System |
Library Name |
County |
Sen. Dist. |
Asy. Dist. |
Project Description |
Amount |
System Total |
Brooklyn Public Library |
$420,214,827.53 |
|
Arlington |
Kings |
17 |
54 |
New boiler; branch restoration |
$9,305,429.17 |
Bedford |
18 |
57 |
New HVAC & boiler; interior rehab; windows |
$3,687,745.80 |
Borough Park |
21 |
48 |
New HVAC & boiler; interior rehab; windows; roof replacement |
$10,141,300.94 |
Brighton Beach |
27 |
46 |
New boiler; branch renovation; interior renovations |
$3,396,214.03 |
Brooklyn Heights |
25 |
52 |
Branch renovation; windows; ADA compliance; new HVAC & boiler |
$14,843,176.84 |
Brower Park |
20 |
43 |
Roof replacement; purchase leased facility; branch renovation |
$11,985,173.84 |
Brownsville |
19 |
55 |
New HVAC & boiler; interior rehab; exterior rehab |
$7,191,104.31 |
Bushwick |
17 |
53 |
Total branch rehabilitation |
$9,034,977.21 |
Canarsie |
19 |
59 |
New building on site |
$18,438,728.99 |
Carroll Gardens |
25 |
52 |
Branch renovation |
$9,195,462.81 |
Central Library |
20 |
52 |
Total branch rehabilitation |
$55,995,961.48 |
Clarendon |
21 |
58 |
New HVAC & boiler; ADA compliance; roof; interior rehab |
$3,704,978.26 |
Clinton Hill |
18 |
57 |
Total branch rehabilitation |
$6,031,359.95 |
Coney Island |
23 |
46 |
New boiler; façade renovations; new windows; interior renovations |
$6,559,821.10 |
Cortelyou |
21 |
44 |
Furniture, fixtures, & equipment |
$972,157.97 |
Crown Heights |
20 |
43 |
Purchase leased facility |
$5,120,871.99 |
Cypress Hills |
17 |
40 |
Fire alarm |
$389,340.00 |
DeKalb |
17 |
53 |
New boiler; basement renovations; exterior rehab; windows |
$7,754,605.65 |
Dyker |
22 |
46 |
ADA compliance; windows |
$4,480,438.82 |
East Flatbush |
19 |
58 |
Roof replacement; new HVAC system; branch renovations |
$7,652,072.54 |
Eastern Parkway |
20 |
56 |
Total branch rehabilitation |
$9,588,139.07 |
Flatbush |
20 |
43 |
Fire alarm; hazardous materials abatement |
$1,637,083.42 |
Flatlands |
27 |
59 |
Total branch rehabilitation |
$8,443,903.93 |
Gerritsen Beach |
22 |
59 |
Façade renovations; new roof; interior renovations |
$5,952,825.77 |
Gravesend |
22 |
59 |
Interior renovations |
$37,400.00 |
Greenpoint |
25 |
50 |
New building on site |
$22,126,474.79 |
Highlawn |
22 |
47 |
New HVAC & boiler |
$1,843,872.90 |
Homecrest |
27 |
45 |
Purchase leased facility; branch renovations |
$6,892,982.80 |
Kings Bay |
27 |
44 |
Exterior renovations; new HVAC; roof replacement |
$5,397,452.93 |
Leonard |
17 |
53 |
Total branch rehabilitation |
$10,159,462.81 |
Macon |
18 |
56 |
Rear retaining wall |
$921,936.45 |
Mapleton |
22 |
49 |
Exterior restoration; roof replacement |
$3,687,745.80 |
Marcy |
18 |
56 |
New HVAC & boiler; roof replacement; exterior rehab |
$6,031,359.95 |
McKinley Park |
23 |
48 |
Purchased leased facility; branch renovations |
$9,588,139.07 |
Midwood |
27 |
45 |
Boiler; electrical upgrades |
$1,000,000.00 |
Mill Basin |
27 |
59 |
New windows and doors; hazardous materials abatement |
$3,687,745.80 |
New Lots |
19 |
40 |
New HVAC & boiler; interior renovation; windows |
$9,219,364.50 |
New Utrecht |
22 |
49 |
New HVAC; interior renovation |
$10,343,850.10 |
Pacific |
18 |
57 |
New boiler; interior rehabilitation; ADA compliance |
$13,829,046.74 |
Paerdegat |
19 |
41 |
Roof replacement; purchase leased facility; new HVAC & boiler; ADA compliance |
$8,205,234.41 |
Park Slope |
18 |
44 |
Exterior rehabilitation renovation |
$6,000,000.00 |
Red Hook |
18 |
51 |
Interior renovations |
$475,453.00 |
Ryder |
27 |
47 |
New HVAC & boiler; interior rehabilitation |
$7,098,910.67 |
Saratoga |
18 |
55 |
New boiler; interior rehabilitation |
$5,374,474.22 |
Sheepshead Bay |
27 |
45 |
Purchase leased facility; interior renovations |
$10,685,325.94 |
Spring Creek |
19 |
40 |
New HVAC system; interior rehabilitation |
$2,673,615.71 |
Stone Avenue |
19 |
55 |
New boiler; windows; exterior rehabilitation |
$3,042,390.29 |
System-wide |
Various |
Various |
Hazardous materials abatement; ADA compliance survey |
$3,687,745.80 |
System-wide |
Various |
Various |
Install building automation systems & other needs |
$9,219,364.50 |
Ulmer Park |
22 |
47 |
Total branch rehabilitation |
$9,219,364.50 |
Walt Whitman |
18 |
50 |
Roof replacement; interior renovation |
$9,034,977.21 |
Washington Irving |
17 |
53 |
Roof replacement; total branch rehabilitation |
$8,125,491.60 |
|
Williamsburgh |
25 |
50 |
Exterior renovation; window replacement |
$4,925,796.93 |
|
Windsor Terrace |
20 |
44 |
New roof; interior rehabilitation; ADA compliance |
$6,176,974.22 |
System |
Library Name |
County |
Sen. Dist. |
Asy. Dist. |
Project Description |
Amount |
System Total |
Buffalo & Erie County Public Library |
$70,447,519.00 |
|
Alden (Ewell) Free Library |
Erie |
59 |
142 |
Construction of a parking lot; interior renovations to meet ADA requirements and provide a new children’s room; replace HVAC on upper floor with energy efficient units; install full energy efficient HVAC in basement |
$330,250.00 |
Amherst Public Library/ Audubon Library |
61 |
148 |
Expand library; replace two of the building’s HVAC units (original to the building – 1987) with energy efficient systems |
$875,000.00 |
Amherst Public Library/ Eggertsville-Snyder Library |
61 |
148 |
Replace windows and front door with energy efficient units; replace front entrance sidewalk pad; restore chimney |
$50,000.00 |
Angola Public Library |
59 |
146 |
Expansion of 1,138 sq. ft. for additional meeting/program space & additional space to house the collection |
$275,769.00 |
Aurora Town Public Library |
59 |
142 |
Expansion or new facility, including additional space for meeting/program room, staff offices, collections, patron seating, and public access computers |
$4,996,000.00 |
BECPL - Central Library |
58 |
141 |
Space renovation/reconfiguration/asbestos abatement for Exhibit Space/Cultural Tourism and balance of facility; replace escalators with ADA elevators; mezzanine space construction |
$18,535,000.00 |
BECPL - Crane Branch |
60 |
144 |
New or expanded facility; replace windows with energy-efficient upgrades |
$3,905,000.00 |
BECPL - Dudley Branch |
58 |
145 |
New or renovated/expanded facility; replace existing floor to incorporate new wiring and electrical for connectivity and computer terminals |
$3,960,000.00 |
BECPL - East Clinton Branch |
58 |
145 |
Expand existing facility, including land acquisition; replace lighting with new, energy-efficient lighting system; replace existing floor to incorporate new wiring and electrical for connectivity and computer terminals |
$1,770,000.00 |
BECPL - East Delavan Branch |
60 |
141 |
Elevator; renovations to make all areas of the library accessible to patrons in wheelchairs; handicapped accessible restrooms |
$385,000.00 |
BECPL - Frank E. Merriweather, Jr. Branch |
60 |
141 |
Upgrade auditorium PA system and lighting; expand building security system |
$50,000.00 |
BECPL - Niagara Branch |
58 |
144 |
Replace boilers with geothermal wells |
$150,000.00 |
BECPL - North Park Branch |
60 |
144 |
Replace with new facility |
$3,500,000.00 |
BECPL - Riverside Branch |
60 |
144 |
Expand facility; replace existing lighting with energy-efficient lighting system; ceiling tiles to improve energy conservation |
$570,000.00 |
Cheektowaga Public Library/Julia B. Reinstein Library |
58 |
143 |
Rehabilitate parking lot |
$5,000.00 |
City of Tonawanda Public Library |
61 |
140 |
Expand facility to include a space efficient main entryway, ADA approved work area, additional public computers, quiet spaces, programming space, additional parking spaces, upgraded mechanical system, and security camera system |
$3,000,000.00 |
Clarence Public Library |
61 |
142 |
Expand the current parking lot; install doors at entrance of public meeting room 1 to deal with external noises while meeting room is in use |
$65,000.00 |
Collins Public Library |
59 |
146 |
Restore parking lot |
$20,000.00 |
Grand Island Memorial Library |
60 |
144 |
Roof replacement (12,400 sq. ft.) including insulation with more energy efficient system |
$126,500.00 |
Hamburg Public Library: Hamburg Main Library |
58 |
146 |
Construct a 6,000 sq. ft. addition onto the present library to provide additional community/meeting room space; replace HVAC system; install skylights in 1966 library building; improve ADA accessibility; improve computer access; increase seating; provide an attractive community destination and add space to accommodate 10 years of growth of the collection |
$2,000,000.00 |
Hamburg Public Library: Lake Shore Branch |
58 |
146 |
Replace with new expanded facility, including land acquisition ($3,500,000) |
$3,700,000.00 |
Lackawanna Public Library |
58 |
146 |
Interior and exterior renovations including new energy efficient windows and lighting; reconstruct front entry; reconfigure interior space; replace heating system; reconstruct chimney and restore exterior brickwork; construct/replace sewer lines |
$250,000.00 |
Lancaster Public Library |
59 |
143 |
Parking lot expansion; resurface/recondition existing concrete floor; replace inefficient globe lighting; replace deteriorated ceiling sections; replace roof ice shields; replace upper and lower back hallway flooring; replace fire alarm system; repair public bathroom floor drains; resurface outside concrete stairs |
