County |
Assembly
District |
Senate
District |
Library |
Address |
Grant
Amount |
Project Description |
| Kings |
40 |
17 |
Cypress Hills |
1197 Sutter Avenue Brooklyn NY 11208 |
$82,576 |
With the addition of Self-Check technology and replacement of the traditional larger circulation desks with smaller service kiosks and the renovation of staff work rooms, BPL plans to implement a new, more effective model of public service. |
| 19 |
New Lots |
665 New Lots Avenue Brooklyn NY 11207 |
$82,576 |
With the addition of Self-Check technology and replacement of the traditional larger circulation desks with smaller service kiosks and the renovation of staff work rooms, BPL plans to implement a new, more effective model of public service. |
| 43 |
20 |
Crown Heights |
556 New York Avenue Brooklyn NY 11225 |
$82,575 |
With the addition of Self-Check technology and replacement of the traditional larger circulation desks with smaller service kiosks and the renovation of staff work rooms, BPL plans to implement a new, more effective model of public service. |
| 46 |
23 |
Coney Island |
1901 Mermaid Avenue Brooklyn NY 11224 |
$82,576 |
With the addition of Self-Check technology and replacement of the traditional larger circulation desks with smaller service kiosks and the renovation of staff work rooms, BPL plans to implement a new, more effective model of public service. |
| 50 |
18 |
Walt Whitman |
93 St. Edwards Street Brooklyn NY 11205 |
$82,576 |
With the addition of Self-Check technology and replacement of the traditional larger circulation desks with smaller service kiosks and the renovation of staff work rooms, BPL plans to implement a new, more effective model of public service. |
| 25 |
Williamsburg |
240 Division Avenue Brooklyn NY 11211 |
$82,576 |
With the addition of Self-Check technology and replacement of the traditional larger circulation desks with smaller service kiosks and the renovation of staff work rooms, BPL plans to implement a new, more effective model of public service. |
| 52 |
Carroll Gardens |
396 Clinton Street Brooklyn NY 11231 |
$82,576 |
With the addition of Self-Check technology and replacement of the traditional larger circulation desks with smaller service kiosks and the renovation of staff work rooms, BPL plans to implement a new, more effective model of public service. |
| 53 |
17 |
Bushwick |
340 Bushwick Avenue Brooklyn NY 11206 |
$82,576 |
With the addition of Self-Check technology and replacement of the traditional larger circulation desks with smaller service kiosks and the renovation of staff work rooms, BPL plans to implement a new, more effective model of public service. |
| Washington Irving |
360 Irving Avenue Brooklyn NY 11237 |
$82,575 |
With the addition of Self-Check technology and replacement of the traditional larger circulation desks with smaller service kiosks and the renovation of staff work rooms, BPL plans to implement a new, more effective model of public service. |
| 54 |
17 |
Arlington |
203 Arlington Avenue Brooklyn NY 11207 |
$82,576 |
With the addition of Self-Check technology and replacement of the traditional larger circulation desks with smaller service kiosks and the renovation of staff work rooms, BPL plans to implement a new, more effective model of public service. |
| 55 |
18 |
Saratoga |
8 Thomas S. Boyland Street Brooklyn NY 11233 |
$82,575 |
With the addition of Self-Check technology and replacement of the traditional larger circulation desks with smaller service kiosks and the renovation of staff work rooms, BPL plans to implement a new, more effective model of public service. |
| 56 |
20 |
Eastern Parkway |
1044 Eastern Parkway Brooklyn NY 11213 |
$82,576 |
With the addition of Self-Check technology and replacement of the traditional larger circulation desks with smaller service kiosks and the renovation of staff work rooms, BPL plans to implement a new, more effective model of public service. |
| 57 |
18 |
Bedford |
496 Franklin Avenue Brooklyn NY 11238 |
$82,575 |
With the addition of Self-Check technology and replacement of the traditional larger circulation desks with smaller service kiosks and the renovation of staff work rooms, BPL plans to implement a new, more effective model of public service. |
| Clinton Hill |
376 Washington Avenue Brooklyn NY 11238 |
$82,575 |
With the addition of Self-Check technology and replacement of the traditional larger circulation desks with smaller service kiosks and the renovation of staff work rooms, BPL plans to implement a new, more effective model of public service. |
| 58 |
19 |
Brownsville |
61 Glenmore Avenue Brooklyn NY 11212 |
$82,575 |
With the addition of Self-Check technology and replacement of the traditional larger circulation desks with smaller service kiosks and the renovation of staff work rooms, BPL plans to implement a new, more effective model of public service. |
| East Flatbush |
9612 Church Avenue Brooklyn NY 11212 |
$82,575 |
With the addition of Self-Check technology and replacement of the traditional larger circulation desks with smaller service kiosks and the renovation of staff work rooms, BPL plans to implement a new, more effective model of public service. |
| 59 |
20 |
Jamaica Bay |
9727 Seaview Avenue Brooklyn NY 11236 |
$82,575 |
With the addition of Self-Check technology and replacement of the traditional larger circulation desks with smaller service kiosks and the renovation of staff work rooms, BPL plans to implement a new, more effective model of public service. |
County |
Assembly
District |
Senate
District |
Library |
Address |
Grant
Amount |
Project Description |
| Erie |
141 |
58 |
Buffalo Central Library |
1 Lafayette Square Buffalo NY 14203 |
$617,970 |
Asbestos abatement, space reconfiguration, and energy saving improvements of 25,900 square feet of the central library, plus security improvements inside/outside, will increase the effectiveness of library service and more efficiently utilize the building. |
| 142 |
59 |
Aurora Town Public Library |
550 Main Street
East Aurora NY 14052 |
$108,200 |
Replacement of a flat roof and the restoration of a peaked roof--including code compliant tapered insulation for proper drainage and energy efficiency--will reduce energy costs and increase conservation of resources. |
| 145 |
58 |
West Seneca Public Library |
1300 Union Road
West Seneca NY 14224 |
$8,332 |
A total of 2,100 square feet of sidewalk will be replaced to allow safe entrance and egress from the library and to provide handicapped accessibility. |
| 146 |
Eden Library |
2901 E. Church Street
Eden NY 14057 |
$4,847 |
Cracked, uneven sidewalks at the north, south and main entry of the library will be replaced to provide safe access and exit. Additionally, the replacement of deteriorated curbing in the parking lot will improve safety for all library users. |
County |
Assembly
District |
Senate
District |
Library |
Address |
Grant
Amount |
Project Description |
| Cattaraugus |
149 |
57 |
Olean Public Library |
134 N. Second Street
Olean NY 14760-2583 |
$120,000 |
Energy consumption will be reduced and the building will be maintained by the removal and replacement of the upper level of the library's roof. |
| Chautauqua |
57 |
