speed from DSL (128 Kbps to 8 Mbps) to T1
93 Main St.
New Paltz, NY 12561Planned construction project: $2,679,482
42nd Senate District
101st Assembly District
Information updated 11/20/06The Elting Memorial Library was originally constructed around 1800 as the Solomon Elting Homestead. It is an example of the Dutch stone vernacular architecture found in Ulster County especially on Historic Huguenot Street in New Paltz, Hurley, and the stockade area of Kingston. The building was gifted to the community for a library in 1920. Additions were made to the library in 1962 and 1978. The library was placed on the National and State register of Historic places in 2004.
The library began a construction project, to build an addition and renovate the existing building, in January 2005. Actual construction began in late August, 2006. The project is staged and financed over five years with a completion date of 2010. All construction needs will be met upon completion of the project. The library is planning to apply for construction aid through the New York state $14 Million public library construction grant program to remedy ADA issues not known at the time of construction, to complete the exterior restoration of the land-marked stone building, and for additional shelving needed for the new addition.Needs:
- Addition
- Renovation of existing building
- ADA issues
2047 St. Rt. 32
Modena, NY 12548Estimated construction need: $891,800
39th Senate District
103rd Assembly District
Information collected 1/31/06The Plattekill Public Library was built in 1909, and was last renovated in 1998. The library is currently on the second floor of the building and cannot be accessed by patrons in wheel-chairs. A new facility is needed to meet the needs of the community. The estimated cost of construction is $891,800.
Construction Costs:New facility: $800,000
Lighting: $800
Window replacement: $2,000
Roof: $10,000
Wheelchair-accessible restroom: $30,000
Elevator: $20,000
Ramps: $4,000
Parking Improvements: $25,000
Total: $891,800Needs:
- New facility
- New lighting
- New windows
- New roof
- Elevator
- Make all areas of the library accessible to people in wheelchairs
- Wheelchair-accessible restrooms
- Parking improvements
- More space for public access computers
- Improved electrical wiring for computers and other equipment
- Increase public access Internet connection speed from Cable (512 Kbps to 20 Mbps) to T1
189 Main Street
Jordanville, NY 1336151st Senate District
117th Assembly District
Information provided 3/13/06The Jordanville Public Library was constructed in 1907 and has not had any significant additions or renovations since. The library is currently faced with two major construction needs. The construction needs include a new roof and restoration of the 4 large columns that support the overhanging roof at the front of the library.
Needs:
- Additional space to accommodate growth of the library collection
- New roof
- Restoration of four columns that support the overhanging roof at the front of the library
- Additional space for public meetings
- Renovations to make restrooms accessible to patrons with disabilities
1 South Main Street
Middleville, NY 1340651st Senate District
117th Assembly District
Information provided 3/21/06The Middleville Free Library was constructed in 1999. The library is currently in need of a wheel-chair accessible electronic door and upgraded shelving. New shelving for the collection would help utilize space better and help with the aesthetics of the library.
Needs:
- Wheel-chair accessible electronic door
- New shelving to better utilize space used for library collections
- Additional space to accommodate 10 years' growth of the collection
- Increase public access Internet connection speed from Cable (512 Kbps to 20 Mbps) to T1
102 W. Center Street
Canastota, NY 13032Planned construction project: $22,000
Additional construction needs: $15,00049th Senate District
111th Assembly District
Information collected 3/29/06The Canastota Public Library was originally constructed in 1903, and was last renovated in 2004. The library is currently in need of additional space for a public meeting/program area, a new roof, and new wiring to accommodate new technologies. A construction project, to address the need of a new roof, is planned to begin in spring 2007, at a total cost of $22,000.
Needs:
- New roof
- Parking improvements
- New lighting
- Renovations to restrooms
- 5,000 square feet of additional space (minimum)
- More space for public access computers
- Improved wiring for electrical equipment and telecommunications
87 East Main Street
Morrisville NY 13408Planned construction project: $27,500
Estimated construction need: $400,00049th Senate District
111th Assembly District
Information collected 3/22/06The Morrisville Public Library was originally constructed in 1850, and was last expanded in 1993 and renovated in 2006. The library's most pressing needs at this time are additional space and improved electrical wiring. The second floor of the library could be used for additional space with the proper renovations and installation of an elevator. A construction project was planned to begin in July 2006, to address the needs of additional computer equipment and upgrades to electrical wiring. The library is planning to apply for construction aid through the New York State $14 Million public library construction grant program to improve electrical wiring upstairs.
Needs met by construction project:
- Upgrades to electrical wiring
- New computer equipment
Needs not met by construction project:
- 30,000 square feet of additional space
- Make all areas of the library accessible to people in wheelchairs
- Elevator
- Upgrades to heating and air conditioning systems
- New Roof
- Repairs to foundation
- Increase public access Internet connection speed from Cable (512 Kbps to 20 Mbps) to T1
303 Genesee Street
Utica, NY 13501Planned construction project: $1,500,317
47th Senate District
111th Assembly District
Information collected 1/4/06The Utica public Library was built in the first decade of the 1900's, and was last renovated in 1991. The building is deteriorating and is in need of several repairs. A construction project, at a total cost of $1,500,317, began in February 2006. The library is currently in the midst of installing a new HVAC system and has completed installation of a fire alarm system as well as emergency lighting and lit exit signs. The last element of the construction project is to repair/restore the library's windows. The library is in the process of securing architectural services to progress with that project and has secured a federal grant for $250,000.