$325,000.00 |
Marilla Free Library |
59 |
142 |
Reconstruction of ADA entry; expansion including additional space for program room, staff offices, and collection; reconfigure existing 3,400 sq. ft. library to create more economical use of space including enhanced public access computer areas |
$825,000.00 |
Newstead Public Library |
61 |
142 |
Install ADA automated door openers; construct outdoor equipment storage shed |
$24,000.00 |
Orchard Park Public Library |
59 |
145 |
Building expansion; generator |
$1,255,000.00 |
Town of Tonawanda Public Library |
61 |
140 |
New building, equipment, and furnishings for the Kenmore Branch and/or expansion of the Kenilworth Branch; HVAC unit updated at Kenilworth and Kenmore Branches; install a security system at the Kenilworth Branch; replace existing lighting with new energy efficient lighting system and convert existing two offices located on the first floor to a Computer Lab or Bookstore at the Kenmore Branch |
$7,000,000.00 |
West Seneca Public Library |
58 |
145 |
Expansion of building to include meeting room (to accommodate 150 people), tutoring rooms, and computer lab with 20 workstations; new flooring; improved lighting |
$12,500,000.00 |
System |
Library Name |
County |
Sen. Dist. |
Asy. Dist. |
Project Description |
Amount |
System Total |
Clinton-Essex-Franklin Library System |
$4,072,200.00 |
|
CEF Headquarters |
Clinton |
45 |
114 |
Repair cement steps; install safety railing in garage; install energy efficient lighting in garage; reconstruct collapsing driveway |
$50,000.00 |
Rouses Point Dodge Memorial Library |
45 |
114 |
Insulate and weatherize attic for increased energy efficiency; enlarge bathroom to meet ADA requirements; replace exterior doors (front & side); replace handicap accessible ramp; renovation of basement to accommodate a children’s area with bathroom, air conditioning, heat, and outside ramp; renovation of attic to accommodate a conference room, reference room, study area, and bathroom; installation of elevator or lift from main floor to attic; renovation of interior staircases (2) to attic and basement |
$400,000.00 |
Ellenburg Sarah A. Munsil Library |
45 |
114 |
Two Upstairs Rooms: replace/fix ceiling; install new energy efficient light fixtures/bulbs; install four new energy efficient windows; install new smoke & CO2 detectors; build storage shelves along 2 walls.
Basement: install new energy efficient door; insulate area.
Main: install energy efficient front door.
Other: paint (old USPS mailbox) & install as a book drop at front of library
(Work accomplished to be determined by match requirements) |
$10,000.00 |
Mooers Free Library |
45 |
114 |
Outfit new building to serve as a fully accessible library (to be completed in phases that address technology, increased user accommodation, and ADA needs) |
$75,000.00 |
Plattsburgh Public Library |
45 |
114 |
Women’s bathroom ADA compliance ($3,000); replace mortar on outside brickwork & new signage ($155,000); replace handicapped ramp & entry stairs ($30,000); new public display shelving ($15,000); replace staff room floor ($10,000); reconfiguration of local history collection upstairs ($8,000); HVAC Capital Project ($250,000); new OPAC User station ($5,000) |
$476,000.00 |
Elizabethtown Library Association |
Essex |
45 |
113 |
Rehabilitate and paint outside of building; replace interior carpets; handicap ramp (Work accomplished to be determined by match requirements) |
$50,000.00 |
Essex, Belden Noble Library |
45 |
114 |
Install energy efficient windows and lighting in historic building; improve ADA access |
$20,000.00 |
Hammond Library of Crown Point |
45 |
113 |
Basement renovations – sealing cement block, replace existing lighting, install 3,000 sq. ft. floor; exterior ramp to comply with ADA requirements; install ADA compliant bathroom; roof replacement; replace windows with energy efficient units
(Work accomplished to be determined by match requirements) |
$75,000.00 |
Keene Valley Library Assoc. |
45 |
114 |
Improve energy efficiency by installing new windows |
$25,000.00 |
Keeseville Free Library |
45 |
114 |
Install new energy efficient windows throughout building |
$20,000.00 |
Lake Placid Public Library |
45 |
114 |
Lighting and space improvements to local history room |
$30,000.00 |
Paine Memorial Library |
45 |
113 |
New windows; commercial air conditioning system; new lighting; wheelchair accessible restroom |
$35,000.00 |
Schroon Lake Public Library |
45 |
113 |
New library building or addition to current building |
$1,500,000.00 |
Sherman Free Library |
45 |
113 |
Handicapped ramp and accessible bathroom (would require addition to 1st floor) ($40,000); excavation to improve drainage around building, and sealing basement walls ($20,000); install air conditioning ($15,000) |
$75,000.00 |
Wadhams Free Library |
45 |
113 |
Replace roof, adding foam insulation and solar collectors ($20,000); add passive solar addition to south side of building ($25,000); parking improvements ($5,000) |
$50,000.00 |
Westport Library Association |
45 |
113 |
Install energy efficient windows in historic building |
$25,000.00 |
Tupper Lake, Goff-Nelson Memorial Library |
Franklin |
45 |
114 |
New lighting by book drop area ($300); new flood lighting on front of library ($400); new electrical lines & outlets ($1,500); air conditioning ($20,000); new heat source for research room ($4,000); new cellar floor to make cellar more usable ($10,000); replace walls in cellar ($6,000); renovation of 2 bathrooms in cellar ($10,000); replacement of ceiling fans with more effective fans ($4,000) |
$56,200.00 |
Wead Library of Malone |
45 |
114 |
Rebuilding handicap access ramp ($100,000); installation of elevator (would require expansion per architect estimated cost of $1 million) |
$1,100,000.00 |
System |
Library Name |
County |
Sen. Dist. |
Asy. Dist. |
Project Description |
Amount |
System Total |
Finger Lakes Library System |
$11,930,000.00 |
|
Aurora Free Library |
Cayuga |
54 |
123 |
ADA compliant restrooms; basement & upper floor renovations for additional office space, storage, conference, and meeting room space; air conditioning for upper floor; chair lift for accessibility |
$224,000.00 |
Hazard Library Association |
54 |
123 |
Rehabilitation of existing space |
$35,000.00 |
Seymour Library (Auburn) |
|
|
New roof |
$175,000.00 |
Springport Free Library (Union Springs) |
54 |
123 |
Roof replacement; gutter replacement; window replacement; children’s area expansion |
$200,000.00 |
Stewart B. Lang Memorial Library |
49 |
128 |
New roof |
$10,000.00 |
Weedsport Free Library |
49 |
128 |
Install insulation in the attic area; redo front entranceway by replacing wooden exterior door with metal one to eliminate severe weather issues; renovate parking lot |
$29,000.00 |
Cortland Free Library |
Cortland |
51 |
125 |
Sub-divide large areas within the library into specialized work & technology areas; designated space for a conference room; enhanced climate control & electrical upgrades; upgraded finishes to the areas; installation of a list to provide accessibility to specific areas, namely new conference or study areas not accessible via elevator |
$350,000.00-$400,000.00 |
Peck Memorial Library |
51 |
123 |
Replace and/or restore mortar; foundation; windows; add insulation; heating & air unit; community room; electric & plumbing; security system |
$2,500,000.00 |
Edith B. Ford Memorial Library (Ovid) |
Seneca |
54 |
129 |
Geothermal heating; energy efficient lighting |
$100,000.00 |
Lodi Whittier Library |
54 |
129 |
New construction of a 2,300 sq. ft. building (current library space is 700 sq. ft.) |
$800,000.00 |
Waterloo Library and Historical Society |
54 |
129 |
ADA compliant bathrooms; heating, plumbing, & electrical replacements for energy savings; expand current library |
$1,800,000.00 |
Cady Library (Nichols) |
Tioga |
52 |
137 |
New roof |
TBD |
Coburn Free Library (Owego) |
52 |
123 |
Historic Trust compliant expansion of the library to the rear of the building elevator; handicapped accessible restrooms; increased public and storage space |
$2,000,000.00 |
Finger Lakes Library System |
Tompkins |
53 |
125 |
Renovate existing building for Systems Headquarters (current lease expires 2015) |
$2,000,000.00 |
Groton Public Library |
51 |
125 |
Upgrades to foyer; replacement lighting & entrance door; restoring the interior ceiling & walls of the main room in the library; adding two commercial dehumidifiers; updating restroom for energy efficiency; repairing the library’s foundation; adding copper gutters & downspouts to the exterior back portion of the building not done in the previous improvement; basement window replacement |
$21,000.00 |
Lansing Community Library |
54 |
125 |
New stairs; new entrance; new flooring; new shelving |
$40,000.00 |
The Southworth Library Association |
51 |
125 |
Install a metal railing on the east side of the entrance ramp from the parking lot to the main front doors & lobby of the new Lincoln Center for improved accessibility |
$3,500.00 - $4,000.00 |
Tompkins County Public Library |
53 |
125 |
Renovate existing leased spaces (FLLS) to accommodate growing needs of library including: improved teen services area; learning lab; improved point of service areas |