Sinclairville Free Library |
15 Main Street
PO Box 609 Sinclairville NY 14782-0609 |
$2,672 |
Access to the building will be improved for all library users by adding three parking spaces to the existing two spaces at the front of the library. Additionally, the curb will be modified to add a handicapped access parking space to the rear parking lot. |
| 150 |
Dunkirk Free Library |
536 Central Avenue
Dunkirk NY 14048 |
$15,800 |
Energy consumption will be reduced by upgrading the library's interior lighting with more up-to-date, energy efficient and better-performing fixtures. |
| Mary E. Seymour Memorial Library |
22 N. Main Street
Stockton NY 14784 |
$42,240 |
Energy consumption will be reduced by replacing the roof, installing a new HVAC system with energy efficient units, insulating attic space and installing energy efficient lighting. |
| Patterson Library |
40 S. Portage Street
Westfield NY 14787-1496 |
$41,167 |
Failing steel lintels causing damage to the rear brick work of the 103-year old building will be replaced, thereby preserving the building and ensuring library service to the community. |
County |
Assembly
District |
Senate
District |
Library |
Address |
Grant
Amount |
Project Description |
| Clinton |
113 |
45 |
Ausable Forks Free Library |
9 West Church Lane Ausable Forks NY 12912 |
$4,011 |
Energy efficiency will be improved and the building and materials will be preserved by the repair of damaged portions of underlayment, the installation of a new metal roof (with 26-gauge panels), the addition of a new metal drip edge and sanitizing the building interior. |
| Wells Memorial Library |
Rte 9N
PO Box 57 Upper Jay NY 12987 |
$16,633 |
Library services to this geographically isolated community will be addressed through flood damage mitigation and library rehabilitation (including handicapped access) to permit the library to reopen. |
| 114 |
Chazy Public Library |
9633 Rte 9
PO Box 88
Chazy NY 12921- 0088 |
$40,711 |
Library service and capacity will be increased through a multimedia, technologically equipped Community Room with a job center--which will include tutoring, instruction, presentation and viewing areas--as well as exterior work to provide handicap access, driveway repair and parking area construction. |
| Dannemora Free Library |
40 Emmons Street
Box 326 Dannemora NY 12929-0326 |
$3,089 |
Library access and service will be improved by the restructuring/designing of two rooms at the Community Center into new children's and teen spaces and the provision of additional storage. |
| Mooers Free Library |
2430 Rte. 11 PO Box 286 Mooers NY 12958-0286 |
$10,835 |
Access to the building will be improved for all library users--including those with physical disabilities. In partnership with the town, Mooers Library will install a lift and renovate the bathroom so the library is compliant with the American Disabilities Act. |
| Plattsburgh Public Library |
19 Oak Street
Plattsburgh NY 12901-2810 |
$7,416 |
Both safety and access to the library building will improve with this accessibility project, which includes ADA bathroom renovations and an accessible public access workspace with webcam, adjustable table and walls; as well as a keyless entry and "crash bars" on specified exits. |
| Rouses Point Dodge Memorial Library |
144 Lake Street
Rouses Point NY 12979-1429 |
$13,596 |
Library services will be extended to all patrons through this accessibility project by enlarging the parking lot and installing an outdoor drop box. |
| Essex |
113 |
Lake Placid Public Library |
2471 Main Street
Lake Placid NY 12946 |
$3,675 |
Access to the building will be improved for all library users--including those with physical disabilities--by the installation of a door-opening device for the outside library door and back-up lift lowering equipment for an interior elevator. |
| Paine Memorial Free Library |
2 Gilliland Lane
Willsboro NY 12996-3727 |
$26,500 |
Energy efficiency will be improved and the building and materials will be preserved by the replacement of the existing batten seam copper roof with new 16-ounce copper for building maintenance and 20-oz copper for the chimney flashing. |
| Franklin |
114 |
Goff Nelson Memorial Library |
41 Lake Street
Tupper Lake NY 12986-1610 |
$4,900 |
Energy costs (propane) will be decreased and patron comfort increased through the installation of insulated window covers to block heat in the summer and cold in the winter. |
| Saranac Lake Free Library |
109 Main Street
Saranac Lake NY 12983 |
$2,802 |
The library will improve access to and use of building services by all library users--including those with physical disabilities--by renovating an existing walkway to the front door of the library to make it ADA compliant and adding an entry pad to the community room. |
County |
Assembly
District |
Senate
District |
Library |
Address |
Grant
Amount |
Project Description |
| Broome |
126 |
52 |
George F. Johnson Memorial Library |
1001 Park Street
Endicott NY 13760 |
$7,944 |
Library service will increase through the creation of more energy efficient building space. The asbestos ceiling will be replaced and damaged and loose interior glass panels will be replaced and/or secured. |
| Chenango |
107 |
Moore Memorial Library |
59 Genesee Street
Greene NY 13778 |
$107,092 |
The planned changes will improve the utilization of the building, improve energy conservation and maintain building capacity to house library services. The 108-year old tile roof will be restored: tiles removed and reinstalled, new underlayment, copper gutters, flashing, etc. and damaged inside plaster will be repaired. |
| New Berlin Library |
15 S Main Street
Box J
New Berlin NY 13411 |
$5,650 |
The repair will stabilize the building for continued provision of library services and reduce maintenance and energy costs. The roof and dormers on the library were replaced 26 years ago. Unfortunately a portion of the front roof, due to ice build-up during the winter, has begun leaking. The dormers in this same area are rotting and need to be rebuilt and interior damage to several ceilings needs to be repaired. |
| Oxford Memorial Library |
PO Box 552 Oxford NY 13830-0552 |
$53,493 |
Access to the building will be improved for all library users--including those with physical disabilities. Both floors of the historic Burr House will be renovated, including electric systems, to meet ADA requirements. |
County |
Assembly
District |
Senate
District |
Library |
Address |
Grant
Amount |
Project Description |
| Columbia |
103 |
41 |
Claverack Free Library |
9 State Rte. 9H PO Box 417 Claverack NY 12513 |
$35,750 |
Access to and use of the building will be improved for all library users--including those with physical disabilities--by The Claverack Free Library's construction of an accessibility infrastructure for the adaptive reuse of the A.B. Shaw Firehouse. |
| New Lebanon Library |
550 Routes 20/22
New Lebanon NY 12125 |
$22,747 |
Energy efficiency and services will be improved through removation of the Children's Room: wall insulation will be added, windows and flooring will be replaced, existing shelving will be replaced with modern shelving designed with children in mind, and old, inefficient lighting will be replaced with modern, energy efficient equipment. |