Needs met by construction plan:
Needs not met by construction project:
38 South Market Street
Johnstown, NY 12095Estimated construction need: $1,750,000
44th Senate District
117th Assembly District
Information collected 3/14/06The Johnstown Public Library was built in 1902. The building's last addition was built in 1996, and it was last renovated in 2006. The library needs 6,000 additional square feet of space to accommodate 10 years' growth of the collection. The addition will cost an estimated $1,750,000.
Needs:
19 Willett Street
Fort Plain, NY 13339Estimated construction need: $850,000
44th Senate District
105th Assembly District
Information collected 2/7/06The Fort Plain Free Library was constructed in 1836, and was last expanded in 1984. The library's most pressing needs at this time are a 1,300 square foot addition and renovations to the existing facility. A needs assessment, feasibility study, and concept design by an architect have been completed. The estimated cost of an addition and renovations is $850,000. The library is planning to apply for construction aid through the New York State $14 Million public library construction grant program.
Needs:
- 1,300 square ft. addition to house a community room and a larger and more user friendly children's room
- Restoration and repairs to the exterior of the building, including siding, front porch, and landscaping
- Renovations to the interior of the existing facility to better reflect the historic nature of the building and highlight some of its better features such as the matching fireplaces in the twin parlors
- Upgrades to existing lights and windows for better performance as well as energy efficiency
- Construction of additional ADA compliant restrooms
- More space for public access computers
- Improve wiring to assure the library can meet telecommunication needs of the future
2300 Elmwood Avenue
Rochester, NY 1461856th Senate District
132nd Assembly District
Information collected 3/27/06The Brighton Memorial Library was built in 1953, and was last expanded in 1999 and renovated in 1998. Current space needs for library services include a separate story hour room, additional space for teens to gather, more space for internet use, and a larger meeting room for programs. Many of the programs held by the library, especially those geared toward children, have exceeded meeting space capacity. Larger spaces were originally planned for the 1999 addition but space was significantly reduced due to lack of funding.
Needs:
- Additional space for a separate story hour room
- Additional meeting space to accommodate larger library programs of 200+
- Expanded teen area
- More space for internet use
- Staff area for lunch/dinner
3333 Chili Avenue
Rochester, NY 14624Estimated construction need: $250,000
62nd Senate District
133rd Assembly District
Information collected 3/23/06The Chili Public Library was built in 1997, and has not had any significant additions or renovations since. The library is in need of additional space for the children's room and public access computers. The estimated cost of a new addition is $250,000. The library has no plans for a construction project at this time.
Needs:
- Additional space for children's room
- More space for public access computers
- 5,000 square feet of additional space
1605 Buffalo Road
Rochester, NY 14624Estimated construction cost: $2,000,000-$4,000,000
62nd Senate District
133rd Assembly District
Information collected 3/24/06The Gates Public Library was built in 1968, and was last renovated in 1993. The library is overcrowded and needs additional space to accommodate patron's needs. A construction project, to expand the existing building, is currently in the planning stages. The estimated cost of construction is $2,000,000-$4,000,000.
Needs:
- Upgrades to heating and air conditioning to achieve greater energy efficiency
- 8,000 additional square feet of space to accommodate 10 years' growth of the collection
- Additional parking
- New lighting
- New carpeting
- Painting
- Improved electrical wiring to accommodate new technologies
455 Calkins Road
Rochester, NY 1462355th Senate District
130th Assembly District
Information collected 3/27/06The Henrietta Public Library was built in 1977, and was last renovated in 2000. The library is in need of an additional 15,000 square feet of space to accommodate 10 years' growth of the collection. At this time, the library is in the beginning stage of planning for a new facility. Construction of a new facility is estimated to take place in ten years.
Needs:
- 15,000 square feet of additional space to accommodate 10 years growth of the collection
2180 Ridge Road East
Rochester, NY 14622Estimated construction need: $6,000,000
55th Senate District
132nd Assembly District
Information collected 3/29/06The Irondequoit Public Library-Helen McGraw Branch was built in 1963, and was last renovated in 1990. 25,000 square feet of space is needed to adequately house the current collection and accommodate 10 years' growth of the collection. A planned construction project, to construct a new facility, is planned to begin in early 2007. The total cost of constructing a new library is $6,000,000.
Needs:
- New facility
- 25,000 square feet of space
48 Cooper Road East
Rochester, NY 14617Estimated construction need: $6,000,000
55th Senate District
132nd Assembly District
Information collected 3/29/06The Irondequoit Public Library-Pauline-Evans Branch was built in 1963, and was last renovated in 1987. 25,000 square feet of space is needed to adequately house the current collection and accommodate 10 years' growth of the collection. A planned construction project, to construct a new facility, is planned to begin in early 2007. The total cost of constructing a new library is $6,000,000.