$1,500,000.00 |
Ulysses Philomathic Library (Trumansburg) |
|
|
Energy efficient lighting & air conditioning units; History Room renovation and refurbishment; parking lot upgrades |
$92,000.00 |
System |
Library Name |
County |
Sen. Dist. |
Asy. Dist. |
Project Description |
Amount |
System Total |
Four County Library System |
$21,909,700.00 |
|
Broome County Public Library |
Broome |
52 |
126 |
Replace 18 public access computers; install new flooring in browsing area, replace 12 microfilm machines |
$90,000.00 |
Deposit Free Library |
52 |
107 |
Replace roof; construct storage shed |
$35,000.00 |
George F. Johnson Memorial Library |
52 |
126 |
New exterior/interior lighting; parking lot; remodel basement meeting room; new roof |
$120,000.00 |
Lisle Free Library |
52 |
123 |
Parking lot and driveway; add solar panels; insulate cellar; expansion project; reconfigure space |
$183,000.00 |
Mary-Wilcox Memorial Library |
52 |
123 |
Asbestos abatement; construction to fix load-capacity deficiencies; 2nd floor renovation to create meeting room and display area for local history collection; remodel meeting room; renovate bathroom for ADA compliance; add shelf space for juvenile/YA rooms |
$119,000.00 |
Nineveh Public Library |
52 |
107 |
Addition; siding; roof; disabled access ramp |
$100,000.00 |
Your Home Public Library |
52 |
126 |
Replace/repair concrete walkway; clean, re-point and seal exterior brickwork; repair, restore and glaze windows; install elevator; install central air conditioning; upgrade/replace steam boiler; replace rubber porch roof; install ADA approved ramp in basement; renovate basement restrooms for ADA compliance |
$730,000.00 |
Guernsey Memorial Library |
Chenango |
52 |
107 |
Renovate three restrooms; new roof over children’s area; new fire alarm; heat pump and air-handler for local history room; carpeting; replace all sidewalks (approx. 1/3 mile); new doors; new windows |
$325,000.00 |
Moore Memorial Library |
52 |
107 |
Expand meeting room; expand office space; expand area for adult books and media; expand circulation desk area; expand museum space (with Historical Society); also a 17,460 sq. ft. addition |
$5,500,000.00 |
New Berlin Library |
52 |
107 |
Expansion; porch replacement; siding |
$200,000.00 |
Oxford Memorial Library |
52 |
107 |
Addition for community room (w/ disabled access); new rear entryway; various energy efficiency upgrades; reinforced framing; improved access; upgrade heating system; upgrade plumbing system; upgrade electrical system; add alarms and security systems; wireless Internet access; improved roof-water control system; replace parking lot and related work; landscaping; new sidewalks and paving; sprinkler system for entire building; hazardous materials identification/abatement |
$813,000.00 |
Sherburne Public Library |
49 |
123 |
HVAC |
$150,000.00 |
South New Berlin Free Library |
52 |
107 |
Windows; HVAC; entryway/façade; lighting; bathroom |
$18,000.00 |
Andes Public Library |
Delaware |
42 |
107 |
Parking lot; exterior painting; HVAC; doors; roof |
$64,100.00 |
Bovina Public Library |
42 |
107 |
Repair front steps; build ramp |
$10,000.00 |
Fairview Public Library |
42 |
107 |
Replace vinyl siding; painting |
$20,000.00 |
Franklin Free Library |
42 |
127 |
Roof; disabled access; painting |
$15,000.00 |
Wm. B. Ogden Free Library |
42 |
107 |
Renovate two entrances; sidewalks; new doors; drainage; roof; masonry; exterior painting/weatherproofing |
$283,600.00 |
Louis Adelia Read Memorial Library |
42 |
107 |
Expansion project |
$1,000,000.00 |
Roxbury Library Association |
42 |
107 |
Driveway paving; windows; sills |
$34,000.00 |
Cherry Valley Memorial Library |
Otsego |
51 |
117 |
Replace disabled access ramp and walkway; replace interior lighting fixtures; replace storm windows; add disabled access bathroom |
$75,000.00 |
Gilbertsville Free Library |
51 |
127 |
Addition; painting; electrical work |
$75,000.00 |
Harris Memorial Library |
51 |
127 |
New roof; renovation to siding and shutters; addition for public computers/technology room |
$70,000.00 |
Huntington Memorial Library |
51 |
111 |
New library building |
$10,000,000.00 |
Kinney Memorial Library |
51 |
111 |
Addition |
$1,000,000.00 |
Milford Free Library |
51 |
111 |
Expansion project |
$100,000.00 |
Village Library of Cooperstown |
51 |
111 |
New lighting/fixtures |
$30,000.00 |
Village Library of Morris |
51 |
127 |
Major addition |
$750,000.00 |
System |
Library Name |
County |
Sen. Dist. |
Asy. Dist. |
Project Description |
Amount |
System Total |
Mid-York Library System |
$20,712,303.00 |
|
Frankfort Free Library |
Herkimer |
51 |
117 |
Wheelchair lift; custom shelving under windows in children’s area; new carpeting throughout upstairs; replace wallpaper where leaks have occurred; paint a portion of the downstairs; repair wallboard and replace carpeting in the downstairs (water damage); chimney inspected; water fountain replaced |
$100,000.00 |
Ilion Free Public Library |
51 |
117 |
New roof; basement remodeling; convert staff space to public space; purchase property next door for expansion; foundation work; new electrical; new meeting room; re-point bricks; chimney repair; install energy efficient windows in addition; waterproof basement |
$664,200.00 |
Jordanville Public Library |
51 |
117 |
New roof; restoration of four columns that support the overhanging roof at the front of the library |
$50,000.00 |
Middleville Free Library |
51 |
117 |
Wheelchair accessible electronic door; new shelving to better utilize space used for library collections |
$25,000.00 |
Old Forge Library |
|
|
Pour concrete in the floor underneath the Judith Lowenstein Cohen Memorial wing to provide 1200 sq. ft. secure dry storage |
$15,600.00 |
Weller Library |
51 |
117 |
Re-plaster Children’s Room; restoration of bas relief floral ceiling plaster in Reading Room; masonry repair on vault; replace windows; energy efficient HVAC |
$120,000.00 |
Canastota Public Library |
Madison |
49 |
111 |
Install geothermal HVAC system; remodel staff work room; brick re-pointing; lighting upgrades; remodel local history room; remodel children’s room |
$200,000.00 |
Cazenovia Public Library |
49 |
111 |
Paint current building; addition |
$1,100,000.00 |
DeRuyter Free Library |
49 |
111 |
Install ‘green’ HVAC; install energy efficient windows; new flooring; new wiring; new public & staff restrooms; reconfiguring newly created library space |
$2,000,000.00 |
Hamilton Public library |
49 |
111 |
Removal of lead-based paint |
$130,000.00 |
Morrisville Public Library |
49 |
111 |
Upgrades to electrical wiring; new computer equipment; elevator; new roof; renovations to make all areas accessible to patrons in wheelchairs; upgrades to HVAC system; 30,000 sq. ft. addition |
$1,400,000.00 |
New Woodstock Free Library |
49 |
111 |
20 year project to: replace roofs; replace boilers; repaint interior & exterior; replace carpets, tile, & wood floors; repair & replace front entrance and foundation; replace and construct adequate parking space; replace basement windows; install additional insulation; reline the chimney; refinish wood floors |
$400,000.00 |
Oneida Public Library |
49 |
111 |
New library building; security system |
$4,000,000.00 |
Sullivan Free Library-Bridgeport |
49 |
111 |
Addition |
$250,000.00 |
Sullivan Free Library-Chittenango |
49 |
111 |
Replace 4 HVAC units which are beyond serviceable life |
$75,000.00 |
C.W. Clark Memorial Library |
Oneida |
49 |
111 |
Parking improvements; convert basement into usable space; construction of a 1,100 sq. ft., 2 story addition to existing library; purchase of new shelving |
$403,008.00 |
Dunham Public Library |
47 |
116 |
Automatic doors; upgrade HVAC system |
$9,000.00 |
Jervis Public Library |
47 |
116 |
Expanded Children’s Room & adjustable programming room ($1,500,000); construction of additional meeting room space ($800,000); construction of teen space ($50,000); installation of security gates at 2 entrances ($35,000); construction of drive-thru book drop ($10,000) |
$2,395,000.00 |
Mid-York Library System Headquarters |
47 |
116 |
Ongoing initiative to make facility “green” over the next 10 years; create off street parking; correct roof design flaw to prevent further water intrusion; upgrade security system |
$3,000,000.00 |
Oriskany Public Library |
47 |
116 |
New roof; canopy for front entrance |
$48,000.00 |
Utica Public Library |
47 |
111 |
New Youth Services Wing; roof & gutter renovation/rehabilitation; accessible elevator; exterior rehabilitation; electrical improvements |
$3,982,495.00 |
Waterville Public Library |
49 |
111 |
Photovoltaic electricity generation equipment retrofit (30kW), combination rooftop and post mounted with system controls |
$315,000.00 |
Western Town Library |
47 |
115 |
Replace HVAC; insulate building; weatherize windows |
$30,000.00 |
System |
Library Name |
County |
Sen. Dist. |
Asy. Dist. |
Project Description |
Amount |
System Total |
Nassau Library System |
$82,487,757.00 |
|
Baldwin Public Library |
Nassau |
9 |
14 |