| Roeliff Jansen Community Library |
9091 Rte 22 Hillsdale NY 12529-0669 |
$55,747 |
Consistent with their commitment to a green, LEED-certified building, the library will build a geothermal system which will heat the water for the building’s radiant heating system, provide heat for a back-up forced hot air heating system and provide the cooling for air conditioning. |
| 108 |
Kinderhook Memorial Library |
18 Hudson Street
PO Box 293 Kinderhook NY 12106 |
$5,000 |
The library will renovate its Children's Room and meeting space in order to improve accessibility and accommodate concurrent programs and general library use . |
| Dutchess |
100 |
Mid-Hudson Library System |
103 Market Street
Poughkeepsie NY 12601-4028 |
$32,879 |
The System will increase and improve its building space and capacity for upgraded services to member libraries through the restoration, rehabilitation and upgrading of two facets of the exterior of the MHLS Auditorium, the restoration of the building façade and installation of a new roof. |
| 103 |
Red Hook Public Library |
7444 South Broadway
Red Hook NY 12571-1722 |
$5,000 |
Library services will be improved and the building used more efficiently through the installation of new fixtures, as well as by finishing and adding technology in the Children's Library and Tween/Programming rooms. |
| Greene |
101 |
51 |
Haines Falls Free Library |
County Route 18
PO Box 397 Haines Falls NY 12436-0397 |
$55,747 |
An energy efficient and improved building space will be created through the complete interior insulation and partition build-out of a new library in the population center of Tannersville, NY. |
| 127 |
Cairo Public Library |
512 Main Street
PO Box 720 Cairo NY 12413-0720 |
$115,747 |
All construction activities will create an energy efficient library space and provide effective library services to the community. The project is Phase 2 of new library construction and will include the building envelope (exterior wall materials, windows, doors, roof, insulation, etc.) and interior finishes (walls, ceilings, floors, borrowed light windows, etc.). |
| Putnam |
108 |
40 |
Patterson Library Association |
1167 Rte. 311 PO Box 418 Patterson NY 12563-0418 |
$137,747 |
Library services will become more effective and staff more efficient through the renovation of acquired, additional space and original areas of the current building and the expansion and improvement of all public service and staff work areas. |
| Ulster |
101 |
42 |
Phoenicia Library |
48 Main Street
PO Box 555 Phoenicia NY 12464 |
$129,909 |
The Phoenicia Library will be rebuilt after it was devastated by fire, improving energy efficiency, providing ADA accessibility and more community space. |
County |
Assembly
District |
Senate
District |
Library |
Address |
Grant
Amount |
Project Description |
| Herkimer |
117 |
51 |
Frank J. Basloe Library |
245 N. Main Street
Herkimer NY 13350 |
$26,135 |
In order to meet asbestos handling codes, flooring will be removed, tiles removed or sealed, and carpet replaced, thereby creating a better building for all library users. |
| Old Forge Library |
220 Crosby Blvd.
PO Box 128 Old Forge NY 13420-0128 |
$4,681 |
To preserve and improve the efficiency of the Cohen Memorial Wing and the Gallery Room of the Old Forge Library, the ceilings and sidewalls will be sprayed with foam insulation. Additional roof insulation and interior improvements will increase the effectiveness of library service by improved building space utilization. |
| Madison |
111 |
49 |
New Woodstock Free Library |
2106 Main Sreet
PO Box 340 New Woodstock
NY 13122 |
$13,907 |
This project follows through on the recommendations of an energy audit. Real long-term savings will be realized in reduced energy costs as windows are replaced, lighting upgraded and the heating system upgraded. Ultimately, the community will have an energy-efficient, modern facility operating on smart energy principles. |
| Cazenovia Public Library |
100 Albany Street
Cazenovia NY 13035-1287 |
$91,123 |
This project will achieve higher energy efficiency, add security, fire and cooling systems and preserve this historic building, which will help move all three buildings of the library into the 21st century in terms of security, fire protection, public safety, comfort and energy usage, while at the same time protecting and restoring some of the library's important historic architectural features. |
| Morrisville Public Library |
87 E. Main Street
PO Box 37 Morrisville NY 13408 |
$2,936 |
This project will enable the library to continue with critical roof and ceiling restoration, thereby increasing both the effectiveness of library service due to improved building space and more efficient utilization of the building by improving energy use. |
| Oneida |
111 |
49 |
C.W. Clark Memorial Library |
160 N. Main Street
Oriskany Falls NY 13425-0670 |
$24,658 |
The project will add a handicap parking area, a larger parking lot for improved access to the building by all library users, new pavement for the driveway, fencing and lighting in the parking lot for improved safety, and improved drainage . |
| 115 |
47 |
Barneveld Free Library |
118 Boon Street
PO Box 298 Barneveld NY 13304 |
$3,493 |
The library will build a parking lot, which will improve access to and increase effectiveness of library services for all library users. |
| Didymus Thomas Memorial Library |
9639 Main Street
PO Box 410 Remsen NY 13438 |
$5,790 |
The project involves the removal and disposal of existing roof materials, installation of new 35-40-year architectural shingles, ridge cap, drip edge and snow and ice barriers in order to safeguard against further interior damage, stem current heat loss to improve energy efficiency, and protect its collections and equipment. |
| New Hartford Public Library |
2 Library Lane
New Hartford NY 13413-2815 |
$19,953 |
By correcting a serious design flaw in the original roof construction, this project will not only correct roof design flaws, but will also improve energy conservation through increasing ventilation in the attic spaces, resulting in reduced moisture buildup and leaks and reduced utility costs. |
| 116 |
Dunham Public Library |
76 Main Street
Whitesboro NY 13492-1027 |
$13,005 |
The project corrects a design flaw in the current lighting system of the main library. The current metal halide system is inadequate, hazardous and inefficient. The new system will increase efficient utilization of the building and reduce energy consumption and cost. |
| Jervis Public Library |
613 N. Washington Street
Rome NY 13440 4296 |
$134,959 |
The project includes energy conservation measures, construction of a teen services area and installation of a security system, all of which will improve and expand the effectiveness of library service and safety. |
| Mid-York Library System |
1600 Lincoln Avenue
Utica NY 13502 |
$22,100 |
This project will create and provide a more secure environment for the member-shared automation data/equipment and provide a more efficient/safer utilization of the Headquarters facility for programming, processing, and delivery services to member libraries. Critical IT equipment will be secured, the loading dock will be insulated, the lighting will be upgraded, asbestos abatement will be conducted, and water-damaged walls repaired. |