Needs:
- New facility
- 25,000 square feet of space
15 Monroe Street
Honeoye Falls, NY 14472Planned construction project: $3,500,000
55th Senate District
130th Assembly District
Information collected 3/24/06The Mendon Public Library was built in 1936, and was last expanded in 1975. Wheel-chair accessibility is a continuous problem for library patrons. Currently, the bathroom, meeting room, and part of the collection, cannot be accessed by patrons in wheel-chairs. The library is in the early stages of planning construction of a new facility. The approximate cost of construction is $3,500,000.
Needs:
- New facility
- 12,500 square feet of additional space
- Make all areas of the library accessible to people in wheelchairs
- Wheelchair-accessible restrooms
- More space for public access computers
- Additional meeting space for children's programs
|
Overcrowded book shelves |
7 West Avenue, P.O. Box 785
Hilton, NY 14468
Estimated construction need: $1,000,000
56th Senate District
139th Assembly District
Information collected 3/24/06
The Parma Public Library was built in 1978 and has not had any significant additions or renovations since. The library's most pressing need at this time is additional space. Currently, there is no space for quiet study, for the expansion of public access computers, or for expansion of the collection. For each new book that the library receives, one must be thrown away. The library needs a 4,000 square foot addition at an estimated cost of $1,000,000. The library is also looking into the possibility of constructing a new 12,000-16,000 square foot facility, at an estimated cost of $3,000,000.
Needs:
115 South Avenue
Rochester, NY 14604Estimated construction need: $3,530,000
Information collected 11/22/06
The Central Library of Rochester and Monroe County was built in 1936, and was last expanded in 1997. The library is currently in need of asbestos encapsulation, repairs to skylights, urban library park beautification, and foundation and plaza repairs. The estimated cost of all construction needs is $3,530,000.
Needs:
- Asbestos encapsulation: $175,000
- Repairs to skylights: $155,000
- Urban library park beautification: $1.8 million
- Central Library Plaza & Foundation Repairs: $1.4 million
939 Bay Street
Rochester, NY 14609Planned construction project: $3,000,000
Information collected 3/28/06
The Rochester Public Library-Sully Branch was built in 1953 and has had no significant additions or renovations since. The library is currently in need of an additional 7,000 square feet of space. A construction project, to build a new multi-purpose community center and library, is scheduled to begin in 2007-2008. The total cost of the planned Ryan Library and Recreation Center is $3,000,000.
Needs:
- New recreation center and library
- 7,000 square feet of additional space
28 Main Street
Scottsville, NY 1454655th Senate District
131st Assembly District
Information collected 3/24/06The Scottsville Free Library was built in 1892, and was last renovated in 2003. The library's most compelling need at the time is restoration/renovation to the children's area. The children's room is the last public area in the library that still has a suspended acoustical tile ceiling, fluorescent lights, and stained carpeting. Recently the library discovered that a section of the building's foundation and wood support is in need of repairs. The library is planning to apply for construction aid through the New York state $14 Million public library construction grant program to fix the foundation and wood support.
Needs:
- Restoration/renovation of the children's area
- Repair section of foundation and wood support
2288 Bedford Avenue
Bellmore, NY 11710Estimated construction need: $1,250,000
8th Senate District
19th Assembly District
Information collected 1/5/06The Bellmore Memorial Library was built in 1950 and last expanded in 1990. The current building has a leaking roof and an antiquated heating and air conditioning system. The library needs additional space, as well as repairs to the existing building.
The expenses for this addition and renovation would include:
Needs:
1886 Front Street
East Meadow, NY 11554Planned construction project: $1,300,000
Estimated construction need over 5 years: $10,700,0006th Senate District
15th Assembly District
Information collected 10/24/06The East Meadow Public Library was built in 1959, and was last expanded in 1984 and renovated in 2003. The library is in need of additional space for programs and a young adult area. Two construction projects are planned for spring 2007 and include replacement of the roof and construction of a Young Adult Area. The total cost of these two projects is $1,300,000.
Construction Costs:Construction: $1,000,000
Young Adult Area: $300,000
Total: $1,300,000Needs met by construction project:
- New roof
- Young adult/teen area
Needs not met by construction project:
- Additional programming space
- 20,000 square feet of additional space
- Parking improvements
- Replace and reconfigure the front entrance
- Replace elevator
- New furniture in adult areas
- New carpeting throughout library
- Reconfigure shelving to make it accessible
144 West Merrick Road
Freeport, New York 11520Estimated construction need: $496,150
8th Senate District
19th Assembly District
Information collected 1/31/06The Freeport Memorial Library was built in 1928, and was last expanded in 1986. The library's most pressing construction need is to repair the leaking roof and outdated air conditioning system in one wing of the library. Wheel-chair accessibility is another problem for the library. Installation of automatic doors would make it easier for patrons (especially patrons using walkers or wheelchairs or parents with strollers) to enter the library. The library would also like to install security cameras for the safety of its staff and patrons. The library is planning to apply for construction aid through the New York state $14 Million public library construction grant program.