Sidewalk & railings rehabilitation ($20,000); repurpose computer room to allow young adult space to expand ($10,000); interior renovation to expand open space in Children’s Room ($6,000); reconfiguration of storage space into meeting rooms ($150,000); upgrade security cameras system ($20,000); furniture purchases for new Young Adult and Adult Reference/Computer areas ($12,000) |
$218,000.00 |
Bayville Free Library |
5 |
113 |
Roof repairs ($10,000); HVAC replacement ($7,000) |
$17,000.00 |
Bellmore Memorial Library |
8 |
19 |
Create Teen Space ($50,000); replace carpeting ($75,000); new energy-efficient HVAC ($250,000); repair windows and walls ($75,000); paint interior ($15,000); new shelving ($25,000); convert Compact Storage Room to Board Meeting Room/Instruction & Program Room ($180,000); update Children’s bathrooms ($150,000) |
$820,000.00 |
Bethpage Public Library |
5 |
15 |
New roof ($300,000); new carpeting in auditorium ($150,000); replace audio equipment in auditorium ($15,000); replace lighting in most areas of library using energy efficient replacements ($300,000); expand the library with a 2,600 sq. ft. addition ($1,700,000); create outdoor garden/story space near Children’s Room ($50,000); create “Teens and Tweens” area within library ($60,000); replace furniture – computer desks and tables ($30,000); create a rear entrance for the building ($100,000); renovate the media area ($20,000) |
$2,725,000.00 |
East Meadow Public Library |
6 |
15 |
Renovate & replace front doors ($82,000); add energy management system to lower energy costs ($100,000); install solar panels on roof to conserve energy ($250,000); replace 55 ton chiller with new 17 ton air conditioner, and eliminate water tower ($105,000); discourage through traffic in parking lot with new configuration; resurface parking and improve drainage ($60,000); add sidewalk on east side of building, widen sidewalk on west side for patron safety; replace phone system ($20,000); new adult public furniture ($50,000); new signage throughout ($25,000); replace tile floor & carpeting ($34,000); add programming space ($2,000,000) |
$2,726,000.00 |
East Rockaway Public Library |
9 |
20 |
Upgrade circulation desk ($45,000); HVAC replacement ($130,000) |
$175,000.00 |
Farmingdale Public Library |
6 |
12 |
Expansion of parking lot to include additional parking spaces, drainage, curbs, and lighting |
$300,000.00 |
Floral Park Public Library |
7 |
21 |
Construction of an elevator ($600,000); new entrance ramp/plaza, and electronic doorway to make the library accessible to those in wheelchairs ($175,000); construction of dedicated teen space, including construction of walls and doorways |
$775,000.00 |
Franklin Square Public Library |
7 |
21 |
New teen area ($20,000); new HVAC system ($150,000); new roof ($300,000); new carpeting throughout building ($100,000); new phone system ($10,000) |
$580,000.00 |
Freeport Memorial Library |
8 |
19 |
East Bldg: New ceiling and lighting ($287,000); replace meeting room doors & accordion divider for rooms 1, 2, and 3 ($210,000); renovate meeting rooms 1, 2, and 3, including new ceiling, lighting, and replacement of stage ($240,000); renovate 5 bathrooms and make one ADA compliant ($215,000); new ceiling and lighting for Children’s Room and Business Office ($287,000); new ceiling and lighting for lower level – Tech. Services, Rooms 4 and 5 ($287,000); replace windows in Memorial Room ($14,000); renovate storage room & add compact shelving ($226,500); renovate Room 6 ($100,000); renovate staff room including kitchen cabinet replacement and wallpaper.
West Bldg: New boiler ($300,000); replacement of ceiling and lighting in circulation office ($12,200); upgrade fire alarm system ($22,000); add one ADA compliant bathroom ($45,000).
Both Bldgs: Exterior restoration and painting ($175,000); replace two emergency exit doors ($45,000); upgrade camera surveillance system ($28,500) |
$2,494,200.00 |
Garden City Public Library |
7 |
17 |
Generator; new HVAC chillers |
$819,800.00 |
Gold Coast Public Library |
5 |
15 |
Additional space for collection growth; meeting room space for community groups and library programs; expanding the present facility, building a new facility, or leasing and outfitting a second facility (cost estimates vary depending on option selected) |
$15,000,000.00 |
Hewlett-Woodmere Public Library |
9 |
14 |
Replace approx. 27,000 sq. ft. of roof ($275,000); repairs to slate roof ($20,000); energy-efficient lighting ($50,000); HVAC upgrade ($105,000); new carpeting ($115,000) |
$565,000.00 |
Hicksville Public Library |
9 |
20 |
Current: Retrofit & redesign existing house for a new Administration Building ($338,728).
Future: Replace Otis elevator ($71,000); install 2 Haakon Air Pak Style indoor units & one Cooling Tower to replace existing units ($236,000); expand and renovate Children’s Room to allow for their programming needs; convert current Children’s Story time Room into a Local History Room |
$645,728.00 |
Hillside Public Library |
5 |
15 |
Renovate parking lot |
$150,000.00 |
Island Park Public Library |
7 |
17 |
Roof replacement; new HVAC system; new/energy-efficient lighting; upgrade A/V wireless sound system |
$160,000.00 |
Island Trees Public Library |
9 |
20 |
Plumbing – replace pipe from toilets to house trap, move house trap outside; HVAC – replace aging unit ($19,000); hot water heater in library’s portion of building ($7,000) |
$26,000.00 |
Jericho Public Library |
6 |
19 |
1st Floor: Children’s program room; redesign circulation desk; more storage space; re-location of technical services.
2nd Floor: Redesigned reference area; redesigned YA area; new seating areas |
$3,500,000.00 |
Lakeview Public Library |
5 |
13 |
Security (video surveillance) system & materials protection system; demolition and re-configuration of the 5,000 sq. ft. on the 2nd floor and the 13,000 sq. ft. 3rd floor which are not currently usable; archival area; elevator |
$1,350,000.00 |
Levittown Public Library |
6 |
18 |
Replace HVAC ($150,000); replace outdoor handicap ramps ($25,000); renovate community room, make ADA compliant, asbestos abatement ($60,000); replace stage, carpeting, ceiling, and lighting ($100,000); replace 32,000 sq. ft. roof ($350,000) |
$685,000.00 |
Locust Valley Library |
6 |
19 |
2,400 sq. ft. addition; create additional 34 parking spaces |
$2,100,000.00 |
Long Beach Public Library |
5 |
15 |
Acquire property & construct additional space for teen center, additional programming and meeting room space, expanded children’s area, and separate group work area ($9.5 million); replace rooftop; replace five HVAC packet units; re-carpet first floor; expand solar panel array |
$9,500,000.00 |
Lynbrook Public Library |
9 |
20 |
Roof replacement on 1929 building ($175,000); HVAC replacement & upgrade ($150,000); rehabilitation of parking lot ($50,000); exterior restoration – re-pointing bricks, moisture issue on exterior walls ($250,000); skylights restoration or replacement |
$625,000 |
Malverne Public Library |
9 |
14 |
Renovate parking lot ($150,000); expand library to create another meeting room and a teen space ($7,500,000); replace telephone system ($5,000); new HVAC system ($10,000) |
$7,665,000 |
Massapequa Public Library |
9 |
14 |
Reconfiguring the inside of both buildings; redo the parking area at Bar Harbour; new carpeting; painting both buildings |
$1,500,000.00 |
Merrick Library |
6 |
12 |
Split up one of the existing group study rooms into two smaller rooms, each accommodating 2 people at a time ($10,000); energy-efficient, “green” lighting in the Children’s Room ($10,000); replace carpeting in ½ multi-purpose room with flooring; replace carpeting around fish tank with flooring; replace carpeting throughout building |
$20,000.00 |
Nassau Library System |
8 |
17 |
Repair/re-point an exterior wall ($27,000); new front entrance with automatic doors ($30,000); renovate and make fully ADA compliant 3 restrooms ($90,000); renovate a 4th bathroom ($24,000); interior renovations to create a self-contained meeting room/training center “wing” with public access when the rest of the building is closed ($960,000) |
$1,131,000.00 |
North Bellmore Public Library |
6 |
18 |
Major renovation of existing building |
$5,000,000.00 |
North Merrick Public Library |
8 |
19 |
New HVAC system; new lighting; new windows; upgrades to plumbing; new electrical wiring; new circulation desk; new carpeting; new materials theft prevention system ($50,000); renovation of entries and interior spaces; replacement of flagpole; installation of security camera system ($5,000); replacement and upgrading of computers ($50,000); purchase of computer furniture; construction of interior perimeter bookshelves; installation of drop ceilings; renovation of two public bathrooms ($30,000); repaving of parking lot; replacement of perimeter fences; replacement of outdoor lighting; solar panels ($525,000) |
$660,000.00 |
Oceanside Library |
8 |
17 |
Replace existing lighting fixtures throughout the building with energy efficient lighting |
$500,000.00 |
Oyster Bay – East Norwich Public Library |
5 |
15 |
Replace HVAC units ($95,000); interior painting ($5,500); exterior painting ($6,500); carpeting ($55,000) |
$500,000.00 |
Peninsula Public Library |
9 |
20 |
Short term (1-2 years): Replace HVAC system ($300,000); replace concrete walkways around library ($30,000).