County |
Assembly
District |
Senate
District |
Library |
Address |
Grant
Amount |
Project Description |
| Montgomery |
105 |
44 |
Fort Plain Free Library |
19 Willett Street
Fort Plain NY 13339-1130 |
$5,750 |
The library will replace the main, lower and back roof for energy savings, interior management, and building maintenance. |
| Schenectady |
Schenectady County Public Library |
99 Clinton Street
Schenectady NY 12305-2083 |
$325,837 |
The library will renovate and provide furnishings/shelving/computers for a new Children's Room and meeting rooms; update with a circulation desk and user-friendly shelving; and make facilities changes for conversion to RFID. All activiites will increase the effectiveness of library service due to increased/improved building utilization and improved staff efficiency. |
| Schoharie |
127 |
44 |
Middleburgh Library |
323 Main Street
PO Box 670 Middleburgh NY 12122-9662 |
$11,892 |
The community room kitchen and staff workroom will be redesigned for greater energy efficiency, staff efficiency, and increased programming. |
| 51 |
Community Library |
PO Box 219 110 Union Street
Cobleskill NY 12043-0219 |
$2,699 |
Entry doors to the library will be accessible to persons with disabilities, thereby improving use of the building by all library users, including those with physical disabilities. |
| Schoharie Free Library Association |
103 Knower Avenue
PO Box 519 Schoharie NY 12157-0519 |
$22,535 |
The library will replace furnaces with 95% two-stage high efficiency propane units and insulated ductwork, and T12 fluorescent lighting with T8 fixtures. These activities will greatly reduce energy costs and improve energy conservation. |
County |
Assembly
District |
Senate
District |
Library |
Address |
Grant
Amount |
Project Description |
| Nassau |
10 |
8 |
Bethpage Public Library |
47 Powell Avenue
Bethpage NY 11714 |
$100,000 |
Failing HVAC equipment dating from 1962 will be replaced for energy conservation and increased efficiency. |
| 12 |
6 |
Plainedge Public Library |
1060 Hicksville Road
North Massapequa NY 11758-1289 |
$3,928 |
Due to age and severe deterioration, the 43-year old, energy-inefficient rooftop air conditioning unit with corroded ducts will be totally replaced, thereby increasing air quality and efficiency. |
| 13 |
5 |
Bayville Free Library |
34 School Street
Bayville NY 11709-1954 |
$11,000 |
A new gas-fired boiler will be installed to provide hot water for a new heating coil to be installed in an existing air handler unit, thereby increasing the efficiency of energy use and reducing costs. |
| Sea Cliff Village Library |
300 Sea Cliff Avenue
PO Box 280 Sea Cliff NY 11579-0280 |
$4,787 |
A drainage system, commonly referred to as a French Drain, will be installed to dewater soils immediately below the basement floor. The project will increase the effectiveness of library service by allowing utilization of the basement area for storage, thus freeing up space on the main level. |
| 6 |
Plainview-Old Bethpage Library |
999 Old Country Road
Plainview NY 11803-4995 |
$13,950 |
The reconstruction of handicapped sidewalk panels, the installation of bollards, the replacement of a drainage grate, and required regrading and resurfacing of the lot will greatly improve safety and access to and use of building services. |
| 7 |
Bryant Library |
2 Paper Mill Road
Roslyn NY 11576-2193 |
$8,212 |
The boiler in the Bryant Library will be replaced to preserve library space and materials, and to ensure maintenance of services to the community. |
| 14 |
9 |
Baldwin Public Library |
2385 Grand Avenue
Baldwin NY 11510-3289 |
$4,000 |
The library will achieve noise abatement in its Atrium, the busiest area of the building, through the construction of an acoustical wall system. This will improve the effectiveness of library service due to improved building space utilization. |
| Henry Waldinger Memorial Library |
60 Verona Place
Valley Stream NY 11582-3011 |
$69,461 |
The HVAC system will be replaced to increase energy efficiency and to improve the climate and the physical environment for better public use and staff productivity. |
| Rockville Centre Public Library |
221 N. Village Avenue
Rockville Centre NY 11570-2315 |
$100,000 |
The removal of a 28' by 22' skylight with an energy-efficient roof, ceiling tiles and energy-efficient lighting will improve the utilization of building space and increase energy conservation. |
| 16 |
7 |
Port Washington Public Library |
1 Library Drive
Port Washington NY 11050-2916 |
$100,000 |
This project includes the removal of the existing built-up roof and insulation from the original library building and installation of a new roof system including integrated solar panels. The new roofing system will reduce electrical consumption and increase the library's operating efficiency. |
| 17 |
8 |
Garden City Public Library |
60 Seventh Street
Garden City NY 11530-2891 |
$12,500 |
Replacing a concealed spline ceiling with a dropped ceiling and replacing incandescent lighting with energy-efficient lighting will create better and more efficient utilization of the building and reduce energy costs. |
| North Merrick Public Library |
1691 Meadowbrook Road
North Merrick NY 11566-2500 |
$85,395 |
The original 1957 library roof will be repaired to protect the understructure and increase energy efficiency, which will better protect and insulate the building, thereby reducing energy costs and the carbon footprint of the library. |
| 18 |
5 |
Nassau Library System |
900 Jerusalem Avenue
Uniondale NY 11553-3039 |
$10,462 |
The replacement of the dry cooler unit of the HVAC system for the Computer Room and the creation of a passageway for additional sorting space for delivery will increase the effectiveness of library service and utilize the building more efficiently.. |
| 19 |
6 |
Levittown Public Library |
1 Bluegrass Lane
Levittown NY 11756-1292 |
$100,000 |
The construction of an approximately 6,000 square foot addition to the northeast side of the library building will increase the effectiveness of library service due to increased building space and capacity. |
| 8 |
Bellmore Memorial Library |
2288 Bedford Avenue
Bellmore NY 11710-3690 |
$53,603 |
The library will replace the damaged roof of the Bellmore Memorial Library with an energy-efficient roof designed to prevent water pooling and to improve energy conservation. |
| Freeport Memorial Library |
144 W. Merrick Road
Freeport NY 11520-4225 |
$59,483 |
The library will renovate existing restrooms and construct a new ADA-compliant restroom on the second floor, thereby improving accessibility and reducing energy consumption. |
| Seaford Public Library |
2234 Jackson Avenue
Seaford NY 11783 2691 |
$18,515 |
The HVAC system for the lower level of the library, which houses the Children's Room, teen area and collection and the community room, will be replaced in order to increase the energy efficiency of the HVAC system for the lower level of the library, reducing energy consumption and lowering energy costs.. |