The expenses for this renovation would include:
- Air conditioning: $91,850
- Roof: $248,800
- Replacement of carpeting, circulation desk, and shelving (including automatic doors): $127,000
- Security cameras: $28,500
- TOTAL: $496,150
Needs:
- 10,000 additional square feet to house the collection
- 10,000 additional square feet to accommodate 10 years' growth of the collection
- Replacement of HVAC system to improve the building's energy efficiency
- Roof repair
- Installation of automatic doors for easier handicapped access
- Installation of security camera for the safety of patrons and staff
60 Verona Place
Valley Stream, NY 11582-3011Estimated construction need: $600,000
9th Senate District
14th Assembly District
Information provided 1/5/06The Henry Waldinger Memorial Library in Valley Stream was originally constructed in 1962, and had a major interior renovation in 2005. The library needs a 1,000 square foot addition for a quiet study area. Resurfacing of the building and the replacement of two building entrances is also needed at this time. The estimated cost of construction is $600,000.
Estimated Construction Costs:
Addition: $500,000
Reconstruction of entry ways: $100,000
Total: $600,000Needs:
- Addition
- Meeting/program room
- Resurfacing of exterior of building
- Reconstruction of two entry ways
- Additional space for library collections
- Make the non-fiction section and other areas accessible to patrons in wheelchairs
- Additional space for public access computers
- Improved wiring to handle electrical equipment or telecommunications
|
Entry way photos |
|||
Merrick Library Wing
2369 Merrick Avenue
Merrick, NY 11566Estimated construction need: $500,000
8th Senate District
17th Assembly District
Information collected 1/31/06The new Merrick Library was opened December 2005. As a new building, it has no major construction needs. However, a historical building which was the original library, and is used as an annex of the current library was destroyed in a fire, and insurance will not cover the entire cost of reconstruction. Work on the rebuilt wing will begin in the fall of 2006, and the estimated cost will be $500,000.
One Library Drive
Port Washington, NY 11050Estimated construction need: $850,000
7th Senate District
16th Assembly District
Information collected 2/7/06The Port Washington Public Library was built in 1969, and was last expanded and renovated in 2001. Currently, the library's roof and elevator are in need of replacement. The roof leaks and the elevator is old, making replacement parts hard to find. The estimated cost of construction is $850,000.
Needs:
- Replacement of original Roof
- New elevator
- 8,000 square feet of additional space
27 West Fulton Ave
Roosevelt, NY 11575Estimated construction need: $6,500,000
8th Senate District
18th Assembly District
Information provided 4/28/06The Roosevelt Public Library was built in 1994, and was last renovated in 1998. While relatively new, the building does not fill the cultural and educational needs of the small community that it serves. Construction of a new building and expansion of the existing library would provide space for classes and programs, and make the library the center of the community. The new facility will serve as a cultural center as well as a library.
New facility: $1,500,000
Addition: $5,000,000
TOTAL: $6,500,000
Needs:
- 14,000 additional square feet to accommodate 10 years' growth of the collection
- 2,600 additional square feet of public meeting space
- Building upgrades to improve energy efficiency
252 Chestnut Street
West Hempstead, NY 11552Planned construction project: $6,800,000
6th Senate District
18th Assembly District
Information collected 2/1/06The West Hempstead Public Library building was originally built as a school in 1950, and was last renovated in 1990. The building is small, cramped, and inaccessible for patrons in wheel-chairs. Currently, the library is in need of an additional 20,000 square feet of space to house the current collection and to accommodate 10 years growth of the collection. Construction of a new library began in March 2006, at a total cost of $6,800,000. The library is planning to apply for construction aid through the New York state $14 Million public library construction grant program.
Construction Costs:Land Acquisition: $1,800,000
Construction: $5,000,000
Total: $6,800,000Needs:
- 21,000 square feet of additional space
- Make all areas of the library accessible to people in wheelchairs
- 10,000 additional square feet of space to house the current collection, and 10,000 additional square feet of space to accommodate 10 years' growth of the collection
- Meeting/study space
- More space for public access computers
- Improved wiring for electrical equipment and telecommunications
3 North Pearl St.
Oakfield, NY 14125Estimated construction need: $107,000
61st Senate District
139th Assembly District
Information collected 1/19/06The Haxton Memorial Library was built in 1964, and has had no significant additions or renovations since. A central issue for the library is wheel-chair accessibility. The children's area is located on the lower level of the building, which cannot be accessed by patrons in wheel-chairs. The library's most compelling needs is an elevator so that patrons in wheel-chairs can have access to all areas of the library. The library is planning to apply for construction aid through the New York state $14 Million public library construction grant program.
Estimated Construction Costs:Elevator: $90,000
Window replacement: $10,000
Bathroom on lower level: $7,000
Total: $107,000Needs:
- Elevator
- Window replacement
- Make all areas of the library accessible to people in wheelchairs
- Lower level bathroom
157 N Real St.
Cape Vincent, NY 13618Planned construction project: $38,000
48th Senate District
118th Assembly District
Information collected 3/29/06The Cape Vincent Community Library was built in 1968, and was last renovated in 2000. Two primary needs of the library are additional shelving and meeting/program space. The library collection was extensively weeded two years ago, so reduction in the size of the collection is no longer an option to create space. The library is applying for $38,000 in NYS Construction Grant funds to add a new multipurpose/meeting room on to the back corner of the building and to combine the current boardroom with the adult fiction room. This would provide 300 square feet of additional space for shelving, and 648 square feet of meeting room.