Longer range: Completely renovate existing library ($5 million) or construct a new library building ($12 million) |
$12,330,000.00 |
Plainedge Public Library |
9 |
20 |
New roof ($423,500); solar panels ($308,000) |
$731,500.00 |
Plainview-Old Bethpage Public Library |
6 |
12 |
New lighting and ceiling throughout building ($200,000); reconfiguration of internal space ($100,000); replacement of insulation around ductwork on roof for HVAC system ($60,000); replacement of basement HVAC ($65,000) |
$425,000.00 |
Port Washington Public Library |
6 |
13 |
Children’s Library renovation ($500,000); interior renovations and repurposing of existing space ($500,000); carpeting ($80,000); air conditioning system for meeting room ($40,000) |
$1,120,000.00 |
Rockville Centre Public Library |
7 |
16 |
Window replacement ($134,000); expand rear entry; install handicapped accessible front doors ($95,000); replace carpeting on main level ($50,000); replace/resurface parking lot ($5,000 - $20,000 depending on option chosen); replace front entrance pavement; upgrade parking lot lighting with LED fixtures ($9,000) |
$308,000.00 |
Roslyn (Bryant) Public Library |
5 |
15 |
Upgrade building systems (replace boilers in main library; replace 11 HVAC units throughout the entire library); install new telephone system; install 2 standby generators to operate sump pumps in case of power loss; install additional drainage system under the building to handle water that forms in the elevator pit; create a young adult area, quiet study area, and coffee bar; renovate public & staff restrooms |
$2,000,000.00 |
Sea Cliff Village Library |
8 |
18 |
Renovate Children’s Library including: ceiling; new HVAC; windows; lighting & carpeting; handicapped accessible bathroom; asbestos abatement; conversion to gas heat |
$600,000.00 |
Seaford Public Library |
5 |
13 |
Renovate 2 restrooms ($40,000); video surveillance system for interior & exterior of building ($15,000) |
$55,000.00 |
Syosset Public Library |
5 |
15 |
Window replacement ($50,000); interior renovations & repurposing of renovated space |
$50,000.00 |
Uniondale Public Library |
7 |
16 |
Renovation and repurposing of the main floor interior building spaces to create a new teen area, adult learning center, media area, & library café ($319,529); renovation of 4 restrooms ($70,000) |
$389,529.00 |
Valley Stream Public Library |
6 |
17 |
Install fencing for patio outdoor reading area ($10,000); install exterior security camera system at entrances, patio area, and parking lots ($10,000); install interior security camera system at entrances and mezzanine ($10,000); install additional Wi-Fi access points & wiring for router ($8,000) |
$48,000.00 |
Wantagh Public Library |
8 |
19 |
Electrical panel upgrades ($11,000); hot water heater ($1,000); renovate staff bathrooms ($87,000); replace interior doors ($19,000); replace exterior doors ($48,000); replace clearstory windows ($220,000); extend EPDM roof warranty ($20,000); insulate roof drain piping ($21,000); security video surveillance system ($11,000) |
$438,000.00 |
West Hempstead Public Library |
6 |
18 |
Additional lighting ($20,000); finish the south basement and turn it into a computer lab and an additional program room ($250,000) |
$270,000.00 |
Westbury Public Library |
7 |
15 |
Renovation of four bathrooms ($240,000); solar panels ($80,000); new HVAC system for adult library ($340,000); painting interior & exterior ($70,000); new carpeting ($60,000) |
$790,000.00 |
System |
Library Name |
County |
Sen. Dist. |
Asy. Dist. |
Project Description |
Amount |
System Total |
The New York Public Library |
$336,776,090.00
|
|
Allerton Branch |
Bronx |
34 |
80 |
Partial renovation |
$5,584,500.00 |
Belmont Branch |
34 |
78 |
Partial renovation |
$5,980,100.00 |
Bronx - various |
Various |
Various |
Phone systems (Bronx Branch) ($620,000); electrical power upgrades ($2,000,000); PCs and related infrastructure ($448,000); security systems (Borough wide) ($315,000) |
$3,383,000.00 |
Castle Hill Branch |
32 |
76 |
Supplemental budget request (existing project) |
$550,000.00 |
City Island Branch |
34 |
82 |
HVAC |
$500,000.00 |
Clason's Point Branch |
32 |
85 |
HVAC replacement |
$655,000.00 |
Eastchester Branch |
34 |
83 |
Full interior renovation |
$4,725,000.00 |
Edenwald Branch |
36 |
83 |
Partial renovation |
$3,375,000.00 |
Francis Martin Branch |
33 |
86 |
Partial renovation |
$3,774,000.00 |
Grand Concourse Branch |
33 |
86 |
Partial renovation; supplemental budget request (existing project) ($500,000) |
$8,901,500.00 |
Hunt's Point Branch |
32 |
82 |
Full interior renovation; partial exterior renovation |
$8,640,450.00 |
Melrose Branch |
36 |
79 |
Full interior renovation |
$6,254,010.00 |
Mosholu Branch |
33 |
80 |
Partial renovation |
$3,085,500.00 |
Mott Haven Branch |
28 |
84 |
Window replacement |
$1,300,000.00 |
Pelham Bay Branch |
34 |
82 |
Full interior renovation |
$5,988,150.00 |
Riverdale Branch |
34 |
81 |
Partial renovation |
$3,375,000.00 |
Soundview Branch |
32 |
85 |
Full renovation |
$7,000,000.00 |
Spuyten Duyvil Branch |
31 |
81 |
Full interior renovation; new roof; branch expansion ($7,312,500) |
$11,912,500.00 |
Throg's Neck Branch |
34 |
82 |
Full interior renovation |
$5,216,400.00 |
Tremont Branch |
33 |
79 |
New roof; boiler; windows; emergency lighting |
$2,060,000.00 |
Van Cortlandt Branch |
33 |
80 |
Full interior renovation ($1,710,450); acquisition ($1,000,000) |
$2,710,450.00 |
Van Nest Branch |
32 |
80 |
Full interior renovation |
$6,228,900.00 |
Wakefield Branch |
36 |
83 |
Full interior renovation |
$6,468,000.00 |
Westchester Square Branch |
34 |
82 |
Required appropriation (re-buy) |
$4,000,000.00 |
Woodstock Branch |
32 |
79 |
Supplemental budget request (existing project) |
$1,000,000.00 |
125th Street |
New York |
30 |
68 |
Full interior & exterior renovation |
$11,350,530.00 |
58th Street |
26 |
73 |
Partial renovation |
$1,500,000.00 |
67th Street |
26 |
65 |
Remaining HVAC; boiler; rear façade; exterior lighting |
$2,080,000.00 |
96th Street |
28 |
68 |
Full interior & exterior renovation |
$8,377,450.00 |
Aguilar Branch |
48 |
122 |
Window restoration |
$1,200,000.00 |
Andrew Heiskell Braille & Talking Book Library |
26 |
75 |
Replace HVAC & boiler |
$1,700,000.00 |
Bloomingdale Branch |
30 |
69 |
Full renovation |
$6,000,000.00 |
Chatham Square Branch |
25 |
64 |
Full renovation |
$6,000,000.00 |
Countee Cullen Branch |
30 |
70 |
Supplemental budget request (existing project) |
$1,000,000.00 |
Epiphany Branch |
26 |
74 |
Partial interior renovation; supplemental budget request (existing project) ($200,000) |
$5,700,000.00 |
Fort Washington Branch |
31 |
72 |
Full interior & exterior renovation |
$12,077,980.00 |
George Bruce Branch |
30 |
69 |
Exterior rehabilitation; roof; boiler; window rehabilitation |
$2,500,000.00 |
Hamilton Fish Park Branch |
25 |
64 |
Partial renovation; systems rehabilitation |
$3,228,000.00 |
Hamilton Grange Branch |
30 |
70 |
Partial renovation |
$6,120,900.00 |
Hudson Park Branch |
29 |
66 |
Full interior & exterior renovation; supplemental budget request (existing project) ($2,000,000) |
$12,000,000.00 |
Inwood Branch |
31 |
72 |
HVAC replacement; elevator rehabilitation; new roof; parapet restoration |
$2,450,000.00 |
Jefferson Market Branch |
29 |
66 |
Replace MEP systems |
$7,192,000.00 |
Kips Bay Branch |
26 |
75 |
Full interior renovation; supplemental budget request (existing project) ($300,000) |
$6,222,000.00 |
Macomb's Bridge Branch |
30 |
71 |
Acquire site; new branch construction; fire alarm ($60,000) |
$10,060,000.00 |
Manhattan - various |
Various |
Various |
Next generation desktop ($2,318,690); phone systems (Manhattan Branch) ($700,000); electrical power upgrades ($2,000,000); technology reliability upgrades ($510,000); security systems (Borough wide) ($540,000) |
$6,068,690.00 |
Muhlenberg Branch |
29 |
75 |
Partial renovation |
$8,500,000.00 |
New Amsterdam Branch |
25 |
66 |
Partial renovation |
$4,575,000.00 |
New York Public Library for the Performing Arts |
29 |
67 |
Sidewalk replacement; foundation waterproofing & drainage; safety & security ($2,850,000); replace building systems ($1,565,000) |
$5,015,000.00 |
Ottendorfer Branch |
29 |
66 |
Rehabilitate front façade; replace all windows |
$1,967,000.00 |
Schomburg Center for Research in Black Culture |
30 |
70 |
Sound system replacement ($750,000); new roof (Langston Hughes Building) ($265,000); complete renovation of American Negro Theater ($1,100,000) |
$2,115,000.00 |
Science, Industry, and Business Library (SIBL) |
26 |
75 |
Audio/visual equipment |
$65,000.00 |
Stephen A. Schwarzman Building |
26 |
75 |
Life, Health and Safety (Outside of Central Library Project) ($2,200,000); building systems replacement ($16,965,000); audio/visual equipment ($50,000) |
$19,215,000.00 |
Tompkins Square Branch |
25 |
74 |
Exterior & interior renovation |
$6,616,350.00 |
Washington Heights Branch |
30 |
71 |
Partial interior renovation (phase III) |
$4,250,000.00 |
Webster Branch |
26 |
65 |
HVAC replacement |
$500,000.00 |
Yorkville Branch |
26 |
73 |
Full interior & exterior renovation |
$8,260,560.00 |
Dongan Hills Branch |
Richmond |
24 |
62 |
New ADA compliant doors |
$300,000.00 |
Great Kills Branch |
24 |
62 |
Re-point façade; new windows |
$1,000,000.00 |
Hugenot Park Branch |
24 |
62 |
Fire alarm ($150,000); full interior & exterior renovation |
$3,650,000.00 |
Port Richmond Branch |
23 |
61 |
Full interior renovation |
$4,243,050.00 |
Richmond Town Branch |
24 |
62 |
Partial renovation |
$4,200,000.00 |