| Wantagh Public Library |
3285 Park Avenue
Wantagh NY 11793-3356 |
$100,000 |
Renovation Phase II of the library interior involves asbestos removal and renovations to bring the building up to code and make it ADA compliant. |
| 21 |
6 |
Franklin Square Public Library |
19 Lincoln Road
Franklin Square NY 11010-3616 |
$54,155 |
The library will install two sets of automated doors in its main entranceway and will renovate the front vestibule for energy efficiency and improved access for all library users, including those with physical disabilities. |
County |
Assembly
District |
Senate
District |
Library |
Address |
Grant
Amount |
Project Description |
| Genesee |
139 |
61 |
Byron-Bergen Public Library |
13 S. Lake Avenue
PO Box 430 Bergen NY 14416-0430 |
$7,325 |
The wall will be opened via a French door to provide easy and secure access to an additional programming and educational resource space, thereby increasing the effectiveness of library service. |
| Niagara |
138 |
60 |
Niagara Falls Public Library |
1425 Main Street
Niagara Falls NY 14305-2547 |
$8,325 |
The library will change light fixtures and entranceway doors for increased energy efficiency. |
| 62 |
Lockport Public Library |
23 East Avenue
PO Box 475 Lockport NY 14094-0475 |
$79,330 |
The library will upgrade three rooftop air handling units and replace existing light fixtures to improve performance and energy efficiency, and to reduce energy costs. |
| Nioga Library System |
6575 Wheeler Road
Lockport NY 14094-9400 |
$26,903 |
This project involves the reconstruction of the building central hall and continuing education office, as well as upgraded electrical panels and computer networks, to improve the effectiveness of library services and make more efficient utilization of the building spaces. |
| Youngstown Free Library |
240 Lockport Street Youngstown NY 14174-1008 |
$8,945 |
An unused room will be reconfigured for storage and a meeting room. The current storage room will be opened to provide library shelf space and seating, thereby increasing the effectiveness of library services due to increased and improved building space and capacity.. |
| 142 |
62 |
Middleport Free Library |
9 Vernon Street
Middleport NY 14105-1308 |
$11,174 |
The library will make the building more energy efficient by installing an energy-efficient furnace, air conditioners, doors and windows, as well as upgrading shingles. |
| Orleans |
139 |
62 |
Lee-Whedon Memorial Library |
620 West Avenue
Medina NY 14103-1532 |
$8,615 |
The library will reconfigure the parking lot to add extra parking spaces, as well as increase the distance between rows, for improved access and safety. |
| Swan Library |
4 N. Main Street
Albion NY 14411-1241 |
$311,684 |
The library will build a 14,600 square foot energy-efficient building to improve access, security, parking, and collection and meeting space in Albion. |
County |
Assembly
District |
Senate
District |
Library |
Address |
Grant
Amount |
Project Description |
| Jefferson |
122 |
48 |
Hay Memorial Library |
105 S. Broad Street
Box 288 Sackets Harbor NY 1368- 0288 |
$13,624 |
The library will address handicap accessibility to the library and improve parking lot safety and drainage issues, thereby improving access to and use of building services by all library users, including those with physical disabilities.. |
| Lewis |
122 |
47 |
B. Elizabeth Strong Memorial Library |
6312 Main Street
PO Box 27
Turin NY 13473-0017 |
$9,272 |
The B. Elizabeth Strong Memorial Library will build a new roof to preserve and maintain the library building and to improve maintenance and energy costs. |
| Harrisville Free Library |
8209 Main Street
Harrisville NY 13648-0207 |
$26,469 |
The library will undergo a total restructure of the library to expand services and to provide handicap accessibility. |
| Osceola Public Library |
2117 N. Osceola Road Camden NY 13316 |
$10,415 |
The library will provide handicap accessibility and address energy efficiency in the library. |
| William H. Bush Memorial Library |
Whitacker Road
PO Box 141
Martinsburg NY 13404-0141 |
$6,570 |
The library will replace its roof for building preservation and energy conservation. |
| Oswego |
115 |
48 |
Central Square Library |
637 S. Main Street
PO Box 513 Central Square NY 13036-0513 |
$12,250 |
The library will be improve its energy efficiency by replacing single pane windows; installing a new entrance door and storm door; and installing a new 95% efficient heating unit with central air and reconfigured ductwork so that all areas of the library will be properly heated or cooled. In addition, 20 inches of R-60 (child and school safe) insulation will be added to the attic. |
| Parish Public Library |
3 Church Street
PO Box 465
Parish, NY 13131 |
$22,663 |
The library will replace the roof and address interior damages to maintain the library building and increase the energy efficiency of the building. |
| Phoenix Public Library |
34 Elm Street
Phoenix NY 13135-1221 |
$2,955 |
The library will undergo an energy efficiency project to upgrade their existing lighting. |
| Williamstown Library |
2877 County Route 17N
Williamstown NY 13493 |
$32,615 |
The library will build a 21'7" x 24' addition to the library to meet the growing needs of the community and to increase the effectiveness of library service by increasing building capacity. |
| 128 |
Hannibal Free Library |
162 Oswego Street
Hannibal NY 13074 |
$30,394 |
A 22' x 12' addition will be built, incorporating an 18' x 8' existing garage for storage and office areas, to increase the effectiveness of library service through increased and improved building space and capacity. |
| St. Lawrence |
118 |
47 |
Massena Public Library |
41 Glenn Street
Massena NY 13662-2088 |
$29,950 |
The library will rehabilitate the chimney and address ventilation and drainage issues to improve building use and efficient utilization of the building. |
| 48 |
Ogdensburg Public Library |
312 Washington Street
Ogdensburg NY 13669-1518 |
$52,710 |
The library will rehabilitate the existing windows for energy conservation while maintaining the historic integrity of the building. |
| 122 |
47 |
Hepburn Library |
84 Main Street PO Box 7
Colton NY 13625 |
$7,950 |
The library will restore three stone chimneys and the front steps to preserve and maintain the library's ability to provide services to its community. |
| Hepburn Library Of Norfolk |
1 Hepburn Street
PO Box 350
Norfolk NY 13667-0530 |
$2,650 |
The library will rehabilitate the front steps to provide safe access to and use of building services by all library users while preserving the historic integrity of the building. |
County |
Assembly
District |
Senate
District |
Library |
Address |
Grant
Amount |
Project Description |
| Onondaga |
119 |
49 |
Tully Free Library |
4840 W. Seneca Turnpike
Tully NY 13159-0250 |
$7,991 |
This project involves the installation of an air conditioning system in the library, including the community room, for increased building capacity and energy efficiency; and the renovation of the circulation area for improved utilization of building space and increased staff efficiency. |
| 50 |
Onondaga Free Library |