Needs:
- Additional shelving space
- New roof
- New heating system/energy efficient boiler
- Meeting/program space
- Wheel-chair ramp
- 1,500 additional square feet of space
- Improved lighting in parts of the library
- Additional insulation around rim of the building
- Improved wiring for electrical equipment and telecommunications
- Increase public access Internet connection speed from Cable (512 Kbps to 20 Mbps) to T1
412 Budd St.
Carthage, NY 1361948th Senate District
122nd Assembly District
Information collected 5/8/06The Carthage Free Library's foremost problem is handicapped accessibility. Currently, the library's bathrooms are not wheel-chair accessible and there is no alternative to using the stairs. The library is in need of several renovations to make it ADA compliant and to make it user friendly for patrons with disabilities.
Needs:
- Elevator
- 2,000 square feet of additional space
- Make all areas of the library accessible to people in wheelchairs
- Wheelchair-accessible restrooms
- Wheel-chair ramp
- Meeting/program space
- More space for public access computers
3 Church St.
Parish, NY 13131Planned construction project: $51,300
48th Senate District
115th Assembly District
Information collected 4/1/06The Parish Public Library was built in 1923 and has had no significant additions or renovations since. The library's primary need at this time is updated electrical wiring. The current wiring was installed in 1923 and circuits blow when overloaded and sparks sometimes fly when the old push button lights are turned off or on. A construction project, to address nearly all of the library's needs, is planned to begin as soon as all funding is in place. The library is applying for construction aid through the New York state $14 Million public library construction grant program.
Needs met by construction project:
- Upgrades to electrical wiring for computers and other equipment
- Upgrades to wiring for telecommunications
- Renovation to downstairs room
- Wheel-chair accessible restroom
- New emergency exit doors
- Upgrades to plumbing
- Chairlift to downstairs
- More space upstairs for public access computers and books
105 Main Street
Hermon, NY 1365248th Senate District
122nd Assembly District
Information collected 1/11/06In July 2006, the Hepburn Library of Hermon completed a construction project to install a wheel-chair lift. Installation of the lift has allowed patrons with wheel-chairs to have access to the library and basement. The library's most pressing need now is to renovate its bathroom and make it wheel-chair accessible. The library is planning to apply for construction aid through the New York state $14 Million public library construction grant program to fund this project.
Needs:
- Wheelchair-accessible restrooms
- Increase public access Internet connection speed from Cable (512 Kbps to 20 Mbps) to T1
312 Washington St.
Ogdensburg, NY 13669Estimated construction need: $25,000
48th Senate District
118th Assembly District
Information collected 1/9/06The Ogdensburg Public Library was originally built in 1887, and was last expanded in 1922 and renovated in 2005. Interior renovations are currently needed to maximize shelf space, seating, storage, and operations. Due to the age of the building, there is also a need to upgrade the electric and plumbing. The estimated construction need of the library over the next five years is $300,000.
Needs:
- 4,000 square feet of additional space
- New elevator
- Roof repairs
- Parking improvements
- New flooring
- Upgrades to electricity and plumbing
- Increase public access Internet connection speed from Cable (512 Kbps to 20 Mbps) to T1
60 Church Street
Gouverneur, NY 13642Estimated construction need: $350,000
48th Senate District
122nd Assembly District
Information collected 4/14/06The Reading Room Association of Gouverneur was built in 1900, and was last expanded in 1968 and renovated in 1995. The library currently needs to renovate the attic to create additional space. Public access computers take up the space that was used prior for a study/reading area. A planned construction project is planned to begin in 2007, at a total cost of $350,000.
Construction Costs:Construction: $298,800
Wiring (electrical): $21,200
Wiring (telecommunications): $10,000
Equipment: $8,000
Furnishings: $12,000
Total: $350,000Needs:
- Reading/study area
- Air conditioning system
- Attic renovation
- 2,000 additional square feet of space
- More space for public access computers
- Improved wiring for electrical equipment and telecommunications
- Increase public access Internet connection speed from Cable (512 Kbps to 20 Mbps) to T1
310 Tulip St.
Liverpool, NY 13088Planned construction project: $495,000
Long range needs: $2,300,00050th Senate District
1119th Assembly District
Information collected 1/30/06The Liverpool Public Library was built in 1974, and was last expanded in 1984. The library is currently in need of a new roof, wheel-chair ramp, insulation, and repairs to the concrete support tiers. A project is planned to begin in January 2007 to address these needs. The total cost of the project is $495,000.
Immediate Needs:
- New roof
- Wheel-chair ramp
- Insulation
- Repair concrete support piers
Longer range needs - no funding in place:
- Addition of 5,000 square feet and some interior renovation - 2.3 million dollars
2 Slocombe Ave.
Marcellus, NY 13108Planned construction project: $2,062,500
50th Senate District
124th Assembly District
Information collected 1/28/06The Marcellus Free Library was opened in 1915 and has been located in its present facility since 1934. The library was last expanded and renovated in 1976. Lack of space to house a growing collection of children's materials, media, and public access computers is the library's primary issue at this time. Currently patrons in wheel chairs do not have access to the children's area or the library's restroom. Construction of a new facility is planned to begin in May 2007, at a total cost of $2,062,500.