St. George Library |
23 |
61 |
Full interior & exterior renovation |
$15,768,270.00 |
Staten Island - various |
Various |
Various |
Electrical power upgrades ($1,200,000); PCs and related infrastructure ($154,800); technology reliability upgrades ($255,000); phone systems (Staten Island Branch Libraries) ($200,000); Security systems (Borough wide) ($180,000) |
$1989,800.00 |
Todt Hill- Westerleigh Branch |
24 |
63 |
Partial renovation |
$6,264,700.00 |
Tottenville Branch |
24 |
62 |
New roof; HVAC; plaza rehabilitation; lighting; fence |
$1,300,000.00 |
West New Brighton Branch |
23 |
61 |
Full interior renovation |
$4,186,350.00 |
NYPL System-wide |
Various |
Various |
Various |
Enterprise SAN ($400,000); end management infrastructure & application visualization ($500,000); digital repository system expansion ($6,400,000) |
$7,300,000 |
System |
Library Name |
County |
Sen. Dist. |
Asy. Dist. |
Project Description |
Amount |
System Total |
North Country Library System |
$9,371,070.00 |
|
Adams Center Free Library |
Jefferson |
48 |
122 |
Land acquisition; parking lot; storage |
$73,200.00 |
Adams Free Library |
48 |
122 |
New building |
$200,000.00 |
Bodman Memorial Library (PHI) |
48 |
118 |
Renovations to make all areas of the library accessible to patrons in wheelchairs (including the upstairs); install gutters; replace/repair eves and soffit all the way around; paint exterior of library; new windows; new heating system; renovation of upstairs into usable space; furniture and shelving for upstairs renovation; fill and level backyard to address drainage issues |
$150,000.00 |
Brownville Glen Park Library |
48 |
118 |
Handicap accessible entrance |
$10,000.00 |
Cape Vincent Community Library |
48 |
118 |
Replacement of roof & insulation in attic; renovations to make front entrance handicap accessible; convert desk area into usable space; new electrical to office, meeting room, and storeroom; additional restroom for the meeting room; addition for children’s room |
$147,500.00 |
Carthage Free Library |
48 |
122 |
New roof; new parking lot |
$60,000.00 |
Crosby Public Library (ANT) |
48 |
118 |
New windows; new lighting; resurface the floor; install a lift; replace the sidewalk and steps; wheelchair accessible bathroom; renovation of basement |
$25,000.00 |
Depauville Free Library |
48 |
118 |
Addition on back of library; handicap accessibility; handicap restroom; community room |
$109,240.00 |
Dexter Free Library |
48 |
118 |
Paved 50 ft. driveway; 12 vehicle parking lot; new carpets; new furniture |
$80,000.00 |
East Hounsfield Free Library |
48 |
118 |
New siding; wheelchair ramp; renovations to make all areas of the library accessible to patrons in wheelchairs (including ramps, elevator/lift, and restroom); meeting/reading room; address drainage issues |
$151,000.00 |
Elliburg Free Library |
48 |
122 |
New furnace |
$7,500.00 |
Hawn Memorial Library (CLA) |
48 |
118 |
Install a second bathroom; new roof (or lean-to awning); restructure basement for community room; cellar doors |
$35,000.00 |
Hay Memorial Library (SAH) |
48 |
122 |
New roof; HVAC |
$40,000.00 |
Henderson Free Library |
48 |
122 |
Library restructure; furniture and furnishings for new space; added storage/kitchenette |
$50,000.00 |
Lyme Free Library (CHA) |
48 |
118 |
Addition; elevator; additional space for children’s’ area; renovations to make all areas of the library accessible to patrons in wheelchairs; windows; flooring |
$280,000.00 |
Macsherry Library (ALB) |
48 |
118 |
New metal roof |
$125,000.00 |
North Country Library System |
48 |
124 |
Expand garage; emergency generator; solar panels |
$360,000.00 |
Philomathean Free Library (BEL) |
48 |
122 |
New roof; new windows; new floor for upstairs; new front doors; handicap ramps and bathroom; new lighting and electrical; renovate parking area; install (3) AC units; new carpeting throughout library |
$100,000.00 |
Roswell P. Flower Memorial Library |
48 |
118 |
New roof; renovation of existing space to make a handicap accessible Book Store; remodel room for young adult area; elevator upgrade; enlarge parking lot; upgrade lighting |
$302,430.00 |
Sally Ploof Hunter Memorial Library (BLR) |
48 |
122 |
Addition for meeting room |
$200,000.00 |
Theresa Free Library |
48 |
118 |
New furnace |
$5,000.00 |
Constableville Village Library |
Lewis |
47 |
122 |
Renovations to make all areas of the library accessible to patrons in wheelchairs; renovation of the attic to house historical materials collection; new floor in basement; renovations to exterior of the library |
$25,000.00 |
Croghan Free Library |
47 |
122 |
New roof; carpet; painting; lighting; stucco work on exterior; addition for computer room; new emergency exits; restructure of library; create Teen Area |
$145,000.00 |
Harrisville Free Library |
47 |
122 |
Elevator |
$50,000.00 |
Lowville Free Library |
47 |
122 |
Tuck-point brick exterior; painting trim and doors; new windows; replace roof; new steps; water drainage issues |
$110,000.00 |
Lyons Fall Library |
47 |
122 |
New ceiling; gas furnace & ductwork; fans for air circulation |
$28,000.00 |
Osceola Public Library |
47 |
115 |
Renovations to make all areas of the library accessible to patrons in wheelchairs; plumbing; expand library |
$90,000.00 |
Port Leydon Community Library |
47 |
122 |
Addition |
$150,000.00 |
William H. Bush Memorial Library (MAR) |
47 |
122 |
Addition; handicap accessible bathroom; community room/board room; genealogy area; designated staff work area; designated computer area; replace windows; sidewalk repairs; energy efficient lighting; furnace/heating upgrades; air conditioning; painting |
$200,000.00 |
Annie P. Ainsworth Memorial Library (SCR) |
Oswego |
48 |
122 |
New roof; renovate/replace existing fascia; drainage issues; replace siding; wiring; renovate basement |
$125,000.00 |
Cogswell Free Library (ORW) |
48 |
122 |
New carpet; new windows |
$50,000.00 |
Fulton Public Library |
48 |
124 |
River-level basement finished off for community room; brick and stone work; replacement of historic doors and handicap entrance doors; new addition; new flooring; converting attic into usable space |
$700,000.00 |
Hannibal Free Library |
48 |
128 |
Central air with dehumidifier; renovations of interior to convert storage space into Genealogy Center; addition or expand library into other side of building; new windows and doors; parking |
$600,000.00 |
Mexico Public Library |
48 |
124 |
Masonry; new roof; new furniture; new equipment; additional space for public access computers; second bathroom/handicap bathroom; new windows; renovations to the Community Room; handicap ramp; renovation of the 2nd floor |
$390,000.00 |
Phoenix Public Library |
48 |
115 |
New roof |
$25,000.00 |
Canton Free Library |
St. Lawrence |
48 |
118 |
Renovate 1950s kitchen; replace flooring in community room & kitchen; replace windows; create better airflow to counter mold issues; air conditioning |
$91,500.00 |
Hammond Free Library |
48 |
118 |
Extensive renovations to basement of existing library to make space usable; replacement of roof; construction of exterior ramp to comply with ADA specifications; replacement of hot water heater |
$90,000.00 |
Hepburn Library of Colton |
47 |
122 |
Restoring cornice; restoring columns; restoring upstairs bathroom; addition |
$197,000.00 |
Hepburn Library of Edwards |
48 |
122 |
Renovations to make all areas of the library accessible to patrons in wheelchairs (including restroom) |
$100,000.00 |
Hepburn Library of Hermon |
48 |
122 |
New lighting; new electrical; create storage area in attic; air conditioning |
$110,000.00 |
Hepburn Library of Lisbon |
48 |
118 |
Renovations to make all areas of the library accessible to patrons in wheelchairs (including restroom); new windows; masonry |
$166,700.00 |
Hepburn Library of Madrid |
48 |
122 |
Mason work to exterior of building; renovations to make all areas of the library accessible to patrons in wheelchairs; renovate downstairs into a community room/resource center; energy efficiency; drainage issues; new windows; new roof; new lighting; air conditioning |
$400,000.00 |
Hepburn Library of Norfolk |
47 |
122 |
Renovating downstairs of library to make into usable shelving area/learning center and meeting room with efficiency kitchen; restructuring new space upstairs into a Reading Center/Coffee Center |
$85,000.00 |
Hepburn Library of Waddington |
48 |
118 |
Upgrades to air conditioning system; replace radiators with baseboard heat; updating library interior; handicap accessible bathroom upstairs; additional bathroom downstairs; convert attic into usable space |
$175,000.00 |
Heuvelton Free Library |
48 |
122 |
New building (to allow for handicap accessibility) |
$1,000,000.00 |
Hopkinton Reading Center |
47 |
122 |
New building |
$150,000.00 |
Morley Library |
47 |
118 |
Wall; septic; siding |
$20,000.00 |
Morristown Public Library |
48 |
118 |
Convert attic to usable space and kitchen |
$200,000.00 |
Ogdensburg Public Library |
48 |
118 |
Replace elevator; handicap accessible restroom on main floor; renovations to make all areas of the library accessible to all patrons; parking improvements; stucco replacement; removal of unsafe handicapped ramp; new accessible entrance; improved auditorium; reconstruction of stacks; replacement of carpets and ceilings |
$1,000,000.00 |
Potsdam Public Library |
47 |
118 |
Rehabilitation of front steps; installation of elevator in existing elevator shaft and additional floor stops; renovations to install ramps; walkways; fire doors; walls to provide access to the 2nd and 3rd floors of the library |