4840 W. Seneca Turnpike Syracuse NY 13215-4202 |
$5,815 |
A security system will be installed to monitor the building to maintain employee and patron safety and to address loss prevention. |
| 120 |
49 |
Onondaga County Public Library |
447 S. Salina Street
Syracuse NY 13202-2494 |
$125,363 |
Mundy's physical space will be reconstructed into an InfoTech Center: a 21st century library with an emphasis on technology, mobility and flexible spaces. |
| 121 |
Fayetteville Free Library |
300 Orchard Street
Fayetteville NY 13066-1386 |
$250,695 |
Space in the existing library will be renovated to build a business center and a public Fab Lab, which is a collection of commercially available machines and parts linked by software and processes developed for making items. |
| Northern Onondaga Public Library |
8686 Knowledge Lane
Suite 1
Cicero NY 13039 |
$43,489 |
An efficient, permanent, multi-purpose facility with concrete floor to be used by all three System libraries will be constructed to increase the effectiveness of library service in each facility. |
| 124 |
50 |
Baldwinsville Public Library |
33 E. Genesee Street
Baldwinsville NY 13027-2575 |
$3,959 |
This project will implement four energy conservation improvements recommended in a 2010 "Energy Conservation Study" of the Baldwinsville Public Library. |
| Maxwell Memorial Library |
14 Genesee Street
Camillus NY 13031-1128 |
$9,050 |
The roof covering portions of the library added in 1986-87 will be stripped to existing decking, damaged decking replaced, and new roof applied, thereby preserving the library building and protecting its collection, while improving the energy efficiency of the building. |
County |
Assembly
District |
Senate
District |
Library |
Address |
Grant
Amount |
Project Description |
| Livingston |
130 |
59 |
Livonia Public Library |
2 Washington Street
PO Box 107
Livonia NY 14487-0107 |
$81,750 |
The library will be purchasing the adjacent property, removing the structure, and creating a designated parking area to improve access to and use of building services by all library users, including those with phsysical disabilities. |
| Ontario |
130 |
59 |
Honeoye Public Library |
8708 Main Street
Honeoye NY 14471 |
$117,444 |
This project will create an addition to the community meeting room with an internet counter; add new restrooms, display areas, storage and an office; and renovate current circulation and work areas. All improvements are designed to increase the effectiveness of library service due to increased and improved building space and capacity. |
| Wayne |
128 |
54 |
Lyons Public Library |
122 Broad Street
Lyons NY 14489 1401 |
$27,747 |
The library was built in 2007. An elevator installation to the basement will make it ADA compliant, thereby improving the access to and use of building services by all library users, including those with physical disabilities. |
| Red Creek Free Library |
6817 Main Street
PO Box 360 Red Creek NY 13143 |
$34,281 |
The library will purchase the adjacent two-story building and will expand the current library into the first floor space, thereby increasing the effectiveness of library service due to increased building space and capacity. |
| Sodus Community Library |
17 Maple Avenue
Sodus NY 14551 |
$191,055 |
The library will construct an addition to connect its existing building with the adjacent building, thereby increasing effectiveness of library service due to increased and improved building space and capacity. |
County |
Assembly
District |
Senate
District |
Library |
Address |
Grant
Amount |
Project Description |
| Orange |
96 |
39 |
Josephine-Louise Public Library |
5 Scofield Street
Walden NY 12586-1798 |
$13,176 |
This project involves a plumbing upgrade for the staff bathroom, restoration of tile, and an upgrade of the sink and toilet. Additionally, the staff area will be rehabilitated with electrical upgrades and the installation of a sink and drain. All these items will create more efficient utilization of the building and increase staff efficiency. |
| Pine Bush Area Public Library |
223-227 Maple Avenue
PO Box 63 Pine Bush NY 12566-0063 |
$2,537 |
In order to preserve the building and maintain safe patron access, the front porch and side columns on the main library building will be renovated and the single-paned windows will be replaced for energy efficiency. |
| 97 |
38 |
Tuxedo Park Library |
227 Rte. 17 Box 776 Tuxedo Park NY 10987-0776 |
$45,236 |
The library will expand usable floor space, increase access to collections, and allow for additional use of the library and its programming. |
| 98 |
42 |
Port Jervis Free Library |
138 Pike Street
Port Jervis NY 12771-1879 |
$105,307 |
The library's mechanical systems (HVAC) will be improved for energy efficiency and cost savings; and site improvements and finishes will be made for a new parking lot for improved access to the building and for safety and security. |
| Rockland |
94 |
38 |
New City Free Library |
220 N. Main Street
New City NY 10956-4000 |
$67,120 |
The Audio/Visual area will be renovated to allow all materials to be placed in the public area and to merchandise the collections in order to increase the effectiveness of library service. |
| Valley Cottage Free Library |
110 Rte. 303 Valley Cottage NY 10989-1805 |
$42,918 |
To promote greater energy conservation and reduced costs, the library will replace metal halide parking lot lighting with energy efficient LED fixtures and replace a 30-year old boiler with a high efficiency boiler. |
| 95 |
Palisades Free Library |
19 Closter Road
PO Box 610 Palisades NY 10964-0610 |
$10,844 |
The library will conserve energy by replacing old light fixtures with more energy efficient ones. |
| Tappan Library |
93 Main Street
Tappan NY 10983-2400 |
$152,862 |
The library will reframe/replace the existing structure, install new windows/doors, replace siding/roof, construct connection, electrical services/wiring, and plumbing/HVAC to create an improved building space. |
| 96 |
Rose Memorial Library Association |
79 E. Main Street
Stony Point NY 10980-1619 |
$36,219 |
The library will renovate and restore the foundation and stairs of the Kennedy Wing, adding a chair lift and accessible bathrooms, to provide accessibility for all library users, including those with physical disabilities. |
| Sullivan |
98 |
42 |
Daniel Pierce Library |
328 Main Street
PO Box 268
Grahamsville NY 12740-0268 |
$58,574 |
The library will improve safe access to the library building by paving 20,200 square feet of the parking lot; as well as through the installation of a safety railing on a granite wall, parking lot lighting, and an exterior electric transformer safety barricade. |
| Livingston Manor Free Library |
92 Main Street Livingston Manor NY 12758 |
$3,275 |
The second floor archive will be improved through the replacement of the ceiling, insulation, floor and storage space for energy conservation and secure storage. |
| Roscoe Free Library |
85 Highland Avenue
PO Box 339 Roscoe NY 12776-0339 |
$9,475 |
All of the current accessibility, efficiency, and technological needs of the library will be addressed through a new roof and insulation, replacement of an access ramp, and creation of a "homework help" area within the library to increase the effectiveness of library service. |