Needs:
- Upgrades to heating and air conditioning to achieve greater energy efficiency
- 4,700 square feet of additional space
- Make all areas of the library accessible to people in wheelchairs
- Wheelchair-accessible restrooms
- More space for public access computers
- Improved wiring for electrical equipment and telecommunications
- Additional meeting/program space
2 Washington Street
Livonia, NY 14487Estimated construction cost: $1,200,500
59th Senate District
130th Assembly District
Information collected 2/8/06The Livonia Public Library was built in 1927 and has had no significant additions or renovations since. The library has several needs that need to be met at this time. Currently, the lower level of the library is inaccessible to patrons in wheel-chairs and space constraints have a negative impact on programs. The library is in need of a new facility at an estimated cost of $1,200,500.
Construction Costs:
Land acquisition: $150,000
Construction: $1,000,000
Wiring (electrical): $20,000
Wiring (telecommunications): $5,000
Equipment: $25,000
Furnishings: $500
Total: $1,200,500Needs:
- New facility
- 10,000 square feet of additional space
- Make all areas of the library accessible to people in wheelchairs
- Wheelchair-accessible restrooms
- More space for public access computers
- Improved wiring for electrical equipment and telecommunications
- Study Area
- Parking improvements
- Additional collection space
- Increase public access Internet connection speed from Cable (512 Kbps to 20 Mbps) to T1
3818 County Road 40
Bloomfield, NY 14469Estimated construction need: $10,000
54th Senate District
130th Assembly District
Information collected 3/20/06The Allens Hill Free Library was built in 1970, and was last expanded and renovated in 2004. The Library currently is without plumbing and lacks enough property to install a septic system and well. Patrons needing to use the restroom are forced to use an incinolet toilet and antibacterial wipes. The library is in the process of securing an acre of property to adjoin the current lot in order to perform the necessary plumbing construction.
Needs:
- 500 square feet of additional space
- Septic system
- Well
- Increase public access Internet connection speed from Cable (512 Kbps to 20 Mbps) to T1
8708 Main Street
Honeoye, NY 14471Estimated construction need: $33,000
59th Senate District
130th Assembly District
Information collected 3/23/06The Honeoye Public Library was built in 1968, and was last renovated in 1999. The library is currently in need of a meeting room, roof repairs, and additional collection space. Since 1968, library use and circulation has increased significantly. Additional library space is needed to adequately serve the community.
Needs:
- Upgrades to heating
- Parking improvements
- Meeting room
- Repairs to concrete areas on main landing and existing steps ($3,200)
- Roof repairs ($29,800)
- 2,200 additional square feet of space to accommodate the library's current collection, and 4,700 additional square feet to accommodate 10 years' growth of the collection
- Increase public access Internet connection speed from Cable (512 Kbps to 20 Mbps) to T1
67 Canal Street
Lyons, NY 14489Planned construction project: $1,700,000
54th Senate District
128th Assembly District
Information collected 2/13/06The Lyons Public Library was originally constructed in 1860 and has had no significant additions or renovations since. Currently, the library is overcrowded and unable to meet the needs of the community. In December 2005, the school district passed a $1,500,000 bond referendum for the renovation of a new building and construction of a 7,480 square foot addition. Construction is scheduled to begin in spring 2007.
Construction Costs:
Renovation of new building and addition: $1,500,000
New furnishings: $200,000
Total: $1,700,000Needs:
- Additional programming space
- 7,480 square feet of additional space
- Make all areas of the library accessible to people in wheelchairs
- Wheelchair-accessible restrooms
- More space for public access computers
- Improved wiring for electrical equipment and telecommunications
- Parking improvements
- Increase public access Internet connection speed from Cable (512 Kbps to 20 Mbps) to T1
4036 Maple Avenue
Marion, NY 1450554th Senate District
128th Assembly District
Information collected 2/9/06The Marion Public Library was originally constructed around 1910, and was last expanded in 2001 and renovated in 2006. The library recently completed a $42,000 renovation project to make the basement into a program/meeting area in May 2006. The library's main construction need at this time is new outdoor lighting.
Needs:
- New outdoor lighting
- More space for public access computers
6817 Main Street
Red Creek, NY 13143Planned construction project: $10,000
54th Senate District
128th Assembly District
Information collected 3/13/06The Red Creek Free Library was originally constructed in 1700 and has not had any significant additions or renovations since. The library's primary need at this time is additional space and a public meeting area. Currently the library is planning to remove a portion of the wall separating the library vestibule from the interior, along with the interior door, to allow for easier access to the library and create more useable space. The library is also planning to construct a custom circulation desk/work area that will make better use of limited space and free up some additional space. The estimated cost of construction is $10,000. The library is planning to apply for construction aid through the New York state $14 Million public library construction grant program.