$237,000.00 |
Reading Room Association of Gouverneur |
48 |
122 |
New ceiling; new lights |
$30,000.00 |
Rensselaer Falls Library |
48 |
118 |
Addition on rear of library |
$20,000.00 |
Richville Free Library |
48 |
122 |
Solar heat for addition; new porch; new exit |
$100,000.00 |
System |
Library Name |
County |
Sen. Dist. |
Asy. Dist. |
Project Description |
Amount |
System Total |
Pioneer Library System |
$28,757,500.00
|
|
Avon Free Library |
Livingston |
59 |
147 |
Renovate the old kitchen into a workroom; improved lighting |
$40,000.00 |
Bell Memorial Library |
57 |
147 |
New furnace; blacktop for parking lot |
$25,000.00 |
Caledonia Library Association |
59 |
147 |
Addition (includes additional meeting space, additional space for public access computers); new wiring for electrical equipment & telecommunications; renovations to make all areas of the library accessible to patrons in wheelchairs (including restroom) |
$500,000.00 |
Dansville Public Library |
57 |
147 |
Electrical upgrades; renovations & accessibility improvements to Shepard building’s secondary entry; renovations to Shepard building main entry |
$150,000.00 |
Lima Public Library |
59 |
147 |
Front doors; front building overhang; new windows; carpeting; electrical upgrades; insulation |
$130,000.00 |
Livonia Public Library |
59 |
130 |
New addition to current facility to include children’s center, multi-use community room, and teen/technology zone; installation of energy efficient windows; upgraded HVAC system, electrical, and lighting in existing building; renovation of current facility to be fully ADA compliant |
$2,500,000.00 |
Mount Morris Library |
57 |
147 |
Parking lot; new entry; fully-accessible restrooms |
$65,000.00 |
Wadsworth Library |
59 |
147 |
Complete original 1995 addition by adding a second floor and installing an elevator |
$700,000.00 |
Allens Hill Free Library |
Ontario |
54 |
130 |
Addition & renovations to be made to existing building: Meeting Room; storage room; YA area; new roof; new flooring; storage shed outside; more shelving; modernize interior; additional lighting |
$200,000.00 |
Bloomfield Public Library |
59 |
130 |
Install ramp or curb cut to sidewalk to improve accessibility from handicapped parking spaces; improve parking lot by paving, lining, and adding additional handicap parking; new roof; additional space for public access computers; replace carpeting; upgrade HVAC |
$125,000.00 |
Bristol Library |
59 |
129 |
Renovation project to include: new carpeting throughout; replacement siding; improved space for public internet computers and for circulation area; parking lot repairs |
$27,500.00 |
Clifton Springs Library |
54 |
129 |
Replace carpeting; refit 2 bathrooms with handicapped accessible facilities |
$20,000.00 |
Geneva Public Library |
54 |
129 |
Cooling tower; café and reading room construction; energy audit & HVAC upgrades; heat pump replacements (may be annual need); storm windows; interior & exterior painting; entrance renovations; bathroom addition; carpet replacement; addition of mobile branch (bookmobile) |
$300,000.00 |
Honeoye Public Library |
59 |
130 |
Parking lot improvements; accessible entry doors |
$55,000.00 |
Naples Library |
59 |
130 |
Paint interior; replace carpeting |
$50,000.00 |
Phelps Community Memorial Library |
54 |
129 |
Update 1950s plumbing & fixtures |
$10,000.00 |
Red Jacket Community Library |
54 |
129 |
Purchase of a new facility (commercial real estate) and furnishings or possible expansion of existing space |
$5,000,000.00 |
Victor Free Library |
54 |
130 |
Replace HVAC to increase energy efficiency & distribution; upgrade lighting; replace fixtures; improve ventilation; improve lighting in restrooms (2); replacement (upgrade quality) of main 4’’ pipes for fire protection system |
$100,000.00 |
Wood Library Association |
59 |
129 |
Ongoing renovations & expansion projects |
$3,000,000.00 |
Clyde-Savannah Public Library |
Wayne |
54 |
128 |
Lighting redone to be energy efficient; new doors installed with handicapped “button” for automatic opening; new carpeting; parking lot resurfacing and stripping; possible new roof; new chairs for computer stations |
$50,000.00 |
Lyons Public Library |
54 |
128 |
Partial renovation of basement into extra meeting rooms and public bathrooms |
$500,000.00 |
Macedon Public Library |
54 |
128 |
Putting an addition onto the present facility |
$500,000.00 |
Marion Public Library |
54 |
128 |
New outdoor lighting; additional space for public access computers |
$20,000.00 |
Newark Public Library |
54 |
128 |
Renovation; accessibility |
$500,000.00 |
Ontario Public Library |
54 |
128 |
New facility |
$5,000,000.00 |
Palmyra Community Library |
54 |
128 |
Ongoing renovations to unfinished areas of the new building |
$2,000,000.00 |
Red Creek Free Library |
54 |
128 |
Add space by renovating the 2nd floor (new drop ceiling; drywall; new floor; heating & air conditioning ductwork; updated electrical for both lighting & computers; new bathroom fixtures); renovate existing kitchen; install lift of some type to make the 2nd floor accessible; make necessary repairs to leaking roof above library |
$150,000.00 |
Rose Free Library |
54 |
128 |
Renovations to make all areas of the library accessible to patrons in wheelchairs |
$60,000.00 |
Sodus Free Library |
54 |
128 |
Ongoing renovations to expanded space and connector building |
$500,000.00 |
Walworth-Seely Public Library |
54 |
128 |
New building |
$4,500,000.00 |
Williamson Free Public Library |
54 |
128 |
Drop ceiling for improved energy efficiency; better lighting; noise reduction |
$75,000.00 |
Wolcott Civic Free Library |
54 |
128 |
Parking lot improvements including designated handicapped parking spots |
$25,000.00 |
Arcade Free Library |
Wyoming |
59 |
147 |
Need to upgrade/move handicap accessible entrance |
$50,000.00 |
Cordelia A. Greene Library |
59 |
147 |
New roof |
$20,000.00 |
Perry Public Library |
59 |
147 |
Additions & renovations to the current building |
$900,000.00 |
Stevens Memorial Community Library |
59 |
147 |
Part 1: Update handicapped ramp & entrance at the rear of the library which will become main entrance off the parking lot and meet ADA standards; close present entrance 80 feet along the driveway; new porch and roof structure for access at the front of building.
Part 2: Move circulation desk with new books, magazines, and DVDs to rear entrance; opening adult shelving to be handicapped accessible; create new storage area for the materials at the back of the library while creating better meeting spaces where circulation desk is situated; enlarging children’s area into a present office area with room for staff desks near the new circulation area |
$700,000.00 |
Town of Gainesville Public Library |
59 |
147 |
New lighting |
[No estimate given] |
Warsaw Public Library |
59 |
147 |
Automatic doors |
$10,000.00 |
Wyoming Free Circulating Library Association |
59 |
147 |
Replace all of the siding on the building & replace rotting boards underneath and around the foundation; add a community room with a kitchen for teen & adult programs; new shelving; new carpeting in whole library (current carpeting is 15 years old); replace main room ceiling lighting; reface inside walls; interior painting; install a security system; upgrade handicapped accessible ramp and entrance to include an automatic opening door |
$200,000.00 |
System |
Library Name |
County |
Sen. Dist. |
Asy. Dist. |
Project Description |
Amount |
System Total |
Ramapo-Catskill Library System |
$113,954,316.00
|
|
Chester Public Library |
Orange |
39 |
96 |
Replace roof; replace HVAC system and other energy efficient upgrades |
$300,000.00 |
Cornwall Public Library |
39 |
96 |
Addition to existing building; upgrades of mechanical systems; renovations of existing space |
$1,700,000.00 |
Florida Public Library |
38 |
97 |
Expansion/addition |
$250,000.00 |
Goshen Public Library and Historical Society |
39 |
97 |
New building |
$15,000,000.00 |
Josephine – Louise Public Library |
39 |
96 |
Plumbing & electrical upgrades; re-purposing existing space; expand and update technology and public internet access; renovate spacing & service at Main Circulation desk |
$76,353.00 |
Moffat Library of Washingtonville |
39 |
96 |
Renovation & restoration of historic landmark property |
$4,000,000.00 |
Monroe Free Library |
39 |
97 |
Expansion/addition; renovation |
$10,000,000.00 |
Newburgh Free Library |
39 |
100 |
Renovation |
$10,000,000.00 |
Pine Bush Area Public Library |
39 |
96 |
Build 6,000 sq. ft. addition |
$1,200,000.00 |
Port Jervis Free Library |
42 |
98 |
Replace custom-fabricated ornate cornice; interior renovations; replace windows; restore brick façade on East and South side of library; install new sprinkler system |
$1,250,000.00 |
Thrall Public Library District of Middletown and Wallkill |
42 |
98 |
20,000 sq. ft. addition; parking lot expansion |
$9,000,000.00 |
Tuxedo Park Library |
38 |
97 |
Replace HVAC system |
$100,000.00 |
Nanuet Public Library |
Rockland |
38 |
94 |
Demolition of existing building; construction of new state of the art, energy efficient, 40,000 sq. ft. building |
$19,500,000.00 |
New City Free Library |
38 |
94 |
Expansion/addition and renovation; replacement of HVAC system; installation of new circulation desk; renovations to lobby including replacement of flooring and lighting; new front entrance steps and handicap ramp; extensive renovations to meeting room including “green” lighting system |
$16,000,000.00 |
Nyack Library |
38 |