| Western Sullivan Public Library |
19 Center Street
PO Box 594 Jeffersonville NY 12748-0594 |
$98,721 |
The library will install an elevator to make all levels of the building accessible and will build an ADA-compliant bathroom. |
County |
Assembly
District |
Senate
District |
Library |
Address |
Grant
Amount |
Project Description |
| Hamilton |
113 |
45 |
Long Lake Library |
1195 Main Street
HC-01 Box 35 Long Lake NY 12847-9720 |
$9,924 |
The library will insulate the building roof with an approved spray-type foam, thereby reducing energy consumption and costs. |
| Saratoga |
106 |
43 |
Waterford Public Library |
117 Third Street
Waterford NY 12188-1939 |
$25,814 |
This phase of the project focuses on improving visual and physical accessiblity in the Adult Collection Space by installing new furnishings, thereby increasing building capacity. |
| 110 |
Saratoga Springs Public Library |
49 Henry Street
Saratoga Springs NY 12866-3271 |
$217,903 |
Library space will be reconfigured to improve accessibility, security, and efficiency; and to increase Internet access by expanding computer resources. |
| Southern Adirondack Library System |
22 Whitney Place
Saratoga Springs NY 12866-4596 |
$60,227 |
Existing office space will be renovated to build a State-of-the-Art technology training room to meet the objectives of the SALS 2012-2016 Plan of Service. |
| 112 |
Stillwater Free Library |
74 S. Hudson Avenue
PO Box 485 Stillwater NY 12170-0485 |
$2,649 |
The library's 38-year-old furnace will be replaced with a newer, more efficient model as recommended by HVAC experts to reduce energy consumption and costs. |
| Warren |
113 |
45 |
Crandall Public Library |
251 Glen Street
Glens Falls NY 12801 |
$3,533 |
Countertop space with electrical outlets will be added to accommodate up to four customers for laptop computer use in the new book area, thereby improving the effectiveness of library service. |
| Stony Creek Free Library |
37 Harrisburg Road
PO Box 64 Stony Creek NY 12878-0064 |
$2,590 |
The library will replace single-pane windows in the 1960 building section and old fluorescent light fixtures in the entire library to improve interior space and to reduce energy consumption and energy costs. |
County |
Assembly
District |
Senate
District |
Library |
Address |
Grant
Amount |
Project Description |
| Allegany |
147 |
57 |
Essential Club Free Library |
11 Pratt Street
Canaseraga NY 14822-0074 |
$6,775 |
The library will renovate a small, inadequate history room for increased effectiveness of library service due to increased and improved building capacity. |
| 149 |
David A. Howe Public Library |
155 N. Main Street
Wellsville NY 14895-1149 |
$99,739 |
The library will address energy, safety and ADA access by replacing windows/doors, installing lights, and rebuilding entry steps and an ADA ramp. |
| Chemung |
137 |
53 |
Chemung County Library District-Big Flats |
78 Canal Street
Big Flats NY 14814 |
$30,228 |
The library will install carpeting, energy efficient windows for reduced energy consumption and costs, and will construct a new handicapped-accessible circulation desk for greater staff efficiency and improved access to building services by all library users. |
| Chemung County Library District- Elmira |
101 E. Church Street
Elmira NY 14901-2740 |
$46,432 |
The library will build a computer training room, quiet room, program area, and circulation desk for increased effectiveness of library services. |
| Chemung County Library District-Horseheads |
405 S. Main Street
Horseheads NY 14845 |
$26,284 |
The library will construct a handicapped access circulation desk for greater staff efficiency and improved access to building services by all library users |
| Chemung County Library District-West Elmira |
1231 W. Water Street
Elmira NY 14901 |
$22,375 |
The project involves the Installation of energy efficient windows for reduced energy consumption and costs; construction of new handicapped accessible circulation desk for greater staff efficiency and improved access to building services by all library users. |
| Steuben |
136 |
53 |
Addison Public Library |
6 South Street
Addison NY 14801-1303 |
$3,472 |
The renovation will provide handicap access to computers, more convenient/safer bookshelves and improved staff monitoring of computer/printer activity. |
| Savona Free Library |
15 McCoy Street
PO Box 145
Savona NY 14879-0475 |
$74,852 |
The library will improve services with increased space and capacity by restoring adjacent meeting and office space and adding a new book storage facility. |
| Southeast Steuben County Library |
300 Civic Plaza Suite 101 Corning NY 14830-2897 |
$50,557 |
The library will undertake drop ceiling replacement and renovation of the Laura Beer Community Room, which will increase the effectiveness of library service. |
| Wimodaughsian Free Library |
19 West Main Street
Canisteo NY 14823-1005 |
$9,225 |
The library will replace the existing roof for building maintenance and energy efficiency. |
County |
Assembly
District |
Senate
District |
Library |
Address |
Grant
Amount |
Project Description |
| Suffolk |
1 |
1 |
Floyd Memorial Library |
539 First Street Greenport NY 11944-1399 |
$41,500 |
The library will replace an unreliable elevator, resulting in improved access to and use of building services by all library users, including those with physical disabilities. |
| Riverhead Free Library |
330 Court Street Riverhead NY 11901-2885 |
$12,425 |
The library will replace the existing metal halide parking lot lighting with energy efficient, brighter LED lighting for increased safety and energy savings. |
| Shelter Island Public Library |
37 N. Ferry Road
Shelter Island NY 11964-2016 |
$37,810 |
The library will install an elevator for patron, staff and volunteer use, thereby improving access to and use of building services by all library users, including those with physical disabilities. |
| 2 |
Center Moriches Free Public Library |
235 Main Street
Center Moriches NY 11934-2405 |
$119,843 |
The library will construct two one-story additions totaling 6,198 square feet, renovate an existing building for increased effectiveness of library service, install a new fire sprinkler system throughout, and do minor site work. |
| John Jermain Memorial Library |
201 Main Street
Sag Harbor NY 11963-3043 |
$157,023 |
The library will fully restore the 101-year old library facility and double existing square footage to provide accessibility, safe lighting and HVAC systems. |
| Rogers Memorial Library |
91 Coopers Farm Road Southampton NY 11968-4832 |
$45,713 |
The library will construct a 30' x 16' utility building to store library supplies and to provide workshop space for the building manager, thereby increasing the effectiveness of library service through increased staff efficiency. |
| 3 |
Patchogue-Medford Library |
54-60 E. Main Street
Patchogue NY 11772-3168 |
$82,250 |
The library will renovate the passenger and freight elevators, including new mechanicals, ADA compliance, and modifications to the electrical and fire safety system, to increase access and safety in the library facility. |