Needs:
- Meeting space
- Elevator
- Make all areas of the library accessible to people in wheelchairs
- Parking improvements
- Increase public access Internet connection speed from Cable (512 Kbps to 20 Mbps) to T1
3600 Lorraine Drive
Walworth, NY 14568Planned construction project: $3,000,000
54th Senate District
128th Assembly District
Information updated: 10/30/06The Walworth-Seely Public Library was built in 1992 and has had no significant additions or renovations since. The library has seen a dramatic increase in circulation over the past 13 years, 35,162 in 1993 to 99,905 in 2005. Currently, the library is in need of additional space to accommodate programming, a study area, and a teen/young adult area. The library is currently surveying groups of stakeholders for input into what the new library should have.
The Long Range Planning Community Advisory Committee determined that the three service responses that the library should have are: commons, life-long learning, and current titles and topics. To meet these needs, additional space is critical.
Needs:
- 15,000+ square feet of additional space
- Teen/young adult area
- Study spaces-for large, small, and in-between groups
- Additional program spaces-multiple sizes, i.e., to accommodate groups of 5, 25, 75 or more
- More space for public access computers
- Increase public access Internet connection speed from Cable (512 Kbps to 20 Mbps) to T1
6380 Route 21
Williamson, NY 14589Estimated construction cost: $30,000
54th Senate District
128th Assembly District
Information collected 2/8/06The Williamson Free Public Library was built in 2004 and has had no significant additions or renovations since. The library's primary need at this time is improved handicapped parking. A potential location for a new parking lot has been identified but would require a redesigning of the parking area, removal of a concrete sidewalk, redesign of the drainage system, and relocation of outdoor lighting. The estimated cost of construction is $30,000.
Needs:
- Improved handicapped parking
- Additional storage space
146 Main St.
Attica, NY 140112006-2007 Planned construction project: $13,000
Long-Range Planned construction project: $1,135,00059h Senate District
147th Assembly District
Information collected 3/13/06The Stevens Memorial Community Library was built in 1892, and was last expanded in 1991. Handicapped accessibility is a central issue for the library. Currently, the main entrance and many of the adult book shelves are not handicapped accessible. The Stevens Memorial Community Library is currently updating lighting fixtures in the original building and in the front addition. The fixtures are not energy efficient and have become brittle during the last 35 years. These lights will be new electronic starters and will be able to be duplicated for the long-range plan listed below. The library is also replacing the 18-year-old furnace that heats the back portion of the library making sure it will accommodate the planned long-range construction. The new energy efficient furnace will be installed to increase energy use with the other efficient furnace for the front of the building.
Energy efficient costs:
Furnace: $3000
Lighting: $10,000
Total cost: $13,000The library's long range plan is to build an addition to the front and back of the library. The new additions would move the main entrance off the side of the building to the back of the building, allowing for improved safety and accessible doors for the handicapped and children. Construction of these new additions is scheduled to begin in April 2008, at a total cost of $1,135,000
Addition Costs:Construction: $1,000,000
Wiring (electrical): $30,000
Wiring (telecommunications): 10,000
Equipment: $25,000
Furnishings: $30,000
Automatic handicapped doors, ramp, windows, and new entrances: $40,000Needs:
- Additions
- 3,000 square feet of additional space
- Make all areas of the library accessible to people in wheelchairs
- Automatic entrance doors
- Wheelchair-accessible restrooms
- New windows
- Improve wiring for electrical equipment and telecommunications
- Increase public access Internet connection speed from Cable (512 Kbps to 20 Mbps) to T1
43 Harrisburg Road
Stony Creek, NY 12878Estimated construction need: $500,000
45th Senate District
113th Assembly District
Information collected 2/14/06The Stony Creek Free Library was built in 1960. The building was last expanded in 1994 and last renovated in 2005. Currently, the library is overcrowded and not user friendly. Due to space constraints, the library has been actively looking into purchasing a new library. The library is in the process of trying to acquire a closed church property that is next to the existing library. The estimated cost of this project is $500,000.
Needs:
- 1500 square feet of additional space
- Additional meeting area space
- Improve handicap access
- Increase shelving space
- New office/work area
- Quiet reading/study area
- Young adult/teen area
- School room with furnishing
- More space for public access computers
- Increase public access Internet connection speed from DSL (128 Kbps to 8 Mbps) to T1
33 West Main Street
Granville, NY 12832Estimated construction need: $2,000,000
45th Senate District
112th Assembly District
Information collected 1/20/06The Pember Library and Museum was built in 1909 and has had no significant additions or renovations since. The library is currently in need of 5,000 additional square feet of space to accommodate 10 years' growth of the collection and to create a meeting space. In addition to space, the library needs an elevator so that patrons with disabilities can access the second floor. The library is scheduled to begin building an addition in May 2006, at a total cost of $2,000,000.
Needs:
- 5,000 square feet of additional space
- Make all areas of the library accessible to people in wheelchairs
- Elevator
- Wheelchair-accessible restrooms
- Repairs to heating and air-conditioning system
- Meeting space
- Improved wiring for telecommunications
- Increase public access Internet connection speed from Cable (512 Kbps to 20 Mbps) to T1
405 S. Main Street
Horseheads, NY 14845Estimated construction need: $2,000,000
53rd Senate District
137th Assembly District
Information collected 1/21/06The Horseheads Free Library was built in 1967, and was last renovated in 1997. The library is currently in need of a new facility to meet the needs of the community. According to the Wisconsin/Connecticut space needs survey, the library's collection and service demands indicate that the library needs a facility three times the size of the current building. The estimated cost of a new facility is $2,000,000.