95 |
Replacement of the roof on the old part of the building |
$75,000.00 |
Orangeburg Library |
38 |
95 |
Replace handicapped ramp and deck; replace rear entry door |
$18,500.00 |
Plisades Free Library |
38 |
95 |
Building expansion; renovation; parking lot expansion; replace roof |
$600,000.00 |
Rose Memorial Library Association |
38 |
96 |
New building |
$9,000,000.00 |
Suffern Free Library |
38 |
95 |
Re-caulking the building windows and EIFS seams; replace carpeting; repair stone wall along Rt. 59; replace exterior ground lighting with energy efficient fixtures |
$442,000.00 |
Tappan Library |
38 |
95 |
Expansion/addition; renovation |
$750,000.00 |
Tomkins Cove Public Library |
38 |
96 |
Replace windows; install energy efficient lighting; install air conditioning unit; remove and replace exterior cladding to improve energy efficiency; install solar panels |
$279,000.00 |
Valley Cottage Free Library |
38 |
94 |
Replace boiler; replace skylights; remove two restrooms |
$130,000.00 |
Daniel Pierce Library |
Sullivan |
42 |
98 |
Renovation of original 1902 building; construction of overhead protection for handicapped entrance to new addition; installation of outdoor building lights; paving 20,200 sq. ft. parking lot; parking lot lighting and outside safety features; installation of interior handicapped lift |
$658,863.00 |
|
Ethelbert B. Crawford Public Library |
42 |
98 |
New building |
$5,300,000.00 |
Liberty Public Library |
42 |
98 |
Repairs; renovation; addition |
$1,700,000.00 |
Livingston Manor Library |
42 |
98 |
Repair front steps; replace HVAC; add solar panels |
$19,600.00 |
Western Sullivan Public Library |
42 |
98 |
Narrowsburg Branch – Replace oil burner; install hot water heater and chimney (solar ready); install solar panels and roof supports
Calicoon Branch – Install handicapped railing around front patio; reset or replace stones as needed; restoration of façade on back of building |
$105,000.00 |
Wallkill Public Library |
Ulster (see also Mid-Hudson) |
39 |
101 |
Construction of new state of the art, energy efficient, 8,700 sq. ft. addition to existing library building |
$6,500,000.00 |
System |
Library Name |
County |
Sen. Dist. |
Asy. Dist. |
Project Description |
Amount |
System Total |
Upper Hudson Library System |
$74,958,000.00 |
|
Albany Public Library - Main |
Albany |
46 |
106 |
Construct a new Main Library building |
$50,000,000.00 |
Altamont Free Library |
46 |
104 |
Continue development of new (train station) library building & site |
$75,000.00 |
Berne Public Library |
46 |
104 |
Repair structural support at windows; replace existing windows; new roof; repair/point brick; re-grade parking lot; repair/install drainage system; pave full parking lot |
$200,000.00 |
Bethlehem Public Library |
46 |
108 |
Construction of outdoor pavilion to extend program space; major HVAC project (includes ground source heating/cooling, separate cooling for server room); solar panel project; renovation for entry hallways, gallery space, community room, board room, story hour room, and TV studio (includes electrical work, new carpeting, new a/v systems, actual construction); expand/move walls in the youth services and boiler room areas to expand public, staff, and storage space for library |
$3,350,000.00 |
Cohoes Public Library |
46 |
106 |
Install new energy efficient windows; design, construct, and install mezzanine; construct and wire four new quiet rooms and a large conference room of mezzanine; renovate existing floor plan to promote patron collaboration and meet patron digital demands; repair existing sub floor; install new HVAC duct work and blower |
$1,000,000.00 |
Guilderland Public Library |
46 |
104 |
Renovation/rehabilitation to existing library building (new roof, new HVAC system) |
$1,000,000.00 |
RCS Community Library |
46 |
108 |
Purchase/renovation of new library building |
$250,000.00 |
Rensselaerville Public Library |
46 |
104 |
Renovation/rehabilitation of existing library building |
$150,000.00 |
Town of Westerlo Public Library |
46 |
104 |
Continue multi-phase renovation/rehabilitation of current library building |
$75,000.00 |
Voorheesville Public Library |
46 |
104 |
Purchase property; construct a new library building |
$7,600,000.00 |
Wm. K. Sanford Public Library |
46 |
109 |
Expand the current building by approximately 9,000 sq. ft. |
$2,000,000.00 |
East Greenbush Community Library |
Rensselaer |
43 |
106 |
Garden project; resurfacing of parking lot; remodeling of administrative spaces |
$128,000.00 |
Grafton Community Library |
43 |
112 |
Renovation/rehabilitation of lower level community meeting room |
$50,000.00 |
Poestenkill Library |
43 |
108 |
Expansion of library building |
$500,000.00 |
Sand Lake Town Library |
43 |
108 |
Extensive renovation of interior spaces (adult, teen, circulation desk, & staff areas); renovate bathrooms and entry |
$230,000.00 |
Stephentown Memorial Library |
43 |
112 |
Expansion of library building |
$500,000.00 |
Troy Public Library |
43 |
106 |
Renovation/rehabilitation of Main Library building |
$4,000,000.00 |
Troy Public Library - Lansingburgh |
43 |
106 |
Renovation/rehabilitation of branch library building |
$250,000.00 |
Troy Public Library- Sycaway Branch |
43 |
106 |
Purchase property; construct a new approximately 10,000 sq. ft. branch library for the Sycaway neighborhood |
$3,000,000.00 |
Valley Falls Free Library |
43 |
112 |
Expand and upgrade facilities for existing building, including handicap accessibility |
$600,000.00 |
System |
Library Name |
County |
Sen. Dist. |
Asy. Dist. |
Project Description |
Amount |
System Total |
Westchester Library System
|
$101,640,000.00 |
|
Briarcliff Manor Public Library |
Westchester |
35 |
92 |
Renovation & furnishing of existing 2,300 sq. ft. portion of building |
$1,500,000.00 |
Chappaqua Library |
37 |
89 |
Emergency exit window for Children’s program room; renovate public restrooms to improve ADA access & energy efficiency; expand Children’s area; expand parking; new roof for 2,200 sq. ft. expansion to Children’s Room |
$7,010,000.00 |
Croton Free Library |
40 |
90 |
Renovations to meeting room; telecommunications wiring; circulation area renovation |
$195,000.00 |
Dobbs Ferry Public Library |
35 |
92 |
Replacing front doors with automatic ones |
$50,000.00 |
Harrison Public Library |
37 |
89 |
Main library building renovation |
$3,500,000.00 |
Hendrick Hudson Free Library |
37 |
89 |
Renovation of existing building with expansion as a possibility to accommodate growing needs; HVAC & electric upgrades as proposed by energy audit report, including replacement of current HVAC system and changing all exit signs to LED; converting computer room to visible study room, addition of stacks; expand Children’s Area; create area for Literacy program; expand Children’s office space |
$2,000,000.00 |
Hiram Halle Memorial Library |
40 |
90 |
Expansion & renovation of existing building |
$2,900,000.00 |
John C. Hart Memorial Library |
40 |
89 |
22,000 sq. ft. addition (including additional study room space, an additional community room, a young adult area, and additional space for public access computers) |
$10,000,000.00 |
Katonah Village Library |
40 |
89 |
Meeting rooms renovation; electrical work; better access |
$30,000.00 |
Lewisboro Library |
37 |
91 |
Renovation of building incorporating meeting space, expanded collection, and expanded children’s room |
$6,000,000.00 |
Mount Pleasant Public Library |
37 |
91 |
Renovate community room; new young adult area; new local history center; renovations to staff working areas |
$450,000.00 |
New Rochelle Public Library |
34, 37 |
88, 91 |
Children’s Room; elevator code compliance; Lawton Avenue entrance renovation |
$1,000,000.00 |
North Castle Public Library |
37 |
89 |
Adult Circulation Area renovation |
$220,000.00 |
Ruth Keeler Memorial Library |
37 |
91 |
Addition of a young adult area, storage area, & quiet reading rooms; drainage work |
$1,500,000.00 |
Rye Free Reading Room |
40 |
99 |
Addition of access to lower level entrance; sprinklers & fire alarm; window replacement, insulation, & other energy-saving initiatives |
$1,000,000.00 |
Scarsdale Public Library |
37 |
91 |
Renovations to make all areas of the library accessible to patrons in wheelchairs |
$150,000.00 |
Somers Library |
37 |
88 |
7,000 sq. ft. addition (meeting room space, computers, enclosed children’s room, & teen section); new heating/air; efficient windows; efficient lighting; better outdoor lighting; new roof; repair septic system; new carpeting |
$9,500,000.00 |
The Field Library |
40 |
99 |
Replace existing building |
$25,000,000.00 |
Tuckahoe Public Library |
34 |
88 |
Alarm; upgrade electric |
$10,000.00 |
West Harrison Branch Library [Harrison PL] |
34 |
88 |
Additional meeting space; additional space for public access computers; elevator; additional space to house the current collection; upgrades to wiring for electrical equipment & telecommunications |
$5,500,000.00 |
White Plains Public Library |
37 |
88 |
Three-phase project for Main Floor Renovation including a new Teen Center and middle floor renovations |
$10,000,000.00 |
Yonkers Public Library - Crestwood Branch |
35 |
93 |
ADA accessibility; HVAC/energy conservation improvements |
$725,000.00 |
Yonkers Public Library - Grinton I. Will Branch Library |
35 |
93 |
Renovation/infrastructure improvements; parking lot expansion |
$12,700,000.00 |
Yonkers Public Library - Riverfront Library |
35 |
93 |
Teen Room remodeling/expansion; replace automatic doors; finish shell space in basement |
$700,000.00 |