| 4 |
2 |
Middle Country Public Library |
101 Eastwood Blvd.
Centereach NY 11720-2745 |
$39,344 |
The library will renovate the return room and circulation area/office; install sorters and self-check/return stations; and build an office addition, thereby increasing the effectiveness of library service. |
| 5 |
3 |
Sachem Public Library |
150 Holbrook Road
Holbrook NY 11741-1399 |
$42,523 |
The library will make interior alterations to increase the effectiveness of library service by moving adult collections for easier access, creating new seating areas, and expanding Teen areas for study and enrichment. |
| 7 |
2 |
Smithtown Library (The)- Kings Park |
1 Church Street
Kings Park 11754 |
$72,523 |
The library will build a 1,500 square foot addition and renovate the basement with asbestos abatement, new windows, auto entry doors, HVAC, sprinklered fire protection, an elevator, and ADA compliance. |
| 9 |
Commack Public Library |
18 Hauppauge Road
Commack NY 11725-4498 |
$10,000 |
The parking lot will be repaired and renovated to create a more efficient, safe area for handicapped parking and access. |
| Northport Public Library |
151 Laurel Avenue Northport NY 11768-3195 |
$20,000 |
Brick supported by a rusting steel lintel will be replaced with a concrete haunch, sidewalks will be replaced and two ADA parking stalls will be added, resulting in a safer building and improved access to the building by all library users, including those with physical disabilities.. |
| 10 |
5 |
Smithtown Library (The) |
148 Smithtown Blvd. Nesconset NY 11767 |
$62,936 |
The library will build a 6,000 square foot addition, which will include new windows, doors, and auto entry doors; along with new HVAC and a new fire protection system with sprinklers. This facility is pursuing LEED certification. |
| |
South Huntington Public Library |
145 Pidgeon Hill Road Huntington Station NY 11746-4511 |
$83,023 |
The library will conduct a 3,921 square foot alteration/reconstruction of existing storage/library to create a multi-use space for young adults to be shared by others during school hours, resulting in improved building space and services. |
| |
11 |
8 |
Amityville Public Library |
Corner of Oak & John Streets Amityville NY 11701-2922 |
$94,523 |
The library will achieve energy conservation and cost savings through the replacement of a shingled roof, the addition of insulation and a gable flat roof; the replacement of the HVAC system, five condensers and a gas burner; the installation of BMS; and relocated ductwork and air handler. |
| |
Copiague Memorial Public Library |
50 Deauville Blvd. Copiague NY 11726-4100 |
$29,523 |
The library will replace four 20+-year old, roof-top HVAC units, resulting in decreased energy and maintenance costs. |
County |
Assembly
District |
Senate
District |
Library |
Address |
Grant
Amount |
Project Description |
| Albany |
104 |
46 |
Albany Public Library |
161 Washington Avenue
Albany NY 12210 |
$166,148 |
The main library will make energy improvements including the repair of the original, leaking rear roof; upgrading the original, leaking windows; and changing overhead lighting fixtures, thereby improving energy use and reducting expenses. |
| Altamont Free Library |
171 Main Street Altamont NY 12009 |
$58,973 |
The library will focus on finishing and furnishing the Delaware and Hudson Train Station as a library, which will include the installation of a sprinkler system, thereby improving both library space and capacity. |
| Berne Public Library |
1763 Helderberg Trail
Berne NY 12023 |
$142,793 |
The library, town offices and town court share one small building. The town will purchase and renovate a church to become the library, thereby increasing capacity and services to patrons. |
| Town Of Westerlo Public Library |
604 State Route 143
PO Box 267 Westerlo NY 12193-0267 |
$12,342 |
The library will replace the roof and reconstruct the stone porch of the historic, 170-year old building, thereby preserving the building and the library's ability to provide services to the community. |
| Upper Hudson Library System |
28 Essex Street
Albany NY 12206 |
$97,350 |
The system will remove the current membrane roof and replace it with a new roof with R-20 insulation and a .060 EDM single-ply roof system, resulting in energy efficiency and reduced energy costs. |
| Rensselaer |
106 |
43 |
Troy Public Library |
100 Second Street
Troy NY 12180-4005 |
$32,350 |
The library will reconstruct the skylight over the stack area of the Lansingburgh Branch, including reglazing and replacing glass, structural repair and repainting, thereby preserving the building and its collections. |
| 108 |
Brunswick Community Library |
4118 State Hwy. 2
Troy NY 12180 |
$6,666 |
The library will apply insulation to the roof to improve energy utilization and will make minor repairs to rain-damaged areas. |
County |
Assembly District |
Senate
District |
Library |
Address |
Grant Amount |
Project Description |
| Westchester |
88 |
34 |
Eastchester Public Library |
11 Oak Ridge Place
Eastchester NY 10709-2098 |
$5,800 |
The library will add ADA door upgrades designed to improve access to the library for senior citizens, parents with strollers and young children, and handicapped patrons. |
| Town Of Pelham Public Library |
530 Colonie Avenue Pelham NY 10803 |
$53,500 |
The library will remove and replace an original Vermont slate roof that dates from 1935. Attic insulation will also be improved for further energy savings. |
| 89 |
40 |
Katonah Village Library |
26 Bedford Road
Katonah NY 10536-2121 |
$24,037 |
Broken sidewalks surrounding the library will be repaired: new stones will be installed, all stones regrouted, and a new septic pipewill be installed, resulting in improved access to and use of building services by all library users, including those with physical disabilities. |
| 90 |
37 |
Ossining Public Library |
53 Croton Avenue Ossining NY 10562-4903 |
$25,000 |
The library will upgrade their air conditioning and replace system components, and preserve the existing Geothermal wells and pumps for maximum energy savings. |
| 40 |
Hendrick Hudson Free Library |
185 Kings Ferry Road Montrose NY 10548-1236 |
$106,219 |
The library will increase effectiveness of library service by creating more study space; increasing office, storage and custodial space; offering patrons vending options; and increasing energy efficiency. |
| 91 |
37 |
New Rochelle Public Library |
One Library Plaza New Rochelle NY 10801 |
$214,413 |
The library will bring their theater into code compliance and, therefore, improve the building space and capacity to provide programming for the community. The scope of work addresses seating, fire suppression, egress, assistive listening, and HVAC. |
| Rye Free Reading Room |
1061 Boston Post Road
Rye NY 10580-2993 |
$51,545 |
The library will replace aging air conditioning systems and sewage ejector pumps, resulting in more efficient use of the building, energy conservation, and health and safety for all. |
| 92 |
35 |
Mount Pleasant Public Library |
350 Bedford Road Pleasantville NY 10570-3099 |
$241,133 |
The library's old, leaky roof will be removed and a new roof constructed, thereby maintaining the building and materials for community use and reducing energy and maintenance costs. |
| Warner Library |
121 N Broadway Tarrytown NY 10591-3203 |
$5,836 |
The library will install of security cameras throughout the public areas of the library to increase safety. |