Needs:
- New facility
- 8,000 to 10,000 square feet of additional space
- Improved parking
- Additional meeting/program space
- More space for public access computers
- Improved wiring for electrical equipment and telecommunications
- Increase public access Internet connection speed from Cable (512 Kbps to 20 Mbps) to T1
203 Blue Point Avenue
Blue Point, NY 11715Planned construction project: $10,000,000
3rd Senate District
3rd Assembly District
Information collected 1/17/06The Bayport-Blue Point Public Library was built in 1956, and was last expanded and renovated in 1990-1992. The library is currently overcrowded and not fully wheel-chair accessible. An additional 12,000-14,000 square feet of space is needed to adequately serve the library community. The library is in the midst of planning a $10,000,000 construction project. The project is scheduled to begin in March 2008.
Needs:
- 14,000 square feet of additional space
- Expand and provide a more secure location for children's area
- Make all areas of the library accessible to people in wheelchairs
- Additional public meeting space
- More space for public access computers
75 Goose Hill Road
Cold Spring Harbor, NYPlanned construction project: $13,000,000
5th Senate District
10th Assembly District
Information provided 4/13/06The Cold Spring Harbor Public Library and Environmental Center opened on August 9, 2006. The community passed a $9,500,000 bond in September 2003 to construct a new library. The CSH Library Friends Foundation has raised $3,500,000 in a capital campaign to offset the tax impact of the construction. This project expanded the library from 7,000 square feet of space to 26,700 square feet of space.
Needs met by construction:
- New facility
- 26,700 square feet of additional space
18 Hauppauge Rd.
Commack, NY 11725Planned construction project: $195,000
2nd Senate District
7th Assembly District
Information collected 3/29/06The Commack Public Library was built in 1975, and was last expanded and renovated in 1996. Currently, the library's most pressing need is a new elevator. The library has applied for construction aid through the New York state $14 Million public library construction grant program to install a new elevator. The library is planning to start the project in January 2007, at a total cost of $195,000.
In the next three to five years, the library hopes to address its space needs by expanding/renovating the current facility. Expansion/renovation would create additional children's space, additional young adult space, additional community room space, and additional space for library materials.
Needs:
- 10,000 square feet of additional space
- New elevator
- Additional children's space
- Additional space for library materials
- Additional community room space
- Additional youth services space
- Repairs to parking lot
2478 Main Street (PO Box 3025)
Bridgehampton, NY 11932Estimated construction need: $6,000,000
1st Senate District
1st Assembly District
Information collected 1/30/06The Hampton Library was built in 1876, and was last expanded in 1982 and renovated in 2004. Currently the building is in need of an addition and major renovations to make all areas of the library accessible to all patrons and to create more space for the collections. A renovation and addition project is planned to begin in April 2007 to address many of the library's needs. The projected cost of the project is approximately $6,000,000.
Needs:
- Upgrades to heating, air conditioning, windows, doors, and a new roof to achieve greater energy efficiency
- 5,000 square feet of additional space including space for literacy tutoring, a larger children's room and the addition of a teen area
- Make all areas of the library accessible to all patrons including those in wheelchairs, with a revised floor plan and the addition of an elevator and an electronic front door
- More space for public access computers
- Improve wiring for computers and electrical equipment and telecommunications
- Expand wireless network for better access throughout building and grounds
52 Ponquogue Avenue
Hampton Bays, NY 11946Planned construction project: $70,000
1st Senate District
2nd Assembly District
Information collected 3/29/06The Hampton Bays Public Library was built in 1960 and was last expanded and renovated in 2002. The building is in need of a young adult area that serves young adults in a way that is consistent with the way adults and children are served. A construction project was scheduled to begin in May 2006. This construction project is intended to meet the needs of the library. The total cost of the planned construction project is $70,000.
Costs:
Needs fulfilled by construction project:
54-60 East Main Street
Patchogue, NY 11772Planned construction project: approx. $450,000
3rd Senate District
3rd Assembly District
Information collected: 9/22/06The Patchogue-Medford Library was built in 1979, and was last renovated in 1995. The library is in need of more space for collections, seating, programs, and community meetings. The library is scheduled to begin an interior renovation project in 2007, at a cost of approximately $450,000. The library is planning to apply for construction aid through the New York state $14 Million public library construction grant program.
Approximate Construction Costs:Construction (including electrical): $170,000
Equipment: $40,000
Furnishings and flooring: $240,000
Total: $450,000Needs:
- 48,000 square feet of additional space
- Make all areas of the library accessible to people in wheelchairs
- Wheelchair-accessible restrooms
- Space for children's activities center
- Homework centers for children and young adults
- Space for seating and quiet study areas
- Additional space for collections
- Additional space for public access computers
- Additional public meeting and program space
- Additional exhibit and display space
- Raising of the lower level of the buil