Pioneer Library System
The Pioneer Library System received $2,970 from the $800,000 Public Library Construction Grant Program to continue renovating and expanding the east wing of the system building. With the grant, the floors and doors will be ready for the next level of renovation. The dirt and concrete floor was filled and leveled with concrete to prepare it for the next steps. Also, the exterior walls were fitted with windows and doors to allow for natural light and proper entries and exits. With this necessary step, the east wing will be prepared for more renovations in the future.
Above photos show new doors, windows, floor and other framing work at Pioneer Library System . Click on any of the above images to see a larger version. |
||||
Pioneer Library System; information on their 2007-2008 $800,000 Public Library Construction Grant Program project





